Carbon Units were changed out with Maher Water Corp., and a licenced plumber from Chets Plumbing Service on November 4-5, 2015. Nine systems were serviced with new carbon filters and sediment filters were changed, and the water softners were re-set to alarm in one year for the next scheduled change out in 2016. The carbon units had been sampled the week of Nov 6th and results were received and all post treatment samples were non-detect for Volatile Organic Compounds (VOC's). One additional carbon unit at the former Unity Quick mart was sampled on December 3.
Six residential well samples were collected the first week of November. Additional residential samples were collected the week of November 16 and the first week of December 6. Five residential wells remain to be sampled. Data is being received, tabulated and will be placed on maps.
The carbon system was sampled at the Unity Quick Mart on December 3 2015.
The installation of 13 monitoring wells was completed on December 4, 2015. The wells have all been developed except 8D which will be developed today (Dec 4 2015). Monitoring wells will be bailed and sampled Dec 4- 6 and samples will be shipped to CT laboratories in Baraboo Wi.
Well locations and elevations will be surveyed December 4, 2015.
Drilling rigs, equipment and personnel will be demobilized Dec 4, 2015.
Sample residential carbon units (Dec 6)
Dispose of roll off box of soil (Dec 6)
Ship samples to lab (Dec 7)
Demobe personnel and equipment (Dec 7)
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
See the Final Site Investigation Plan and Enforcement Confidential Section in the Action Memo.
2.1.4 Progress Metrics
Waste Stream |
Medium |
Quantity |
Manifest # |
Treatment |
Disposal |
Water from drilling operations |
water |
4,500 gals |
|
on site carbon treatment |
|
Soil and Mud |
soil |
45 tons |
|
1 box staged on site,1 disposed of 12/3/15 |