Utility locate conducted at MTC.
November 2023 Sampling Event
11/28/2023
Utility locate conducted at RZA.
November 2023 Sampling Event
11/28/2023
Utility located conducted at LTC.
November 2023 Sampling Event
11/28/2023
Sub-slab pin #1 installation at MTC.
November 2023 Sampling Event
11/28/2023
Sub-slab pin #1 installation at MTC.
November 2023 Sampling Event
11/28/2023
Sub-slab pin water dam test at MTC #1.
November 2023 Sampling Event
11/28/2023
Sub-slab pin installation is completed and covered with a metal flushed cap at RZA #1.
November 2023 Sampling Event
11/28/2023
Sub-slab pin #2 installation in LTC.
November 2023 Sampling Event
11/28/2023
Completed sub-slab pin #1 installation at LTC.
November 2023 Sampling Event
11/28/2023
Sub-slab pin #1 installation at IPN.
November 2023 Sampling Event
11/28/2023
Sub-slab air sample collection at MTC #1.
November 2023 Sampling Event
11/29/2023
Sub-slab air sample collection at RZA #1.
November 2023 Sampling Event
11/29/2023
Sub-slab air sample collection at LTC #1.
November 2023 Sampling Event
11/29/2023
Sub-slab air sampling collection at CBC #1.
November 2023 Sampling Event
11/29/2023
Sub-slab air sample collection at CBC #2.
November 2023 Sampling Event
11/29/2023
Sub-slab air sample collection at DOS #1.
November 2023 Sampling Event
11/29/2023
Crawl space air sample collection at D9S.
November 2023 Sampling Event
11/30/2023
Sub-slab air sample and duplicate collection at IPN #1.
November 2023 Sampling Event
11/30/2023
Ambient outdoor air sample.
November 2023 Sampling Event
11/30/2023
Indoor air sample #1 at RZA.
November 2023 Sampling Event
11/30/2023