Beads of mercury found in the former Shower/Break Room building
Site Photo
9/13/2016
Tank-O-Meters which were the source of mercury found in the Shower/Break Room building
Site Photo
9/13/2016
Clean up of mercury in former Shower/Break Room building
Site Photo
9/14/2016
Drums and waste containers stages in Hazardous Waste Storage building
Site Photo
9/12/2016
Sampling of drums in Hazardous Waste Storage Building
Site Photo
9/14/2016
Field testing (HAZCATTING) contents of drums.
Site Photo
9/15/2016
ERRS personnel consolidating ACM for load out. Water truck is utilized to mitigate dust.
Site Photo
9/26/2016
Perimeter Air Monitoring Station 002.The grey pelican case on the tripod contains a Dust Trak particulate monitor that is hooked up to a modem that transmits real time data to be monitored and stored. The blue tower beneath the stand is an Aircon2 high volume pump that is utilized to collect an air sample through a filter cartridge which will be analyzed for asbestos.
Site Photo
9/28/2016
Loading of wet Asbestos-containing debris to send to landfill
Site Photo
9/28/2016
Truck tires being washed prior to hauling ACM off site.
Site Photo
9/29/2016
Loading of PCB-containing capacitors for disposal
Site Photo
10/3/2016
Basement that was buried under ACM debris
Site Photo
10/5/2016
Collection of air filter cartridge from Air Con 2 unit
Site Photo
10/12/2016
Crews cleaned a PCB stained area of concrete found under the area PCB capacitors were found. The area was then wipe-sampled and sealed
Site Photo
10/20/2016
Crew placed dry ice and water into emptied ASTs to insure there was no explosive atmosphere in the tanks before cutting the tanks.
Site Photo
10/27/2016
Asbestos abatement is being conducted on an old office building along Jasper Street.
Site Photo
10/25/2016
Labeled roll off box of Asbestos Containing Materials
Site Photo
11/1/2016
Loading final shipment of drummed wastes
Site Photo
11/8/2016
Final view of main site area which was filled with ACM debris
Site Photo
11/4/2016