U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Sykesville Oil Spill

All POLREP's for this site Sykesville Oil Spill
Sykesville, MD - EPA Region III
POLREP #18 - Continuation of Work
Printer Friendly  |   PDF
 
On-Scene Coordinator - Charlie Fitzsimmons 3/16/2006
Emergency - Removal Action Pollution Report (POLREP) #18
Pollution Report (POLREP) #18
Site Description
See previous POLREPS.

Current Activities
During this reporting period the Responsible Party's contractor, ERM Inc., continued weekly oil extraction activities.   The total liquids extracted thru 02/28 includes 24,319 gals of contaminated water and 3,611 gals of fuel oil.  Weekly extraction events will continue.  Recovered diesel is transferred to a new permitted AST at the Fogle's facility for disposal.  Following each extraction event, the contaminated water was passed thru a series of carbon filter units to a 500 gal holding tank.  Water was than discharged to stream as per NPDES permit.  A sample of this efluent was retrieved on 02/03/06 and tested for benzene, ethylbenzene, toluene, total xylenes, methyl tert-butyl ether and tert-butyl alcohol as per the permit.  

      
ERM and Fogle's personnel will continue to inspect and replace sorbents in the creek as part of the required work under this AOC.

On February 27, 2006 shallow water table monitoring wells were installed at MW-A02 and MW-A03 well locations.  These wells are labelled MW-A02S and MW-A03S.  the wells are approximately 40 ft. deep.  In addition ERM also completed two soil borings east of MW-A03, one soil boring west of MW-A02 and one soil boring southeast of MW-FGL-01.  The borings were completed to depths ranging from 30 to 35 ft. below grade to determine the horizontal extent of free product.  

ERM petioned MDE regarding the use of the landfarm at 1711 Dennings Rd. for acceptance of oil contaminated soils to be excavated from the second anomaly.  In letter dated Feb 06, 2006, MDE denied this request on grounds that this landfarm had initially been established without MDE approval or oversight.  In addition the AOC (sec. IX, 9.1, g.) between EPA and Fogle's does require offsite disposal of all contaminated soils to "EPA approved disposal facility."    



Planned Removal Actions
Excavation of second anomaly in the vicinity of 10K AST.  

Next Steps
Continued management of oil sorbent pads in the creek and continued removal of product from site sumps.