Image
Category
Date
Tags
General view of furnace impacted by elemental mercury.
Site Photo
9/23/2014
Furnace with cover emoved to expose ledge where elemental mercury beads were identified.
Site Photo
9/23/2014
Furnace ledge with visible mercury 'micro' beads.
Site Photo
9/23/2014
Furnace lip with visible mercury beads present
Site Photo
9/23/2014
General view of furnace/utility room where elemental mercury was identified in and around base of furnace.
Site Photo
9/23/2014
EPA contractor (ERRS) mercury HEPA vacuum.
Site Photo
9/23/2014
EPA Contractors (ERRS) in process of removing elemental mercury beads from furnace room floor near base of furnace.
Site Photo
9/23/2014
Furnace/utility room with misc. residential items removed to allow for clear operational area.
Site Photo
9/23/2014
Misc items temporarily removed from furnace/utility room to be screened with Lumex to determine if impacted by mercury and/or mercury vapor.
Site Photo
9/23/2014
Close-up of ERRS HEPA vacuum mercury chamber with elemental mercury beads comingled with furnace debris.
Site Photo
9/23/2014
View of furnace post remediation activities (HEPA vacuum and deionized water 'wipe down')
Site Photo
9/23/2014
Close-up of furnace ledge post remedial activities.
Site Photo
9/23/2014
Close-up of furnace with bottom cover removed to access base and investigate area around blower motor underneath ledge where elemental mercury beads were identified.
Site Photo
9/23/2014
Portion of broken mercury switch removed from internal componets of furnace.
Site Photo
9/24/2014
EPA contractors accessing internal cavity of mercury impacted furnace after removal of components.
Site Photo
9/24/2014
Potentialli mercury impacted clothes and miscellaneous residential personal items removed from furnace/laundry room staged on poly vinyl to inventory and air out.
Site Photo
9/24/2014
General view of furnace with internal componets removed.
Site Photo
9/24/2014