U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

ESI-PRP Removal

All POL/SITREP's for this site ESI-PRP Removal
Indianapolis, IN - EPA Region V
POLREP #18
Progress
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
ESI-PRP Removal - Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region V

Subject: POLREP #18
Progress
ESI-PRP Removal
B5YS
Indianapolis, IN
Latitude: 39.9128600 Longitude: -86.2423680


To: Sue Michael, City of Indianapolis
Tom White, Citizens Energy Group
Harry Atkinson, IDEM
Ryan Groves, IDEM
Megan Nagle, IDEM
George Ritchotte, IDEM
Jason Doerflein, Marion County Health Department
Sam Bruner, Pike Fire Department
John Maritote, U.S. EPA Region V
Janet Pope, U.S. EPA Region V
Kim Cussen, United Water
Stan Rigney, IDEM
Randy Braun, IDEM
Maupin Natalie, IDEM
Eric Kaufman, Marion County Health Department
Jason Ravenscroft, Marion County Health Department
Dan Sparks, USFWS
Ed Karecki, USFWS
Bob Masbaum, Citizens Energy Group
Kristen Heitman, Providence Wildlife
Michael Massonne, City of Indianapolis
Cheryl Carlson, Citizens Energy Group
Emily Mack, City of Indianapolis
Thomas Marks, U.S. EPA
Rex Osborn, IDEM
Gabriele Hauer, IDEM
Max Michael, IDEM
Deirdre Wyatt, IDEM
Jennifer Schick, City of Indianapolis

From: Verneta Simon & Anita L. Boseman, On-Scene Coordinators
Date: 8/31/2011
Reporting Period: 8/22/2011 - 8/26/2011

1. Introduction
  1.1 Background
   
Site Number: B5YS    Contract Number:  
D.O. Number:      Action Memo Date: 9/30/2010
Response Authority: CERCLA    Response Type: PRP Oversight
Response Lead: PRP    Incident Category: Removal Action
NPL Status: Non NPL    Operable Unit:
Mobilization Date: 4/6/2011    Start Date: 4/6/2011
Demob Date:      Completion Date:  
CERCLIS ID: INN0051050501    RCRIS ID:
ERNS No.:    State Notification:
FPN#:    Reimbursable Account #:

1.1.1 Incident Category
Bankrupt Commercial Used Oils Facility

1.1.2 Site Description
See POLREP 1

1.1.2.1 Location
4910 West 86th Street, Indianapolis, Indiana 46268



2. Current Activities
  2.1 Operations Section
   

2.1.1 Narrative
See POLREP 1

2.1.2 Response Actions to Date


On August 22, 2011, Midwest hauled off 5 loads (30,000 gal) of oily water from the control structure to United Waste Water Inc.'s facility in Cincinnati, OH and 2 loads (9,800 gal) of oily water from the control structure to Clean Water Limited's Cherokee Drive Facility in Dayton, OH.

  • 0.25” of rain fell over the weekend.  TriHydro reported that the rain did not overtop the storm sewers or escape the Site.
  • Midwest continued powerwashing the interior of Tanks 12 and 13.  The sludge was moved to vac boxes and the solidification pits. 
  • Midwest continued solidifying material in the solidification pits with wood pulp.
On August 23, 2011, Midwest hauled off 3 loads (18,000 gal) of oily water from the control structure to United Waste Water Inc.'s facility in Cincinnati, OH and 2 loads (9,200 gal) of oily water from the control structure to Clean Water Limited's Cherokee Drive Facility in Dayton, OH.
  • Midwest hauled off (6) 20 yd3 roll off boxes of solidified sludge to Southside Landfill in Indianapolis, IN.  One of the boxes contained sludge previously solidified with fly ash. 
  • Midwest continued solidifying material in the solidification pits with wood pulp.
  • Midwest completed final cleaning of Tanks 12, 13, 14, and 15.
  • Midwest started removing sludge from Tanks 41 and 42 in the East Containment.
  • TriHydro requested visual inspection of Tanks 12, 13, 14, and 15.  There was no visible free product on the floor or walls of any of the tanks.  The condition was documented with two photos of each tank
On August 24, 2011, Midwest hauled off 4 loads (24,000 gal) of oily water from the control structure  to United Waste Water Inc.'s facility in Cincinnati, OH
.

