U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
New Lyme Metals - Removal Polrep

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region V
|
|
Subject:
|
POLREP #13
Continuation of Removal Action
New Lyme Metals
B5VC
New Lyme, OH
Latitude: 41.6050900 Longitude: -80.7646600
|
|
To:
|
Jason El-Zein, U.S. EPA
Gary Steinbauer, U.S. EPA
Michelle Colledge, ATSDR
Kurt Kollar, Ohio EPA
Mike Gruskiewicz, New Lyme Township
Kevin Clouse, OEPA
Scott Shane, Ohio EPA
Duty Officer, NRC
Mark Johnson, ATSDR
Carolyn Bohlen, U.S. EPA
Sam Borries, U.S. EPA
Yolanda Bouchee-Cureton, U.S. EPA
Mindy Clements, U.S. EPA
HQ EOC, U.S. EPA
Brian Schlieger, U.S. EPA
USCG PolRep Distribution, USCG
|
|
From:
|
JJ Justice, On-Scene Coordinator
|
|
Date:
|
9/16/2011
|
|
Reporting Period:
|
September 7, 2011 to September 16, 2011
|
|
1. Introduction
|
|
|
1.1 Background
|
|
|
|
|
Site Number: |
B5VC |
|
Contract Number: |
EP-S5-09-05 |
|
D.O. Number: |
0027 |
|
Action Memo Date: |
5/20/2010 |
|
Response Authority: |
CERCLA |
|
Response Type: |
Time-Critical |
|
Response Lead: |
EPA |
|
Incident Category: |
Removal Action |
|
NPL Status: |
Non NPL |
|
Operable Unit: |
|
|
Mobilization Date: |
12/9/2009 |
|
Start Date: |
7/12/2010 |
|
Demob Date: |
|
|
Completion Date: |
|
|
CERCLIS ID: |
OHN000510416 |
|
RCRIS ID: |
|
|
ERNS No.: |
|
|
State Notification: |
|
|
FPN#: |
|
|
Reimbursable Account #: |
|
1.1.1 Incident Category
CERCLA Incident Category: Inactive Recycling Facility
1.1.2 Site Description
1.1.2.1 Location
See Initial Polrep.
1.1.2.2 Description of Threat
The presence of heavy metals, PCBs, asbestos and numerous drums and compressed gas cylinders presents potential threats to human health and the environment by exposures to impacted air, soil and water at and around the Site.
See Initial Polrep for additional information.
1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
Primary contaminants of concern identified during the Site Assessment included: heavy metals (antimony, arsenic, cadmium, lead, mercury), asbestos (chrysotile) and PCBs (Aroclor 1242 and 1254).
See Initial Polrep for additional information.
|
|
2. Current Activities
|
|
|
2.1 Operations Section
|
|
|
|
2.1.1 Narrative
The Time-Critical Removal Action at the New Lyme Metals Site is addressing the presence of heavy metals and PCBs in the soils by excavating and disposing of the impacted material off site. All asbestos containing materials, drums and compressed gas cylinders will also be removed and disposed of at an off site facility. Air monitoring and sampling is being conducted for the protection of the workers and the public. In addition, well samples have been collected to determine if any of the contaminants on Site have impacted the ground water.
