POLREP #10
Progress
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
BNSF Galena Derailment - Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region V

Subject: POLREP #10
Progress
BNSF Galena Derailment
E15510
Galena, IL
Latitude: 42.3744730 Longitude: -90.4443060


To:
From: Jaime Brown, OSC
Date: 3/24/2015
Reporting Period: 3/20/2015 - 3/24/2015

1. Introduction
  1.1 Background
   
Site Number: E15510    Contract Number:  
D.O. Number:      Action Memo Date:  
Response Authority: OPA    Response Type: Emergency
Response Lead: PRP    Incident Category: Removal Action
NPL Status: Non NPL    Operable Unit:
Mobilization Date: 3/5/2015    Start Date: 3/5/2015
Demob Date:      Completion Date:  
CERCLIS ID:    RCRIS ID:
ERNS No.:    State Notification:
FPN#: E15510    Reimbursable Account #: Z5PL

1.1.1 Incident Category
Emergency Response

1.1.2 Site Description
See POLREP #5

1.1.2.1 Location
See POLREP #5

1.1.2.2 Description of Threat
See POLREP #5

1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
See POLREP #5

2. Current Activities
  2.1 Operations Section
    2.1.1 Narrative
The water treatment system deployed to treat contact water from the excavation area was constructed and tested. A contract was awarded and excavation of contaminated soils is underway. Remaining US EPA personnel demobilized and field oversight personnel from Illinois EPA are on site to oversee the excavation.

2.1.2 Response Actions to Date
During this reporting period, the following field activities took place:

- Daily surface water samples continued to be taken at the source and upstream/downstream locations;
- Roadway repairs & maintenance continued on roads to & from the Site, particularly on Pilot Knob Road;
- A water treatment system was assembled at the Site to treat contact water during excavation activities; and
- Heavy equipment was mobilized & excavation of contaminated soils commenced.

There continues to be no visual or monitoring data evidence to indicate that any spilled product has impacted either the Galena or Mississippi Rivers. 

To date, the following environmental monitoring & sampling has taken place to determine impacts to the environment:

- 4300 real-time air monitoring readings were taken (3/5 - 3/11) at 9 fixed locations for VOCs & PM2.5;
- 75 air samples were collected & analyzed in a laboratory for VOCs & PAHs;
- 143 soil samples from 39 borings were analyzed in a laboratory for PNAs, BTEX & TPH (DRO/GRO/ERO);
- Surface water samples were taken daily at the source (wreck site), 4 upstream & 5 downstream locations (3/7 - 3/11) for field parameters (depth, flow, temp, DO, ORP, conductivity & pH) and VOCs, PNAs, BTEX, TPH (DRO, GRO, ORO) analysis in a laboratory; and
- Surface water sampling continues daily at the source, 2 upstream & 2 downstream locations (3/11 - present).

River levels were tracked throughout the response in the Galena River at Buncombe, WI and in the Mississippi River at Dubuque, Iowa and Bellevue, Iowa. Monitoring, sampling and river level data can be found in summary form in the 'documents' section of the website.

There were no injuries at the Site or wildlife impacts reported during the reporting period.

2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
See POLREP #5

2.1.4 Progress Metrics (totals to date)
Waste Stream Medium Quantity Manifest # Treatment Disposal
Crude oil   liquid  223,795 gal  TBD  staged  TBD
Oil/water mixture  liquid  27,825 gal  TBD  staged  TBD
Contaminated soil  solid  TBD  TBD  staged  TBD
Tanker cars  solid  12  NA  salvage  scrap


  2.2 Planning Section
    2.2.1 Anticipated Activities

- Illinois EPA and US EPA will coordinate in oversight of continuing response activities to ensure protection of public health & the environment; 
- Excavation & backfilling activities will be completed; 
- Planning will commence to develop a restoration plan for the impacted area; and
- BNSF will continue containment/monitoring of the release.

2.2.1.1 Planned Response Activities
Response activities continue under the IAP for OP#10 until 0700 hrs on 3/25/2015. The Unified Command will formally dissolve on 3/25/2015 and no further IAPs are anticipated. US EPA transitioned oversight of excavation operations to Illinois EPA Project Manager Jeff Guy on 3/20/2015.

2.2.1.2 Next Steps
Illinois EPA and US EPA will coordinate in oversight of continuing response activities. US EPA and Illinois EPA representatives plan to attend an 'After Action Report' coordination meeting on 3/27/2015 in Galena, Illinois.

2.2.2 Issues
Correspondence was sent on 3/24/2015 from US EPA to Illinois EPA indicating that the water treatment plant on site to treat contact water from the excavation area is exempt from NPDES permitting requirements pursuant to Section 311 of the Clean Water Act, 40 CFR Part 122.3(d) of the NPDES regulations, and the NCP until the excavation & backfilling activities are completed.

  2.3 Logistics Section
    A command post is located off of Pilot Knob Road to support ongoing response activties.

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    2.5.1 Safety Officer
Safety briefings are still held each day for individual contractor personnel by their respective field supervisors.

2.5.2 Liaison Officer
A briefing for Congressional representatives was held on 3/23/2015.

2.5.3 Information Officer
US EPA to respond to press inquiries and requests for interviews and information related to the incident upon request. A website for the incident (see link in Section 6.2) continues to be updated.

3. Participating Entities
  3.1 Unified Command
The UC will formally dissolve on 3/25/2015. The Illinois EPA representative from the Illinois Site Remediation Program (Jeff Guy) is managing the remediation phase of the response with assistance from field personnel from the Illinois EPA Rockford Field Office.

3.2 Cooperating Agencies
See POLREP #5

4. Personnel On Site
  FEDERAL: 0*
STATE: 1
BNSF: 1
CONTRACTORS: 20

TOTAL (estimated): 22

*OSC Kimble demobilized from the Site on 3/24/2015 @ 0800hrs.

5. Definition of Terms
  bgs            below ground surface
BNSF        Burlington Northern Santa Fe
BTEX         Benzene, Toluene, Ethylbenzene, Xylene
CTEH        Center for Toxicology and Environmental Health LLC
CWS         Clean Water Act
DO            Dissolved Oxygen
DRO          Diesel Range Organics
ERO          Extended Range Organics
ERRS        Emergency and Rapid Response Services
FPN           Federal Project Number
GRO          Gasoline Range Organics
HASP        Health & Safety Plan
IC              Incident Commander
ICP            Incident Command Post
ICS            Incident Command System
IMT            Incident Management Team
MCP          Mobile Command Post
NCP          National Contingency Plan
NPDES      National Pollution Discharge Elimination System
NRC          National Response Center
OP            Operational Period
OPS          Operations Section Chief
ORO          Oil Range Organics
ORP          Oxidation Reduction Potential
OSC          On-Scene Coordinator
PAH          Polycyclic Aromatic Hydrocarbon
PM            Particulate Matter
PNA          Polynuclear Aromatic Hydrocarbon
POLREP    Pollution Report
SDS           Safety Data Sheet
Sitrep         Situation Report
START       Superfund Technology Assessment and Response Team
TDD           Technical Direction Document
TPH           Total Petroleum Hydrocarbons
UC            Unified Command
US FWS    United States Fish & Wildlife Service
VOC          Volatile Organic Compound

6. Additional sources of information
  6.1 Internet location of additional information/report
http://www.epaosc.org/bnsfgalenaspill

http://www2.epa.gov/il/galena-train-derailment

6.2 Reporting Schedule
The next POLREP will be issued at the conclusion of excavation & backfilling operations.

7. Situational Reference Materials