Manila Lode

Basemap:
Description: EPA response team constructing the piping reroute for Toledo Tunnel drainage.
Date Taken: 7/16/2021
Category: Site Photo  
Latitude:
39.5865777777778  
Longitude:
-105.866736111111  
Tags:
Story Map