Kinder Morgan Pipeline

All POL/SITREP's for this site Kinder Morgan Pipeline
Tampa, FL - EPA Region IV
POLREP #3
Final POLREP
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Kinder Morgan Pipeline - Removal Polrep
Final Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region IV

Subject: POLREP #3
Final POLREP
Kinder Morgan Pipeline

Tampa, FL
Latitude: 27.9739740 Longitude: -82.3205680


To:
From: Chris Russell, OSC
Date: 8/4/2011
Reporting Period: 7/31/11 - 8/3/11

1. Introduction
  1.1 Background
   
Site Number: Z4UF    Contract Number:  
D.O. Number:      Action Memo Date:  
Response Authority: OPA    Response Type: Emergency
Response Lead: PRP    Incident Category: Removal Action
NPL Status: Non NPL    Operable Unit:
Mobilization Date: 7/23/2011    Start Date: 7/23/2011
Demob Date: 8/3/2011    Completion Date: 8/3/2011
CERCLIS ID:    RCRIS ID:
ERNS No.:    State Notification:
FPN#: E11422    Reimbursable Account #: HR04R0XUF302D91C

1.1.1 Incident Category - Emergency Response

1.1.2 Site Description -Pipeline spill of jet fuel impacting navigable waters of the United States.   

1.1.2.1 Location - Near East Broadway Avenue and Williams Road intersection in Tampa, Hillsborough County, Florida.

1.1.2.2 Description of Threat - Kinder Morgan (Central Florida Pipeline) reported a release of refined petroleum from its pipeline at approximately 1945 hours on Friday, July 22, 2011.  The 10-inch pipeline serves the Orlando Airport and was carrying jet fuel at time of release.  The location of the pipeline's release was under a canal which flows into a nearby creek.  The creek then flows into the Tampa Bypass Canal which drains into the McKay Bay.  Residential and commercial properties are located within the vicinity of the spill location and along the bank of the creek.  Complaints of smelling fuel were ongoing.

1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results -
Phone Duty Officer Gary Andrew deployed OSC Chris Russell to the site.  Upon arrival, OSC Chris Russell met with state and local agencies and the potentially responsible party.  At the site, product could be seen flowing upwards from the pipe and into the creek.  The release was unsecured and ongoing.

Unified command was established with USEPA, FDEP, FDEM, Hillsborough County Environmental Protection Commission, Hillsborough County Fire Rescue, and Central Florida Pipeline.  Central Florida Pipeline hired contractors to address the mitigation efforts and to stop the release.  OSC Russell requested START and three additional OSCs to respond to the scene.

2. Current Activities
  2.1 Operations Section
    2.1.2 Response Actions to Date - For activity that occurred previously, please review prior POLREPs.  Detailed IAPs can also be found along with other documents on EPAOSC.org

During this reporting period, response and recovery actions continued.  Vegetation was removed from the ditches and the lake at the spill site to allow for the migration of free product.  Furthermore, flushing and vacuuming operations continued.

On August 2, 2011, EPA and START field personnel completed the transitioning operations needed to transfer the lead of the response from the US EPA to the Florida Department of Environmental Protection.  Furthermore, during the afternoon, the lead for this response was formally transitioned over to the FDEP SOSC.  The RP, Hillsborough County, and FDEP, remain in a Unified Command.  Operations have shifted from a response phase into a recovery phase.  FDEP and Hillsborough County Environmental Protection Commission staff will provide the oversight for the recovery phase.
  
Air monitoring by the RP, is ongoing to ensure the safety of response personnel and the community.

A Wetlands and Wildlife Group conducts regular bird hazing, collection and identification of affected animals, and conducts assessments of impacted wetland areas.

A Waste Disposal Group focuses on off loading the frac tanks to tanker trucks for transport to the FCC Plant City Treatment facility, as well as haul the solid waste to appropriate landfills in accordance with the Waste Management Plan.  To date, over 300,000 gallons of liquids have been manifested to the treatment site.


2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)

Central Florida Pipeline is the RP.

2.1.4 Progress Metrics

Waste Stream Medium Quantity Manifest # Treatment Disposal
 PCW      water  300,000 gallons    X  
           
           



  2.2 Planning Section
   

2.2.1 Anticipated Activities - response crews will continue to flush the canal with water, remove obstructive vegetation and debris to allow better flow, and recover the oil, as well as incorporate recovery actions as overseen by the FDEP and HCEPC.

2.2.1.1 Planned Response Activities

2.2.1.2 Next Steps - Recovery and remediation activities will be incorporated with oversight provided at the State and Local level.

2.2.2 Issues -


  2.3 Logistics Section
    No information available at this time.

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    2.5.1 Safety Officer
The HASP can be found in the IAP's listed on the website.

2.6 Liaison Officer


2.7 Information Officer


2.7.1 Public Information Officer

2.7.2 Community Involvement Coordinator


3. Participating Entities
  3.1 Unified Command
Unified Command consisted of a representative of the RP, EPA, FDEP, and Hillsborough County.  Upon transition of the lead from EPA to FDEP, the UC consists of the RP, FDEP, and Hillsborough County.

3.2 Cooperating Agencies
USFWS, FWCC, FDOH, USDOT, FDEM

4. Personnel On Site
  OSC Jardine demobed on 7/31/2011. OSC Garrard demobed on 8/2/2011.  OSC Russell demobed on 8/3/2011.

5. Definition of Terms
  No information available at this time.

6. Additional sources of information
  No information available at this time.

7. Situational Reference Materials
  No information available at this time.


Click here to view Attached Images