CPR Train Derailment

All POL/SITREP's for this site CPR Train Derailment
Balltown, IA - EPA Region VII
POLREP #1
Initial Incident Progress Report
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
CPR Train Derailment - Removal Polrep
Initial Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region VII

Subject: POLREP #1
Initial Incident Progress Report
CPR Train Derailment

Balltown, IA
Latitude: 42.6618336 Longitude: -90.8493948


To:
From: Joe Davis, OSC (Duty Officer)
Date: 2/5/2015
Reporting Period: 2/4/2015, 1200 hrs. - 2/5/2015 1200 hrs.

1. Introduction
  1.1 Background
   
Site Number:      Contract Number:  
D.O. Number:      Action Memo Date:  
Response Authority: OPA    Response Type: Emergency
Response Lead: EPA    Incident Category: Removal Action
NPL Status: Non NPL    Operable Unit:
Mobilization Date: 2/5/2015    Start Date: 2/5/2015
Demob Date:      Completion Date:  
CERCLIS ID:    RCRIS ID:
ERNS No.:    State Notification:
FPN#: E15703    Reimbursable Account #:

1.1.1 Incident Category
OPA Emergency Response

1.1.2 Site Description

Canadian Pacific Railroad train derailment of denatured ethanol into the Mississippi River

1.1.2.1 Location
Right descending bank of the Mississippi River, 10 miles north of Dubuque, Iowa near Baltown, Iowa

1.1.2.2 Description of Threat
Discharge of approximately 20,000-30,000 gallons of denatured ethanol impacting the Mississippi River

1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
Ongoing

2. Current Activities
  2.1 Operations Section
    2.1.1 Narrative

At 1120 hours Central Time, Wednesday, February 4, 2015, a southbound Canadian Pacific freight train derailed eleven railcars on the right descending bank of the Mississippi River 10 miles north of Dubuque, Iowa near Baltown, Iowa. Approximately 20,000-30,000 gallons of product has discharged potentially impacting the Mississippi River. One railcar ignited as a result of the derailment. Up to six railcars containing ehtanol derailed also potentially involved in the discharge. Local, State and Federal responders are on the scene coordinating response efforts.


2.1.2 Response Actions to Date

 

On February 4th, 2015, 1153 hours Central Time, the EPA Region 7 Phone Duty officer Joe Davis Received NRC Report #1107313.  Davis contacted the Reporting Party, Canadian Pacific Railroad (CPR) for additional information.  Davis began notification activities (to EPA, IDNR, DOI, and other stakeholders).

At 1230 hours, OSC Davis notified (downstream) Dubuque (Eagle Point) Water District Manager, Robert Green, and forwarded a copy of the initial NRC Report.

At 1244 hours, Brent A. Earley, Water Quality Supervisor, Iowa American Water, notified other downstream water users in the area.

On February 4th, 2015, after noon, Iowa Department of Natural Resources (IDNR) deployed Chris Gelner from Field Office 1, in Manchester, Iowa.  US Coast Guard Sector Upper Mississippi River (UMR) deployed 2 Marine Safety Technicians from the Quad Cities MSD (less than two hours away).   

 

On February 4th, 2015, in the early evening, CPR deployed Emergency Response Manager, John Gibbons to the scene.  Gibbons mobilized contractors, Hulcher Services, and Conestoga-Rovers & Associates to the scene that evening.

On February 4th, 2015, at 2150 hours, EPA Duty Officer, Joe Davis received an update (by phone conversation) from Response Managers, Chad Livingston, and Gibbons (both with Canadian Pacific Railroad).  Livingston provided the following information and estimates;

-          Ten (10) rail cars are derailed.  Each of the cars contained approximately 28,000 gallons of denatured ethanol.

-          At least five of the cars appear to be breached, or have slow leaks (one tank is leaking approximately 5 gal per 10 minutes).

-          Two of the car are still on fire near the leak.  The fires may likely be out by morning. 

-          The other cars do not appear to be leaking.

-          Livingston estimates that approximately 5,000 – 50,000 gallons of product has been discharged at this time.

-          The contractor, Hulcher Services is on site and is planning to conduct transfer loading of the tanks in the morning.  Tank cars will then be removed.

-          The contractor, Conestoga-Rovers & Associates is on site to conduct safety/assessment sampling support.

-          Crews are currently working on improving/constructing an access road to the remote site.

