Indianapolis, IN - EPA Region V
POLREP #14
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
ESI - Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region V

Subject: POLREP #14
ESI
B5YS
Indianapolis, IN
Latitude: 39.9128600 Longitude: -86.2423680


To: Harry Atkinson, IDEM
Ken McDaniel, IDEM
Ryan Groves, IDEM
George Richotte, IDEM
Natalie Maupin, IDEM
Jason Doerflein, Marion County Health Department
Richard Wise, City of Indianapolis
Tom White, City of Indianapolis
Sue Michael, City of Indianapolis
Kim Cussen, United Water
Stephen Jones, Pike Fire Department
Randy Braun, IDEM
Kristen Heitman, Providence Wildlife

From: Anita L. Boseman and Verneta Simon, On-Scene Coordinators
Date: 3/11/2011
Reporting Period: 3/3/2011 - 3/11/2011

1. Introduction
  1.1 Background
   
Site Number: B5YS    Contract Number: EP-S5-09-05
D.O. Number: 47    Action Memo Date: 9/30/2010
Response Authority: CERCLA    Response Type: Time-Critical
Response Lead: EPA    Incident Category: Removal Action
NPL Status: Non NPL    Operable Unit:
Mobilization Date: 10/8/2010    Start Date: 10/8/2010
Demob Date:      Completion Date:  
CERCLIS ID: INN0051050501    RCRIS ID:
ERNS No.:    State Notification:
FPN#:    Reimbursable Account #:


1.1.1 Incident Category

Bankrupt Commercial Used Oils Facility

1.1.2 Site Description

See POLREP 1

1.1.2.1 Location

4910 West 86th Street, Indianapolis, Indiana 46268

2. Current Activities
  2.1 Operations Section
    2. Current Activities

2.1.1 Narrative

See POLREP 1

2.1.2 Response Actions to Date

From March 3 until March 11, 2011

 

  • On March 3, 2011, ERRS discharged 67,311 gal of stormwater from the southwest area to the City of Indianapolis sanitary system, for a total of 240,175.8 gal of the allotted 1 million gal in the modified SDA issued on February 15, 2011.  Discharge event information was reported to the City.
  • On March 3, 2011, ERRS placed absorbent boom in two areas of the stormwater drainage ditch on the southeast corner of the northeast area of the site, in the event of a perimeter curb stormwater breach due to heavy precipitation. 
  • On March 5, 2011, ERRS hauled out 16 loads (96,000 gal) of oily water from the east million gallon bunker tank for disposal at United Water in Cincinnati, OH.
  • On March 8, 2011, ERRS hauled out 10 loads (48,000 gal) of oily water from the east million gallon bunker tank for disposal at United Water in Cincinnati, OH.
  • On March 8, 2011, ERRS discharged 35,830 gal of stormwater from the southwest area to the City of Indianapolis sanitary system, for a total of 276,005.8 gal of the allotted 1 million gal in the modified SDA issued on February 15, 2011.  Discharge event information was reported to the City.
  • On March 9, 2011, ERRS hauled out 3 loads (18,000 gal) of oily water from the east million gallon bunker tank for disposal at United Water in Cincinnati, OH. 
  • On March 9, 2011, Todd Hassold of Environmental Services was on site regarding remediation of Tank 51.

2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)

A draft Administrative Settlement Agreement on Consent (ASAOC) is currently being negotiated with PRPs.

2.1.4 Progress Metrics

<>

<>

Waste Stream Quantity Treatment Disposal
Hydrogen Peroxide
900 gal
 -- EQ Detroit, Inc.
Sodium Hydrosulfide
300 gal
Re-use EQ Detroit, Inc.
Sodium Hydroxide
5,150 gal
United Wastewater
for Re-use
 --
Oily Water
837,998 gal United Wastewater
for Re-use
 --
Subsurface Soil
6.90 tons  -- Southside Landfill
Stormwater
479,996.1 gal City of Indianapolis
Sanitary Sewer
--
Labpack Materials  NA  -- PSC Environmental
Services 
PPE
0.61 tons  -- Southside Landfill



  2.2 Planning Section
    2.2.1 Anticipated Activities

2.2.1.1 Planned Response Activities

None.

2.2.1.2 Next Steps 

U.S.EPA, START, and ERRS will be on site periodically to continue managing the stormwater in the northeast and southwest areas.

2.2.2 Issues

The utility billing issue has not been resolved.



  2.3 Logistics Section
    Not applicable.

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    2.5.1 Safety Officer
A site safety plan was signed by all present.

2.6 Liaison Officer
Not applicable.

2.7 Information Officer

2.7.1 Public Information Officer

Not applicable.

2 Community Involvement Coordinator

The next community meeting has been scheduled for March 14, 2011. 

3. Participating Entities
  3.1 Unified Command
Indiana Department of Environmental Management
Indianapolis Department of Public Works
Pike Township Fire Department
City of Indianapolis

3.2 Cooperating Agencies
Marion County Health Department

4. Personnel On Site
  N/A

5. Definition of Terms
 

ERRS – Emergency and Rapid Response Services

IDEM – Indiana Department of Environmental Management

OSC – On-Scene Coordinator

RCRA – Resource Conservation and Recovery Act

START – Superfund Technical Assessment and Response Team

U.S. EPA – United States Environmental Protection Agency
POLREP – Pollution Report



6. Additional sources of information
  6.1 Internet location of additional information/report

For additional information, please refer to “Documents” on www.epaosc.org.



6.2 Reporting Schedule
The next POLREP will be submitted at a date to be determined.

7. Situational Reference Materials
 

For additional information, please refer to “Documents” on www.epaosc.org.




Click here to view Attached Images