1. Introduction
|
|
|
1.1 Background
|
|
|
|
|
Site Number: |
014L |
|
Contract Number: |
EP-W-08-061 |
|
D.O. Number: |
0016 |
|
Action Memo Date: |
1/20/2010 |
|
Response Authority: |
CERCLA |
|
Response Type: |
Time-Critical |
|
Response Lead: |
EPA |
|
Incident Category: |
Removal Action |
|
NPL Status: |
Non NPL |
|
Operable Unit: |
|
|
Mobilization Date: |
2/10/2010 |
|
Start Date: |
2/10/2010 |
|
Demob Date: |
|
|
Completion Date: |
|
|
CERCLIS ID: |
CTD001183052 |
|
RCRIS ID: |
|
|
ERNS No.: |
|
|
State Notification: |
2/10/2010 |
|
FPN#: |
|
|
Reimbursable Account #: |
|
1.1.1 Incident Category
Time Critical Removal Action.
1.1.2 Site Description
The Site is an abandoned, privately operated metal finishing business that went out of business in 1996, and has been abandoned since. The building has deteriorated in the intervening years; there is a hole in the roof which has allowed the basement to be filled with precipitation. Evidence of use as living quarters by local indigents was observed despite repeated efforts by local authorities to secure it by boarding up windows, installing locks, and adding police patrols. Residual plating shop contaminants and sludge in vats, tanks, and throughout the building present a hazard to the indigent residents.
The building is a one-story structure of approximately 18,000 square feet with a 1000 square foot basement on approximately 0.5 acres. In addition to metal plating process residues, It contains general debris, solid waste, and biological waste composed of food scraps and human waste from indigents’ use of the facility as living quarters. The basement is flooded with about six feet of water, obstructing assessment of hazardous materials that may be in it.
1.1.2.1 Location
The Site is located in a mixed residential and commercial area adjacent to residential properties and a new greenway/recreational path on a former rail right-of-way. The address is 400 Goodrich St, Hamden, CT 06517 or 75 Daisy St, New Haven, CT 06511; the geographic position is 41 20.08’ N, 072 56.04’ W.
1.1.2.2 Description of Threat
Residual metal plating chemicals, sludge and residues present a contact hazard to local indigents using the Site as living quarters. Concentrations of metal contaminants on Site are above the CTDEP direct contact criteria for residential and commercial exposure scenarios. Due to the use of the site building, residential exposure scenario is appropriate. Mercury and PCB containing switches and fixtures are throughout the site building. Due to their degraded condition release of their contents to the building and environment is likely; thus exposing the building squatter residents and community.
The Site building has become a haven for local indigents' use as a living quarters and drug usage despite repeated attempts to secure it by town authorities. The activities result in a threat to public health and sanitation directly to those engaging in these activities and to the neighborhood and community as a whole. Indigents' attempts to heat and cook with fires and heaters and the large amount of solid debris and waste on site pose a threat of fire which could mobilize the contaminants on site and release them to the environment.
1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
The Site contains approximately 85 metal plating vats with residual contaminants, several tanks, process piping, and fixtures containing hazardous contaminants that are in poor condition. Not including the basement, which couldn’t be inventoried; the following additional hazardous wastes and materials were identified; PCB and mercury containing light fixtures and switches and biological waste.
A total of 44 solid samples were collected inside the building from metal plating vats, tanks, the floor, walls and other components. The samples were analyzed for Resource Conservation and Recovery Act (RCRA) 8 metals, poly chlorinated biphenyls (PCB’s), asbestos, hexavalent chromium, cyanide and Toxicity Characteristic Leaching Procedure (TCLP) metals analysis. The contaminants present a risk to indigent and homeless resident trespassers because they exceed CTDEP Residential and/or Commercial/Industrial Standards; analytical results for the highest result are shown below. CTDEP Residential Remediation Standard Regulation (RSR) and CTDEP Commercial/Industrial Direct Exposure Criteria (DEC) are provided for comparison:
|
Contaminant
|
Result, parts per million (ppm)
|
CTDEP RSR, Residential,
ppm
|
CTDEP DEC, Commercial/Industrial, ppm
|
|
Antimony
|
170
|
27
|
8200
|
|
Cadmium
|
660
|
34
|
1000
|
|
Chromium (Total)
|
12,000
|
3900
|
51,000
|
|
Copper
|
180,000
|
2500
|
76,000
|
|
Lead
|
980
|
500
|
1000
|
|
Nickel
|
540,000
|
1400
|
7500
|
|
Zinc
|
190,000
|
20,000
|
610,000
|
|
Cyanide
|
40,000
|
1400
|
41,000
|
|
|
2. Current Activities
|
|
|
2.1 Operations Section
|
|
|
|
2.1.1 Narrative
Personnel conducted a site walk with 2 EPA OSC and the ERRS RM on 2/4/2010 to verify site conditions and then commenced lining up resources. On 2/10/2010 2 EPA OSC, 4 ERRS and 1 START personnel mobilized to the site and commenced set-up operations. Commenced clean up operation on 2/11/2010.
2.1.2 Response Actions to Date
2/04/2010
- A site walk was performed.
2/10/2010
- Site security was set.
- HiViz fence installed.
- Trailer delivered.
- Generators and misc. equipment on site.