At approximately 10:15 pm, the NRC issued an updated report, #1107830 as follows:

DESCRIPTION OF INCIDENT        

AT 1620Z (ZULU time), A SOUTHBOUND CANADIAN PACIFIC FREIGHT TRAIN DERAILED ELEVEN (11)  RAILCARS ON THE RIGHT DESCENDING BANK OF THE MISSISSIPPI RIVER. ONE (1) OF  THE CARS CARGO CONSIST OF SAND, THE REMAINING TEN (10) CARS CONTAIN  ETHANOL. SIX (6) CARS HAVE BEEN COMPROMISED (3 ON THEIR SIDE, 3 UPRIGHT).  APPROXIMATELY 20,000-30,000 GALLONS OF PRODUCT HAS DISCHARGED, WITH AN  UNCONFIRMED AMOUNT IMPACTING THE MISSISSIPPI RIVER. THERE IS A POTENTIAL  MAJOR INLAND RELEASE OF 186,000 GALLONS OF PRODUCT. NO INJURIES REPORTED.  AS A RESULT OF IMPACT ONE RAILCAR IGNITED IN FIRE.

 *** THIS IS AN UPDATED REPORT, REFERENCE NRC REPORT # 1107313***

------------------------------------------------------------------------------------------------------------------------------

On February 5, 2015, at 1915 hours, Phone Duty Officer, Joe Davis received an update (by phone conversation) from Response Manager Gibbons (CPR).  Gibbons stated the following information points:

-          Hulcher (contractor) has isolated the derailed cars from the unaffected rail cars.  Hulcher started transfer offloading of the damaged cars.  The cars will be removed from the area after the contents has been removed.

-          CPR and their contractor, Conestoga-Rovers & Associates (CRA) have developed a sampling plan in coordination with IDNR (on-site last night).  Ten (10) water sample locations (1 – upstream, and 9 – downstream) will be sampled for ethanol, dissolved oxygen, and gasoline range organics (GRO).   Sampling was conducted  last night at the Mud Lake area (marina & park) downstream of the scene.

-          Gibbons and CRA are planning to access the river this morning (by air boat) to conduct assessment and additional sampling.

Additional Updates:

US Fish and Wildlife Service staff (Richard King) will deploy an airboat on the morning of February 5th to assess possible environmental damages to the Upper Mississippi River National Wildlife and Fish Refuge.  They expect launch around 0930 hours. 

EPA R7 & 5, in coordination with the Upper Mississippi River Basin Association, have provided additional planning information (response strategies, sensitive ecosystem data) to the PRP.  This information is being incorporated into the incident response planning.

EPA Region 7 has dispatched On-Scene Coordinator (OSC) Eric Nold and one START contractor to the incident this morning at 0900 hours.  OSC Nold should be on the scene early afternoon of February 5th.


2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)

The RP has been identified as Canadian Pacific Railroad (CPR).


2.1.4 Progress Metrics

Waste Stream Medium Quantity Manifest # Treatment Disposal
           
           
           


  2.2 Planning Section
    2.2.1 Anticipated Activities

OSC Eric Nold will arrive on the scene on February 5, 2015.  He will integrate into the standing Incident Command Structure. Nold will assess current RP response activities, and will support and/or initiate additional response actions as needed.

2.2.1.1 Planned Response Activities

OSC Nold will continue to monitor/support response actions at the scene and coordinate closely with local, state, and federal officials.  Additiona updates will be provided as they are available.

2.2.1.2 Next Steps

2.2.2 Issues

  2.3 Logistics Section
    Logistical issues are being handled by the RP and local IC.

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    2.5.1 Safety Officer
Safety responsibilities are being fulfilled by the local IC and the RP.  EPA will integrate into the ICS structure at the scene.

2.5.2 Liaison Officer
N/A

2.5.3 Information Officer
EPA Region 7 PIOs are coordinating with the IDNR PIO. 

3. Participating Entities
  3.1 Unified Command
The local Fire Department is the Incident Command.  EPA will integrate into the existing ICS structure and support the local IC and State of Iowa.

3.2 Cooperating Agencies
USCG Sector UMR
EPA Region 5
IDNR
USFWS
local Fire Department

4. Personnel On Site
  EPA OSC Eric Nold
START contractor - 1

5. Definition of Terms
  No information available at this time.

6. Additional sources of information
  6.1 Internet location of additional information/report

6.2 Reporting Schedule
Polreps will be generated at least daily at approximately 1200 hours Central Time for the next 48 hours.  As the situation develops, the schedule may be more frequent.

7. Situational Reference Materials
  No information available at this time.