All POLREP's for this site Smokey Mountain Smelters
Knoxville, TN - EPA Region IV
POLREP #9 - Grade Adjustment & Drainage Control Over Waste Pile
Printer Friendly  |   PDF
 
On-Scene Coordinator - David Andrews, OSC 1/13/2011
Time-Critical - Removal Action Pollution Report (POLREP) #9
Start Date: 6/8/2010
Pollution Report (POLREP) #9
Site Description
See POLREP #1 for site description and background information.




Current Activities
Grade reduction of the leading edge and western toe of the waste field continues during this reporting period.  Additional funding through a Ceiling Increase and Change of Scope Action Memorandum was approved on December 16th.  The approved funding will support the costs necessary to complete construction of diversion drainage channels through and around the site and install a clay and vegetative cap.  These measures were designed to ultimately control leachate run-off from the waste field and stabilize the conditions at the site.  After transfer of the site to the Remedial Branch the site controls will allow time to design and implement a long-term remedy for the site.

Jan 3: ERRS and EPA remobed to Site after year-end holiday demobe. Work continues with focus on grade and drainage adjustment.
Jan 5: ERRS ships off-site the tire stockpile.  During excavation and grading tires were recovered that were part of the site associated with a C&D landfill.
Jan 6: ERRS conducts a dye test with TDEC to determine subsurface water flow.
Jan 10 thru 12: Site shut-down due to snow & ice.  

START will remobilize to Site on Jan 18, 2010.


Planned Removal Actions
Continue grading and construction of diversion drainage on the south and north boundaries of the waste pile infill.  

Alternate work and tasks are planned if weather postpones heavy equipment work on Site.


Next Steps
N/A

Key Issues
None at this time

 
Disposition Of Wastes
Disposal consisted of several phases which included:
1-) Segregation of scrap iron and sheet metal from the demolition of the main building and off-site shipment for metal recycling.
2-) Disposal of the non-recoverable rubble/demolition debris.
3-) Scrap tire disposal.
4-) Fuel oil recovered from a 27,000 gallon UST unearthed during site grading.
5-) Off-site shipment of aluminum smelter waste to evaluate for possible aluminum recovery.