- Air monitoring for particulates with DustTrak 8520 units cleared the site as below the action level of 10% of the OSHA PEL.
- ERRS started sealing building open penetrations such as windows, roof gaps, etc. in preparation for a heater unit.
- ERRS also started clearing and segegrating solid debris for internal site access.
2/11/2010 - 2/26/2010
- Completed sealing building open penetrations on 2/11/2010.
- Conducted site safety inspection and marked or removed hazards on 2/11/2010.
- Site security commenced on 2/11/2010.
- Air monitoring with DustTraks began on 2/11/2010.
- Set up Decon area on 2/15/2010.
- Air monitoring with Area Raes began 2/18/2010.
- Perimeter chainlink fence installed on 2/18/2010.
- Commenced segregation, consoldation and disposal of solid debris and hazardous materials on 2/11/2010.
- Started collection and consolidation of hazardous material from vat scrapings and floor sweeping, etc. Approximately 1 - 55 gallon drum to date.
- Began cutting vats and other metal debris for volume reduction.
- Heating operations began 2/19/2010. Basement water completely thawed on 2/22/2010. All vats thawed on 2/24/2010.
- Collected water samples from basement and shipped to lab for analysis on 2/24/2010.
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
The PRP's estate has been identified and provided access consent.
2.1.4 Progress Metrics
| Waste Stream |
Medium |
Quantity |
Manifest # |
Treatment |
Disposal |
| Non-Haz |
Solid |
90-yds |
N/A |
N/A |
Pine Ave Landfill
Niagra, NY |
| Scrap Metal |
Solid |
20-yds |
N/A |
N/A |
Sims Metal Mgmt. |
| |
|
|
|
|
|
|
|
|
2.2 Planning Section
|
|
|
|
2.2.1 Anticipated Activities
2.2.1.1 Planned Response Activities
Remove hazardous material debris and other superficial contamination from building.
Remove visible chemical residues present on vats and other process equipment and remove all vats and tanks.
Thaw, pump out and remove potentially comtaminated liquids.
Segregate and remove, recycle or stage solid waste obstructions, debris, scrap and tumbler components.
Perform air monitoring to ensure worker and public safety.
2.2.1.2 Next Steps
Obtain electric line power.
Continue segregating wastes and staging for removal.
Assess site T&D needs.
Continue monitoring site for safety hazards.
2.2.2 Issues
Large amount of interferring solid waste and debris.
Line electric power.
Disposal of liquid wastes to the New Haven Water Control Authority treatment plant.
Recyclable material disposal.
Temporary roof repair not feasible. Assessing other means to remediate basement water infiltration.
Time required to cut vats. Procuring more efficient equipment for the job.
|
|
|
2.3 Logistics Section
|
|
|
|
No Issues
|
|
|
2.4 Finance Section
|
|
|
|
2.4.1 Narrative
An intial TO of $250,000 has been issued. Received 1900-55s through week ending 2/19/2010.
|
|
|
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
| ERRS - Cleanup Contractor |
$573,412.00 |
$51,875.00 |
$521,537.00 |
90.95% |
| TAT/START |
$76,154.00 |
$0.00 |
$76,154.00 |
100.00% |
|
Intramural Costs
|
| USEPA - Direct |
$59,344.00 |
$20,000.00 |
$39,344.00 |
66.30% |
| USEPA - InDirect |
$395,677.00 |
$0.00 |
$395,677.00 |
100.00% |
| |
| Total Site Costs |
$1,104,587.00 |
$71,875.00 |
$1,032,712.00 |
93.49% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
|
|
|
2.5 Other Command Staff
|
|
|
|
2.5.1 Safety Officer The site contains many physical hazards including slips, trips and falls (SLT). The SLT hazards are also present outside of the building due to recent winter weather. These hazards are being mitigated with engineering controls, including clearing of walkways & work areas of equipment & debris and marking, idenitifying or barricading other obstructions. Cold stress is also a potential hazard. Monitoring will be conducted for cold stress and proper work/rest schedules will be maintained. In addition, site security is being addressed by controlling unauthorized access to the site and work zones using fencing, caution tape and overnight site security. Interior and exterior air monitoring is being performed during site activities.
2.6 Liaison Officer Liaison with the Hamden Director of Economic and Community Development Director, CTDEP and CTDPH has been undertaken and is ongoing.
2.7 Information Officer
2.7.1 Public Information Officer
No action.
2.7.2 Community Involvement Coordinator
Outreach was performed with the resident immediately abutting the site.
|
|
3. Participating Entities
|
|
|
3.1 Unified Command Unified command isn't being used for this site, but there is a high degree of liaison with cooperating agencies.
3.2 Cooperating Agencies Hamden City Economic and Community Development Department
CTDPH
CTDEP
Quinnipiack Health District
|
|
4. Personnel On Site
|
|
|
EPA OSC - 2
START - 1
ERRS, ER, LLC - 3
ERRS, Moran (Team sub) - 3
|
|
5. Definition of Terms
|
|
|
No information available at this time.
|
|
6. Additional sources of information
|
|
|
No information available at this time.
|
|
7. Situational Reference Materials
|
|
|
No information available at this time.
|
|
POLREP #2 Last Updated 2/25/2010
|
|
|