U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Ingersoll Removal

All POLREP's for this site Ingersoll Removal
Chicago, IL - EPA Region V
POLREP #40 - Ongoing Site Activities
Printer Friendly  |   PDF
 
On-Scene Coordinator - Tom Cook 3/18/2009
Time-Critical - Removal Action Pollution Report (POLREP) #40
Start Date: 1/18/2006
Pollution Report (POLREP) #40
Site Description
See Initial POLREP.

Current Activities
Since the last reporting period, ERRS has continued prepping and sealing activities on the PCB impacted floor of building 1014 to finish the two remaining coats of epoxy in order to seal the area. The first epoxy coat was completed on Monday, 3/16/09, and the second coat was started on the north side. The site was closed down from 3/9/09 – 3/13/09 for U.S. EPA OSC training.  Excavation of the interior of the test trench and associated oil intrusion investigation activities in building 924 have been halted to complete floor sealing activities in building 1014 and are anticipated to resume next week. Soil excavation south of building 912 has been halted until the demolition and cleanup of buildings 1012, 1013, and 1014, sealing of the building 1014 concrete floor, and excavation at of the oil infiltration area of building 924 is complete.

Planned Removal Actions
Planned removal activities include the following:

•    Surgical soil excavation for investigation of the subsurface oil intrusion source at building 924;
•    City of Chicago demolition of remaining buildings;
•    Continued surgical soil excavation in areas of concern as identified by the subsurface soil assessment, and;
•    Completion of sealing the PCB impacted floor at building 1024.


Next Steps
The following actions are anticipated to occur during the next reporting periods:

•    Reassess buildings for structural integrity;
•     Further investigation and excavation of the north central area in building 924 to determine the oil intrusion source into the basement, vaults, and pits;
•    Waste profiling to ensure proper disposal, and;
•    Completion of the sealing activities on the building 1014 concrete floor.


Key Issues
•    Documentation and photo-documentation of all EPA and city work,
•    Address contaminants of concern throughout the site based on findings from the subsurface investigation, and;
•    Tracking of excavation and disposal quantities, including soil and water.