Wells G&H Site - Olympia Property

All POLREP's for this site Wells G&H Site - Olympia Property
Woburn, MA - EPA Region I
POLREP #10
Printer Friendly  |   PDF
 
On-Scene Coordinator - Frank Gardner 2/7/2005
Time-Critical - Removal Action Pollution Report (POLREP) #10
Start Date: 3/28/2003
Pollution Report (POLREP) #10
Site Description
The Wells G & H Superfund Site covers approximately 330 acres in Woburn, Middlesex County, Massachusetts.  The Site includes the aquifer and land area located within the zone of contribution to the City of Woburn’s two municipal drinking water wells known as Wells G & H.  The Olympia Property is one of the five primary source areas of contamination within the Federal Superfund Site.

At a former drum disposal area at the Site, PCB-contaminated surface soils posed a direct contact threat and TCE-contaminated subsurface soils are acting as a continuing source of ground water contamination.  See previous polreps for additional background information.


Current Activities
The Olympia Nominee Trust (Olympia) has been identified as a potentially responsible party (PRP) as the owner of the site.  Olympia is performing the removal action under an Administrative Order on Consent (AOC) issued by EPA.  Removal activities completed by Olympia during previous reporting periods include excavation and off-site disposal of the PCB-contaminated surface soils, sampling activities to further characterize the Site, and initiation of cleanup activities relative to the TCE-contaminated subsurface soils.

During this reporting period, Olympia completed the installation of the sheet piling to isolate the in situ treatment cell area.  Olympia also installed the injection wells and the injection trenches via which the permanganate solution will be delivered to the subsurface.  Olympia is currently installing additional monitoring wells which will be used to measure the effectiveness of the treatment process.


Planned Removal Actions
Planned removal activities include (1) installing the remaining monitoring wells; (2) setting up the necessary tanks and piping for the permanganate solution; (3) operation of the in situ treatment system; and (4) monitoring to ensure compliance with cleanup standards established in the Record of Decision (ROD).

Next Steps
Weather-permitting, Olympia plans to remobilize later this month to install the remaining monitoring wells.