The Site is an abandoned facility that manufactured plastic parts for automobiles. The Site was referred to ERRB for a removal site evaluation by the State. Upon arrival, OSC Tanner discovered approximately 60 drums and totes with labels indicating hazardous wastes, caustics and solvents.
The facility is unsecure and evidence of trespassing is apparent.
|