Image
Category
Date
Tags
Sangamon OU1 Restoration Completed
Site Photo
6/19/2018
View of temporary fence placed on the south end of the site along 18th Street looking northeast.
Site Photo
12/21/2017
View of temporary fence placed on the south end of the site along 18th Street looking north.
Site Photo
12/21/2017
View of the northern portion of the site with a placed and graded layer of gravel looking south.
Site Photo
12/21/2017
View of RP contractor shutting down and demobilizing air monitoring equipment.
Site Photo
12/21/2017
View of RP contractor reconstructing a portion of fence along the southern entrance to the site along West 18th Street.
Site Photo
12/21/2017
View of truck on site with a load of gravel.
Site Photo
12/21/2017
View of DustTrak in place for air monitoring just to the northwest of the northern site entrance.
Site Photo
12/6/2017
The northern portion of the site prior to rail line and vegetation removal.
Site Photo
12/6/2017
View of the center portion of the site rail line removed.
Site Photo
12/6/2017
View of vegetation and fence removed on the western boundary of the site.
Site Photo
12/6/2017
View of western boundary of the site with vegetation removed.
Site Photo
12/6/2017
View of the eastern boundary along the northern portion of the site.
Site Photo
11/27/2017
View of the site looking north.
Site Photo
11/27/2017
View of the entrance on the north end of the site looking north to BNSF owned active railway area.
Site Photo
11/27/2017
EPA, START, BNSF, Stiles, and TRC personnel conducting a site walk prior to beginning removal work.
Site Photo
11/27/2017
View of the south end of the site along West 18th Street.
Site Photo
11/27/2017
View of the site from the south end looking north.
Site Photo
11/27/2017