Browning Lumber Site

All POLREP's for this site Browning Lumber Site
Bald Knob, WV - EPA Region III
POLREP #3 - Determination of a Removal Action
Printer Friendly  |   PDF
 
On-Scene Coordinator - Robert Kelly/Mike Towle 4/26/2006
Non-Time-Critical - Removal Assessment Pollution Report (POLREP) #3
Start Date: 12/1/2005
Site Description
The Browning Lumber Company operated a pressure treatment facility at the site location until 1996 and a sawmill at the site location until 1998.  Chromated Copper Arsenate was utilized during the pressure treatment processing of lumber and the company obtained an EPA ID number for hazardous waste activity in 1987; the company also received a WV/NPDES Permit for operation of the treatment facility.

Since the facility's abandonment in 1998, a fire destroyed portions of the facility.  However, during an inspection conducted by WVDEP in July, 2002, to evaluate compliance with the West Virginia Hazardous Waste Management Act, residual products from the operations conducted at the facility were observed on the site.  WVDEP observed that human trespassing was occuring at the site by evidence of dumped materials and trash.  WVDEP conducted TCLP sampling and determined that elevated TCLP values for arsenic were present in one of the pressure treatment vessels and in the soil below the vessel.  
WVDEP contacted EPA Region III and requested that they take the lead in conducting a full assessment at the site and take any necessary actions in mitigating the threats at the site.

START conducted a sampling assessment START collected a total of 11 surface water, 13 sediment, and 47 surface soil samples from the site.


Current Activities
a.  START received all of the validated analytical data by April, 2006.  START analyzed this data and corresponded with OSC Kelly concerning the hazardous levels of arsenic present at the site.
b.  Under direction of OSC Kelly, START began preparation of an ATSDR Package including an analytical summary of the validated data received from the sampling assessment conducted at the site during the week of February 14, 2006.  Upon completion and approval from OSC Kelly, the report will be provided to ATSDR and OSC Kelly will request recommendations from ATSDR for appropriate actions at the site.
c.  The OSC will make the determination of a request for a Removal Action and draft an Action Memo for the site following receipt of ATSDR's recommendations.  


Planned Removal Actions
The OSC is preparing a request for a Removal Action at the site.

Next Steps
START is preparing an ATSDR Package to request recommendations for future actions at the site.

Key Issues
Hazardous levels of arsenic are present at the site, in concentrations up to 191,000 ppm.