Julio Properties Site

Basemap:
Description: Restoration of lead in soil contamination excavation area adjacent to the MDNR trail.
Date Taken: 7/20/2021
Category: Site Photo  
Latitude:
47.1263916666667  
Longitude:
-88.5590277777778  
Tags:
 
  • Area 2 following scraping of contaminate...
  • Stockpiling of contaminated soils in Are...
  • Restoration of lead in soil contaminatio...
  • Restoration of excavated PCB contaminati...
  • Scraping of contaminated soil and debris...
  • Northern portion of Area 1 after scrapin...
  • Excavation of PCB contaminated soils in ...