U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Sykesville Oil Spill

All POLREP's for this site Sykesville Oil Spill
Sykesville, MD - EPA Region III
POLREP #19 - Continuation of work
Printer Friendly  |   PDF
 
On-Scene Coordinator - Charlie Fitzsimmons 4/13/2006
Time-Critical - Removal Action Pollution Report (POLREP) #19
Pollution Report (POLREP) #19
Site Description
See previous POLREPS.

Current Activities
During this reporting period the Responsible Party's contractor, ERM Inc., continued weekly oil extraction activities.   The total liquids extracted thru 03/30 includes 25,438 gals of contaminated water and 3,629 gals of fuel oil.  Weekly extraction events will continue.  Recovered diesel is transferred to a new permitted AST at the Fogle's facility for disposal.  Following each extraction event, the contaminated water was passed thru a series of carbon filter units to a 500 gal holding tank.  Water was than discharged to stream as per NPDES permit.  A sample of this efluent was retrieved on 03/22/06 and tested for benzene, ethylbenzene, toluene, total xylenes, methyl tert-butyl ether and tert-butyl alcohol as per the site's NPDES permit.  Results revealed 3ug/l for MTBE only. The effluent was resampled on April 10 after the carbon filter units were flushed and reconfigured so as to increase the water residence time in the system.  The effluent was stored in a holding tank pending return of the analytical.
      
ERM and Fogle's personnel will continue to inspect and replace sorbents in the creek as part of the required work under this AOC.




Planned Removal Actions
Fogle's has submitted its Extent of Contamination Study Report on April 5, 2006.  After review and subsequent meeting between EPA and Fogle's/ERM, the final portion of this removal will be initiated.

Next Steps
Review and analysis of the EOC Study Report and potential acceptance of proposed identification of source of release by FOSC is forthcoming. Excavation of source and removal of contaminated soils to offsite facility will be evaluated.