  • 0.15” of rain fell at the Site.  The storm water did not pool above manholes or escape the Site
  • Midwest hauled off (11) 20 yd3 roll off boxes of solidified sludge to Southside Landfill in Indianapolis, IN.
  • Midwest continued solidifying sludge in the solidification pits with wood pulp.
  • Midwest continued removing sludge from Tanks 41 and 42 in the East Containment and begun removing sludge from Tanks 45 and 46.
  • TriHydro changed out a carbon filter on the GAC unit.
  • TriHydro started discharging treated water to Oily Creek at a rate of 50 gpm.  4,670 gallons were discharged.
  • TriHydro collected a post treatment water sample.
On August 25, 2011, Midwest hauled off 3 loads (18,000 gal) of oily water from the control structure and primary separator pit to United Waste Water Inc.'s facility in Cincinnati, OH.
  • 0.25” of rain fell at the Site.  The storm water pooled above a manhole in the southwest area in the morning, but subsided.  There was no pooling above manholes in the northeast area.. 
  • Midwest hauled off (3) 20 yd3 roll off boxes of solidified sludge to Southside Landfill in Indianapolis, IN.
  • Midwest continued solidifying material in the solidification pits with wood pulp.
  • Midwest continued removing sludge and power washing the interiors of Tanks 41, 42, 43, and 44 in the East Containment.
  • TriHydro continued discharging treated water to Oily Creek at a rate of 50 gpm.  17,065 gallons were discharged
On August 26, 2011, Midwest hauled off 1 load (6,000 gal) of oily water from the control structure to United Waste Water Inc.'s facility in Cincinnati, OH.  
  • Midwest hauled off (5) 20 yd3 roll off boxes of solidified sludge to Southside Landfill in Indianapolis, IN.
  • Midwest hauled off one semi trailer load of partially full drums and totes to EEI in Cincinnati, OH.
  • Midwest continued solidifying material in the solidification pits with wood pulp.
  • Midwest continued removing sludge and cleaning the interior of Tank 45.
  • Midwest completed final cleaning of Tanks 41, 42, and 46 in the East Containment.
  • TriHydro requested visual inspection of Tanks 41, 42, and 46.  There was no visible product in any of the tanks.  The condition was documented with two photos of each tank.
  • EPA OSC Verneta Simon visited the Site for a site walk
A map of the Site produced by TriHydro shows their cleanup progress by tank.  It is available in the documents section.

The wood pulp solidification material is a reclaimed/recycled product.  As of 8/26/11, approximately 500,000 pounds had been used to solidify waste sludge.

2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
N/A

 

2.1.4 Progress Metrics

 

Waste Stream  Medium  Quantity  Manifest #  Treatment  Disposal 
Oily Water Liquid 3,109,734 gallons   X  
Stormwater Liquid 424,956 gallons   X  
Tank 51 Containment  Liquid 335,120 gallons   X  
Totes and Drums Liquid 3,885 gallons            X  
Solidified sludge
Solid 500 yd3     X
 



  2.2 Planning Section
    2.2.1 Anticipated Activities
  • Pilot test for bunker tank removal activities.
2.2.1.1 Planned Response Activities
None

2.2.1.2 Next Steps
US EPA will provide oversight of PRP Group removal activities.

Use decontaminated Tank 6 for treated storm water storage.

2.2.2 Issues
Starting in Mid-July, the weather became very hot and humid, and special care was taken to make sure that people working outside are well hydrated and taking adequate breaks

Groundwater infiltration is suspected in the sanitary sewer system on Site. TriHydro is investigating potential options for mitigating infiltration. 

Standing water has been observed in several locations around the site. Warmer weather can lead to mosquito breeding in standing water. EPA has requested that Trihydro address all standing water on site as soon as possible.

Ongoing management of wildlife at the site due to nearby ecosystems.

In previous POLREPs an incorrect name was used when referring to the oily water disposal facility. The correct name should be United Waste Water, Inc. not United Water.

"Control structure" refers to the pit or sump attached to and immediately south of the million gallon bunker tanks.  It has been referred to as "access pit" and "access pit/control structure" in the past.



  2.3 Logistics Section
    Not applicable.

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    2.5.1 Safety Officer
Not applicable.

2.6 Liaison Officer
Not applicable.

2.7 Information Officer
2.7.1 Public Information Officer

2.7.2 Community Involvement Coordinator
A date has not been selected for the next community meeting.


3. Participating Entities
  3.1 Unified Command
Indiana Department of Environmental Management
Indianapolis Department of Public Works
Pike Township Fire Department
City of Indianapolis

3.2 Cooperating Agencies
Marion County Health Department

4. Personnel On Site
  U.S. EPA
START Contractor


5. Definition of Terms
 

ASAOC – Administrative Settlement Agreement on Consent
ERRS – Emergency and Rapid Response Services

IDEM – Indiana Department of Environmental Management

OSC – On-Scene Coordinator

POLREP – Pollution Report
PRP - Potentially Responsible Party
RCRA – Resource Conservation and Recovery Act

START – Superfund Technical Assessment and Response Team

U.S. EPA – United States Environmental Protection Agency



6. Additional sources of information
  6.1 Internet location of additional information/report
For additional information, please refer to the US EPA lead removal action website at www.epaosc.org/esi


6.2 Reporting Schedule
The next POLREP will be submitted at a date to be determined.

7. Situational Reference Materials
  For additional information, please refer to the documents section at www.epaosc.org/esi