Please refer to POLREP #1 for site description and previous actions taken.
Removal activities for this reporting period include:
The Emergency Response and Removal Services (ERRS) contractor continues site removal activities including: - Excavation and backfilling of grids 01-9a, located on the northwestern end of the Site; - Stockpiling and treatment of excavated soils; - 100% Recycling of collected metals from the former foundry; - Transportation and disposal of 90% of the construction material from the demolition of the old foundry building; - All transformers, capacitors, and chemicals securely packaged and stored on Site are awaiting profiling and disposal.
The Superfund Technical Assessment and Removal Team (START) contractor continued removal activities including: - Technical support; - Implementation of site-specific HASP; - Air and water monitoring to measure migration of contaminants of concern, off Site during the removal process; - Completion of soil sampling for RCRA metals from one residential property and a road leading to the former foundry; - Confirmatory screening and sampling of excavation activities; - and site documentation.
The planned removal actions for the next reporting period include: - Transportation and disposal of treated soil stockpiles will begin.
The next steps anticipated during the removal process include:
- Excavation and backfilling of a residential property located to the western end of the Site; - Excavation of grids 53-68, along the western end of the Site;
- There have been no media inquires during this reporting period.
|