Wells G&H Site - Olympia Property

All POLREP's for this site Wells G&H Site - Olympia Property
Woburn, MA - EPA Region I
POLREP #18
Printer Friendly  |   PDF
 
On-Scene Coordinator - Frank Gardner 6/19/2006
Time-Critical - Removal Action Pollution Report (POLREP) #18
Start Date: 3/28/2003
Pollution Report (POLREP) #18
Site Description
The Wells G & H Superfund Site covers approximately 330 acres in Woburn, Middlesex County, Massachusetts.  The Site includes the aquifer and land area located within the zone of contribution to the City of Woburn’s two municipal drinking water wells known as Wells G & H.  The Olympia Property is one of the five primary source areas of contamination within the Federal Superfund Site.

At a former drum disposal area at the Site, PCB-contaminated surface soils posed a direct contact threat and TCE-contaminated subsurface soils are acting as a continuing source of ground water contamination.  See previous polreps for additional background information.


Current Activities
The Olympia Nominee Trust (Olympia) has been identified as a potentially responsible party (PRP) as the owner of the site.  Olympia is performing the removal action under an Administrative Order on Consent (AOC) issued by EPA.  In order to remove TCE contamination from subsurface soils at the Site, Olympia has installed and is now operating an in situ permanganate injection treatment system.  See previous polreps for prior activities conducted by Olympia.

Olympia completed the initial 8 rounds of permanganate injection in December 2005.  A total of 8,464 gallons of sodium permanganate solution has been injected to date.  Olympia conducted a comprehensive quantitative ground water monitoring survey on April 24-26, 2006.  Information gained during this survey will be used to measure the effectiveness of the in situ treatment system to date.


Planned Removal Actions
Planned removal activities include continued monitoring to ensure compliance with cleanup standards established in the Record of Decision (ROD).  Future injections will be conducted on an as-needed basis to achieve the cleanup standards.