U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Permafix of South Georgia

Images

All Images [50]
Categories
Smoldering drums at Permafix explosion.<br />Date Taken: 8/15/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Permafix Explosion<br />Date Taken: 8/15/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Smoke in the secondary containment area with Chloroform drums on the left.<br />Date Taken: 8/15/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Outside of facility entrance, City of Valdosta Police Department and Fire Department.  Cardinal direction:  west<br />Date Taken: 8/16/2013<br />Category: Site Photo<br />Latitude: 30.7971470971925<br />Longitude: -83.2802939414978<br />Tags:
Evaluating drums in receiving area to determine if they are empty or full.<br />Date Taken: 8/18/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Drums at the receiving area/loading dock after the roof has been removed.<br />Date Taken: 8/18/2013<br />Category: Site Photo<br />Latitude: 30.7972945516945<br />Longitude: -83.2806587219238<br />Tags:
Drums in secondary containment.<br />Date Taken: 8/17/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Portion of the facility unaffected by the fire with drums intact.  Cardinal direction:  southeast.<br />Date Taken: 8/16/2013<br />Category: Site Photo<br />Latitude: 30.7974051424226<br />Longitude: -83.280867934227<br />Tags:
Excavators removing the roof and staging drums for evaluation and sampling.<br />Date Taken: 8/18/2013<br />Category: Site Photo<br />Latitude: 30.7969627787468<br />Longitude: -83.2810771465302<br />Tags:
The drainage pipe and ditch with runoff, at the rear of the facility approximately 10 feet from the fence lining the property.  Facing north.<br />Date Taken: 8/15/2013<br />Category: Site Photo<br />Latitude: 30.7978701<br />Longitude: -83.2786023<br />Tags:
The dammed tributary located behind a neighboring facility.  Absorbent boom are located in the center left of the photo, and the berm/dam in the bottom right corner.  Cardinal direction:  north.<br />Date Taken: 8/15/2013<br />Category: Site Photo<br />Latitude: 30.7966125727265<br />Longitude: -83.2816779613495<br />Tags:
A downstream portion of the tributary behind the neighboring facility showing the absorbent booms and the berm/dam.  Cardinal direction:  southwest<br />Date Taken: 8/15/2013<br />Category: Site Photo<br />Latitude: 30.796607964744<br />Longitude: -83.2816725969315<br />Tags:
Bulging and damaged drums within facility<br />Date Taken: 8/15/2013<br />Category: Site Photo<br />Latitude: 30.7971194494482<br />Longitude: -83.2808840274811<br />Tags:
The front entrance to the facility facing west-northwest.<br />Date Taken: 8/15/2013<br />Category: Site Photo<br />Latitude: 30.7971839608392<br />Longitude: -83.2802832126617<br />Tags:
Exploded drums and waste within the facility.  Frac tank in top right corner.  Cardinal direction:  east-southeast<br />Date Taken: 8/16/2013<br />Category: Site Photo<br />Latitude: 30.7972023926573<br />Longitude: -83.2809698581696<br />Tags:
Bulging, unlabeled drums.<br />Date Taken: 8/15/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Inside the facility near the point of explosion.  Cardinal direction:  south<br />Date Taken: 8/16/2013<br />Category: Site Photo<br />Latitude: 30.7971563131055<br />Longitude: -83.2810878753662<br />Tags:
Area where the incident occurred, showing where the forklift empties the waste drums into the mixing unit.<br />Date Taken: 8/16/2013<br />Category: Site Photo<br />Latitude: 30.7972300403777<br />Longitude: -83.2809913158417<br />Tags:
Area within the facility where the incident occurred.  The mixer to accept the 55-gallon drum of waste is shown left center.  Cardinal direction:  south-southeast<br />Date Taken: 8/16/2013<br />Category: Site Photo<br />Latitude: 30.7972116085649<br />Longitude: -83.2809805870056<br />Tags:
Retainer wall around the area where the incident occurred with frac tank in view.  Cardinal direction:  south<br />Date Taken: 8/16/2013<br />Category: Site Photo<br />Latitude: 30.7971286653638<br />Longitude: -83.2809269428253<br />Tags:
Area within the facility where the incident first occurred showing the forklift and mixer tank.  Cardinal direction:  west.<br />Date Taken: 8/16/2013<br />Category: Site Photo<br />Latitude: 30.7972023926573<br />Longitude: -83.2809269428253<br />Tags:
Drum crusher located next to the area where the incident occurred.  Cardinal direction:  east<br />Date Taken: 8/16/2013<br />Category: Site Photo<br />Latitude: 30.7972392562828<br />Longitude: -83.2810664176941<br />Tags:
