1. Introduction
|
|
1.1 Background
|
|
|
Site Number: |
07WT |
|
Contract Number: |
|
D.O. Number: |
|
|
Action Memo Date: |
6/4/2014 |
Response Authority: |
CERCLA |
|
Response Type: |
Non-Time-Critical |
Response Lead: |
PRP |
|
Incident Category: |
Removal Action |
NPL Status: |
NPL |
|
Operable Unit: |
06 |
Mobilization Date: |
4/6/2015 |
|
Start Date: |
5/4/2015 |
Demob Date: |
|
|
Completion Date: |
|
CERCLIS ID: |
|
|
RCRIS ID: |
|
ERNS No.: |
|
|
State Notification: |
|
FPN#: |
|
|
Reimbursable Account #: |
|
1.1.1 Incident Category
Please refer to POLREP #1 for Incident Category.
1.1.2 Site Description
Please refer to POLREP #1 for Site Description.
1.1.2.1 Location
Please refer to POLREP #1 for Site Location.
1.1.2.2 Description of Threat
Please refer to POLREP #1 for Description of Threat.
1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
Please refer to POLREP #1 for RA/RSE Results.
|
2. Current Activities
|
|
2.1 Operations Section
|
|
|
2.1.1 Narrative
Please refer to POLREP #1 for Site Narrative.
2.1.2 Response Actions to Date
Please refer to POLREPs 1-4 for previous response actions.
During the past six weeks, the PRP was able to complete the excavation and soil hauling to the land farm for on-site treatment. To date, approximately 7,650 cubic yards of material have been excavated and sent to the landfarm for remediation. Of that amount, roughly 100 cubic yards of material has been successfully remediated and stockpiled for shipment back to the MPA to begin filling the excavation. Wind rowing and soil remediation activities continue at the landfarm and each hot, dry passing day yields additional remediated material. The SVE system has been installed and plumbed, and preliminary testing is scheduled to commence the first week of August 2015.
Uncontaminated asphalt and concrete that had been removed from the surface of the excavation area was shipped off site to be reused/recycled.
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
Please refer to POLREP #1 for PRP information.
2.1.4 Progress Metrics
Waste Stream |
Medium |
Quantity |
Manifest # |
Treatment |
Disposal |
Soil |
solid |
7,650 yd3 |
|
land farming |
n/a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2.2 Planning Section
|
|
|
2.2.1 Anticipated Activities
Test run of the SVE and calibration is expected over the next couple of weeks.
2.2.1.1 Planned Response Activities
Proceeding with efforts to get the SVE system operational and continued landfarming.
2.2.1.2 Next Steps
Test run of SVE system, begin process of scraping, testing, and removing remediated material from the landfarm to the excavation to refill the excavated areas.
2.2.2 Issues
Site workers continue to coordinate disposal efforts with the EPA and MDNR. Weather is still causing site issues but is being dealt with as effectively as is possible.
|
|
2.3 Logistics Section
|
|
|
N/A
|
|
2.4 Finance Section
|
|
|
No information available at this time.
|
|
2.5 Other Command Staff
|
|
|
2.5.1 Safety Officer
The PRP is providing the SSO; the EPA OSC will be in charge of EPA safety.
2.5.2 Liaison Officer
N/A
2.5.3 Information Officer
Brendan Corazin is the CES for the site:
(913) 551-7429
|
3. Participating Entities
|
|
3.1 Unified Command
N/A
3.2 Cooperating Agencies
US DOD
MO National Guard
USACE
EPA
MDNR
|
4. Personnel On Site
|
|
7 to include:
1 - EPA OSC
2 - FTCH Project Managers
3 - ASI
1 - TDY PRP Project Manager
|
5. Definition of Terms
|
|
N/A
|
6. Additional sources of information
|
|
6.1 Internet location of additional information/report
N/A
6.2 Reporting Schedule
POLREPS will be generated quarterly from now on, or as needed, until further notice.
|