Rock barrier prohibiting access put in place Fall 2018
Site Photo
Rock barrier prohibiting access put in place Fall 2018
Site Photo
9/6/2019
Repos being constructed/prepped to receive tailings.
Site Photo
8/30/2019
Excavating tailings from the mill site.
Site Photo
9/4/2019
tailings being excavated from the original gulch channel.
Site Photo
9/6/2019
Profile of how much tailings were deposited in Red Cloud Gulch.
Site Photo
9/9/2019
Tailings being loaded for transport to the repository.
Site Photo
9/12/2019
Tailings being ecavated
Site Photo
9/6/2019
Repos with tailings being added.
Site Photo
9/6/2019
Base backfill staged at the base of excavation at the mill site
Site Photo
9/16/2019
Base backfill being spread at the mill site.
Site Photo
9/17/2019
Base backfill in place at the mill site.
Site Photo
9/17/2019
Base backfill, topsoil, seeded and covered with straw at the mill site.
Site Photo
9/23/2019
Mill site being restored, lined rock ditch along the road and large rocks preventing access to the area by motorized vehicles.
Site Photo
9/25/2019
Mill site fully restored, gulch channel and road ditch rock lined. Heavy amount of bio-debris throughout the site.
Site Photo
9/30/2019
Final restoration of the excavation area.
Site Photo
9/30/2019
Excavation area restored to USFS liking with basefill, topsoil, seeded, strawed and bio-debris throughout.
Site Photo
9/23/2019
Flood plan part of Wolftone Creek fully restored with lots of bio-debris atop clean backfill, seeded topsoil and straw. Large rocks line the road to prevent access by motorized vehicles.
Site Photo
9/30/2019
Repository bentomat liner being covered with 36" of clean backfill/topsoil.
Site Photo
9/24/2019
Repository completed with 36" of clean fill/topsoil on top of a bentomat and transnet liner. Seeded, covered with straw, straw wattles placed every 25' down the repos and ditch around the edge rock lined to divert water around the repos.
Site Photo
9/30/2019