On-Scene Coordinator - Davis, Garvey, Nold 4/10/2004
Time-Critical - Removal Action Pollution Report (POLREP) #15
Start Date: 9/25/2003
Pollution Report (POLREP) #15
Site Description
The site is located in the Omaha metropolitan area and encompasses Council Bluffs, Iowa, Carter Lake, Iowa, and east Omaha, Nebraska. It is centered around downtown Omaha, Nebraska.

ASARCO Incorporated (ASARCO) operated a lead refinery at 500 Douglas Street in Omaha, Nebraska, for over 100 years beginning in the 1870s.  The operation of the refinery ceased in 1997.  As a routine part of the refinery operation, lead particles were emitted into the atmosphere at the refinery.  In addition, the Gould Incorporated Lead Battery Recycling Plant was located at 555 Farnam street in Omaha, NE., and was a secondary smelter of lead from discarded lead batteries. The blast furnace used to smelt the lead at the Gould plant emitted lead particles into the air from that refinery.  The Gould plant closed in 1982.

Several other facilities in the Omaha area used lead in their manufacturing processes.  A few of these included Carter White Lead at 21st and Locust Street, which produced white lead paint bases and red lead and litharge protective coatings until 1936, Omaha Shot and Lead, which later became Lawrence Shot and Lead, and then became National Lead Company which manufactured lead shot by melting pig lead, Grant Storage Battery Company, Storage Battery Factory, and Exide Corporation which manufactured lead storage batteries.  

Numerous other locations in the Omaha area such as foundries, iron works, metal salvaging companies and other manufacturers used or processed lead at their facilities.


Current Activities
On March 25,2004, an Action Memorandum Amendment was signed. This amendment changes the scope of work to include daycare facilities and elevated blood levels (EBLs) that were previously addressed under the first action memorandum, however, still addresses highly contaminated properties with soil concentrations of 1,200 milligrams per kilogram (mg/kg) or greater.

There will no longer be two separate (weekly) pollution reports (POLREPs) prepared for this site as all work will be conducted under one delivery order for the Emergency and Rapid Response Services (ERRS) contractor and one task order for the mini-Superfund Technical Assessment and Response Team (START) contractor.

Continued activities are being centralized from the Missouri River Treatment Plant located at 5600 S 10th Street, Omaha, Nebraska, 68107-3501. The city of Omaha has partnered with the EPA to allow the use of a portion of the facility.

There were 8 properties completed during this reporting period.  

Other activities included, the EPA passing out "Your Lawn Has Been Sodded" letters in English and Spanish to affected property owners to provide care and instructions for their newly replaced yards.


Planned Removal Actions
Continued prioritization will be given to EBLs, day care facilities, and highly contaminated properties where children seven years of age or younger live.

Next Steps
The Missouri River Treatment facility has encouraged the EPA to continue to utilize the same areas of the facility for another year under the existing terms as stated in the access agreement that  expires in May 2004.

The EPA was informed that an request for extension, allowing the EPA access to May 2005 would need to be prepared and sent to the city of Omaha.


Key Issues
There is a list of 570 properties, with greater than 1,200 ppm lead, that is currently being prioritized for this phase of the project.

An additional list of 10 EBLs was received.  Pre-walk thru property visits are being scheduled and excavation should begin on those properties on April 12, 2004.

After those prioritized properties have been cleaned, geographic locations will be utilized to maximize available resources


 
Disposition Of Wastes
All of the lead-contaminated soil that is being removed from the day care facilities, EBLs, and greater than 1,200 ppm properties is being stockpiled at the Missouri River Treatment Plant.  The contaminated soil is being accumulated to form a 1,000 cubic-yard pile.

Once a 1,000 cubic-yard pile is created, a composite sample is taken and analyzed for Toxic Characteristic Leaching Procedure (TCLP) lead and total lead.

At this time, the contaminated soil will be sent to the Loess Hills Regional Sanitary Landfill located in Malvern, Iowa 51551.

Discussions are on-going with the city of Omaha, Nebraska Department of Environmental Quality (NDEQ), and the EPA concerning a new disposal location at the Papillion Creek Waste Water Treatment Plant's compost facility, located in Bellevue, Nebraska.