Vermiculite insulation pile before and after
Site Photo
7/1/2016
Basement Boiler Room Before and After
Site Photo
7/1/2016
Basement Before and after. Air sampling equipment is visible to on the left side of the after photo. This was taken while clean-up confirmation samples were being colected
Site Photo
7/1/2016
Approximately 0.25 Cubic Yards of pipe wrap bagged and labeled for disposal as asbestos containing materials.
Site Photo
6/30/2016
Workers continuously wet vermiculite insulation and cover skid steer buck while transferring asbestos contaminated insulation to containers for disposal.
Site Photo
6/30/2016
Pile of vermiculite insulation and debris was wetted and covered to prevent accidently disturbance and potential worker exposure during cleanup activities. The pile will be removed prior to project completions.
Site Photo
6/28/2016
Skid steer with demolition debris exiting school through main entry.
Site Photo
6/28/2016
Foreground: perimeter air monitoring and sampling outside basement window - asbestos air sample to the right sand particulate monitoring equipment to the left. Background: workers in level C protective clothing removing potentially contaminated debris and looking for additional pipe wrap.
Site Photo
6/28/2016
Asbestos workers a carefully place ACM pipe insulation in bag for disposal.
Site Photo
6/29/2016
View of vermiculite debris pile below rear entry
Site Photo
12/14/2015
Pile of debris containing asbestos and vermiculite insulation located below rear (north) entry on blacktop.
Site Photo
View of basement from rear (north) entry into main wing of school. Asbestos pipe wrap was found in boiler room shown in background to the right.
Site Photo
7/30/2015
Historic photo to the left and current photo to the right. All windows doors, roof, interior walls and floors have been removed.