Drums and containers unaffected by the incident.  Cardinal direction:  southwest<br />Date Taken: 8/16/2013<br />Category: Site Photo<br />Latitude: 30.7975618124029<br />Longitude: -83.2809591293335<br />Tags:
Water in the tertiary containment prior to being released.<br />Date Taken: 8/17/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Crushing drums in the secondary containment.<br />Date Taken: 8/17/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Excavators removing the damaged roof of the receiving area.<br />Date Taken: 8/18/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Vac truck operations in the secondary containment.<br />Date Taken: 8/18/2013<br />Category: Site Photo<br />Latitude: 30.79702<br />Longitude: -83.2809<br />Tags:
The tributary downstream of nearby railroad tracks, upstream of the confluence with Mud Creek.  Cardinal direction:  north<br />Date Taken: 8/15/2013<br />Category: Site Photo<br />Latitude: 30.7925758954408<br />Longitude: -83.2760238647461<br />Tags:
A small reach of the tributary, upstream of the confluence.  Slight sheen on water surface.  <br />Date Taken: 8/15/2013<br />Category: Site Photo<br />Latitude: 30.7957186199946<br />Longitude: -83.2816565036774<br />Tags:
The confluence of the tributary into Mud Creek.  Mud Creek was stained with tannins.<br />Date Taken: 8/15/2013<br />Category: Site Photo<br />Latitude: 30.7957186199946<br />Longitude: -83.2816565036774<br />Tags:
Along Mud Creek just downstream of the confluence with the tributary.  Slight sheen on the water surface.  Cardinal direction: east<br />Date Taken: 8/15/2013<br />Category: Site Photo<br />Latitude: 30.7955066506018<br />Longitude: -83.2816243171692<br />Tags:
Along Mud Creek downstream of the confluence with the tributary.  No fish kills observed.<br />Date Taken: 8/15/2013<br />Category: Site Photo<br />Latitude: 30.7954882184586<br />Longitude: -83.2817959785461<br />Tags:
The rear of the facility showing the area of the explosion, facing north-northeast<br />Date Taken: 8/15/2013<br />Category: Site Photo<br />Latitude: 30.7968153237359<br />Longitude: -83.2814633846283<br />Tags:
Fence along the rear of the facility where runoff is leaking through the retainer wall where cracks are observed, facing north-northwest<br />Date Taken: 8/15/2013<br />Category: Site Photo<br />Latitude: 30.7978701<br />Longitude: -83.2786023<br />Tags:
Hepaco prepares for Level B entry to sample unknown drums.<br />Date Taken: 8/19/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
START uses HazMat ID and HazCat kit to determine if sampled drum contains isocyanate.<br />Date Taken: 8/19/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Drums on receiving pad, staged for sampling.<br />Date Taken: 8/20/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Hepaco prepares for Level B entry to sample unknown drums.<br />Date Taken: 8/20/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Hepaco begins overpacking known/marked chloroform drums to remove them from the unknown drum area.<br />Date Taken: 8/20/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Hepaco overpacks bulging Chloroform drums.  their labels remained intact during the fire.<br />Date Taken: 8/21/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Hepaco screens the tertiary water with teh FID.<br />Date Taken: 8/21/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
EPA collects water quality parameters prior to PermaFix discharging per their permit.<br />Date Taken: 8/21/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
EPA deploying AreaRae air monitors.<br />Date Taken: 8/21/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Hepaco removing sludge from the receiving area pad.<br />Date Taken: 8/21/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Hepaco operating the vac truck in Level C due to concentration increases on the southwest portion of the site.<br />Date Taken: 8/21/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Operations Meetings occurred twice daily at 10 am and 5 pm and included all UC participants.<br />Date Taken: 8/21/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
START measures vapors with the PID during removal at the receiving area pad.<br />Date Taken: 8/21/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Hepaco cleaning the receiving area pad.<br />Date Taken: 8/22/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
START and Hepaco complete a bench scale test of the solidification process.<br />Date Taken: 8/22/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Air monitoring during drum crushing and removal activities.<br />Date Taken: 8/22/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: