1. Introduction
|
|
1.1 Background
|
|
|
Site Number: |
|
|
Contract Number: |
|
D.O. Number: |
|
|
Action Memo Date: |
|
Response Authority: |
|
|
Response Type: |
Emergency |
Response Lead: |
|
|
Incident Category: |
|
NPL Status: |
Non NPL |
|
Operable Unit: |
|
Mobilization Date: |
2/15/2010 |
|
Start Date: |
2/15/2010 |
Demob Date: |
4/1/2010 |
|
Completion Date: |
|
CERCLIS ID: |
|
|
RCRIS ID: |
|
ERNS No.: |
|
|
State Notification: |
|
FPN#: |
|
|
Reimbursable Account #: |
|
1.1.1 Incident Category
Earthquake disaster.
1.1.2 Site Description
Site conditions remain as previously reported.
1.1.2.1 Location
Republic of Haiti, all areas.
1.1.2.2 Description of Threat
N/A
1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
|
2. Current Activities
|
|
2.1 Operations Section
|
|
|
2.1.1 Narrative
On February 1, 2010 EPA received a request for assistance from the Department of Defense Southern Command (SOUTHCOM) for EPA assistance in a Haiti recovery effort. They specifically wanted the Agency to participate in a Joint Task Force (JTF) to develop an assessment of public health and environmental needs for Haiti, for both short and long term goals. The JTF was comprised of other federal partners such as DOE, DOT/CG, ACOE, USAID and EPA. EPA Region 2 had deployed a second team of two OSCs for a 30-day tour to support this effort. Having completed all assignments, the EPA was demobed on 3/31/2010.
2.1.2 Response Actions to Date
As of this date, the involvement of ERRD personnel from Regions I, II & VI in the Haiti Response mission is terminated. Having completed all assignments given to EPA as part of the multi-agency Tiger Team, the two EPA OSCs have departed Haiti and are enroute back to the mainland.
Region II has received and disseminated copies of the Rapid Environmental Impact Assessment report, prepared for the USAID. The report provides findings and recommendations in areas such as Waste Disposal, Disease Vector Control, Debris Management, Food Security, Hazardous Waste, etc.
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
n/a
2.1.4 Progress Metrics
Waste Stream |
Medium |
Quantity |
Manifest # |
Treatment |
Disposal |
N/A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2.2 Planning Section
|
|
|
2.2.1 Anticipated Activities
None at this time.
2.2.1.1 Planned Response Activities
None at this time
2.2.1.2 Next Steps
Region II will compile an after-action summary report of it's activities in connection with the Haiti Earthquake response. This summary will be provided to EPA Headquarters.
2.2.2 Issues
None at this time.
|
|
2.3 Logistics Section
|
|
|
2.3 Logistics Section
N/A
|
|
2.4 Finance Section
|
|
|
No information available at this time.
|
|
2.5 Other Command Staff
|
|
|
2.5.1 Safety Officer Region II personnel returning from Haiti will continue to take doxycycline in accordance with approved medical protocol and the HASP.
2.6 Liaison Officer The Region II Planning Section Chief position has been demobed.
2.7 Information Officer 2.7.1 Public Information Officer
N/A
2.7.2 Community Involvement Coordinator
N/A
|
3. Participating Entities
|
|
3.1 Unified Command N/A
3.2 Cooperating Agencies EPA will continue to provide assistance to other federal agencies (DOD, ACOE, FEMA, USCG, etc.) as requested.
|
4. Personnel On Site
|
|
EPA OSCs Jeff Bechtel and Mike Brescio departed Haiti on 3/31/2010. There are no other EPA personnel on Haiti.
|
5. Definition of Terms
|
|
N/A
|
6. Additional sources of information
|
|
6.1 Internet location of additional information/report http://www.epaosc.org. Click on" Web Sites", then "Region II". Scroll down to "Haiti Response" and click on that link.
6.2 Reporting Schedule This is the Final POLREP..
|
7. Situational Reference Materials
|
|
Situational updates provided by DHS are posted on the www.epa.osc website.
|