2.1.2 Response Actions to Date
During the period of September 7, 2011 to September 16, 2011, U.S.EPA along with START and ERRS contractors continued removal activities at the Site, these activities included:
- Excavated non-hazardous soils from 40 grids (E'-4, E'-5, E'-6, E'-7, D'-4, D'-5, C'-2, C'-3 C'-4, C'-5, B'-3, B'-4, B'-5, A'-3, A'-4, A'-5, A-3, A-4, A-5, B-3, B-4, B-5, C-3, C-4, C-5, D-3, D-4, D-5, E-3, E-4, E-5, F-3, F-4, F-5, G-3, G-4, G-5, H-3, H-4, H-5)
- Transported 91 loads of non-hazardous soils to American Landfill for disposal
- Transported 16 drums of oily water and 1 drum of chromic acid to EQ for disposal
- Transported 2 compressed gas cylinders to Airgas for reclamation
- Transported 2 compressed gas cylinders to Butler Gas Company for reclamation
- Transported 40 cubic yards of scrap iron and metal to Ashtabula Iron and Metal for recycling
- Continued dewatering excavation areas and pumped storm run-off to an on Site frac-tank for treatment
- Discharged 52,000 gallons of treated contact storm run-off
- Continued dust suppression efforts in load out and excavation areas
- Continued site survey with Ludlum Model 192 gamma radiation detector
- Continued air monitoring for dust and sampling asbestos at site perimeter
- Collected 14 investigatory samples from the creek and swale along the southern edge of the Site
- Collected 75 confirmatory samples from excavated areas
- Confirmation sample results indicate the A-7, D-6, D-7, E-9, F-7 and I-8 need to be re-excavated
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
U.S. EPA continues its efforts in identifying viable potentially responsible parties as well as identifying and locating additional locations where the operations took place. Currently, U.S. EPA has identified two possible locations where activities, similar to those at New Lyme Metals, may have taken place.
2.1.4 Progress Metrics
This Reporting Period:
| Waste Stream |
Quantity (tons) |
Date |
Manifest # |
Destination |
| Non-Hazardous Soil |
227.59 |
9/7/2011 |
646224-646233 |
American Landfill, 7916 Chapel St., Waynesburg, OH 44688 |
| Non-Hazardous Soil |
161.7 |
9/8/2011 |
646234-646241 |
American Landfill, 7916 Chapel St., Waynesburg, OH 44688 |
| Non-Hazardous Soil |
170.78 |
9/9/2011 |
646242-646249 |
American Landfill, 7916 Chapel St., Waynesburg, OH 44689 |
| Non-Hazardous Soil |
455.45 |
9/12/2011 |
646250-646268 |
American Landfill, 7916 Chapel St., Waynesburg, OH 44688 |
| Compressed Gas Cylinders |
2 cylinders |
9/13/2011 |
|
Airgas, 2020 Train Avenue, Cleveland, OH 44113 |
| Non-Hazardous Soil |
343.09 |
9/13/2011 |
646269-646284 |
American Landfill, 7916 Chapel St., Waynesburg, OH 44688 |
| Oily/water mixture |
16 - 55 gallon drums |
9/14/2011 |
|
EQ Ohio, 2050 Central Avenue SE, Canton, OH 44707 |
| Chromic Acid |
1 - 35 gallon drum |
9/14/2011 |
|
EQ Ohio, 2050 Central Avenue SE, Canton, OH 44707 |
| Non-Hazardous Soil |
396.99 |
9/14/2011 |
646285-646287 & 22977-22989 |
American Landfill, 7916 Chapel St., Waynesburg, OH 44689 |
| Non-Hazardous Soil |
252.46 |
9/15/2011 |
22958-22966 & 22974-22976 |
American Landfill, 7916 Chapel St., Waynesburg, OH 44689 |
| Compressed Gas Cylinders |
2 cylinders |
9/15/2011 |
|
Butler Gas Company, 110 Nichol Avenue, McKees Rocks, PA 15136 |
| Scrap Metal |
40 Cubic Yards |
9/16/2011 |
|
Ashtabula Iron & Metal, 1015 W 30th St., Ashtabula, OH 44004 |
To Date:
526.72 tons of Non-Hazardous Debris has been disposed of at American Landfill in Waynesburg, Ohio
4,419.84 tons of Non-Hazardous Soils has been disposed of at American Landfill in Waynesburg, Ohio
32.62 tons of Non-Friable Asbestos containing material has been disposed of at Americn Landfill, in Waynesburg, Ohio
1,800.03 tons of RQ, Polychlorinated Biphenyls, Solid Mixture, UN3432 material has been disposed of at CWM Chemical Services in Model City, New York
16 55-gallon drums of Oily Water Mixture disposed of at EQ Ohio in Canton, Ohio
1 35-gallon drum of Chromic Acid disposed of at EQ Ohio in Canton, Ohio
2 Compressed Gas Cylinders reclaimed by Air Products in Cleveland, Ohio
2 Compressed Gas Cylinder reclaimed by Butler Gas Products in McKees Rocks, Pennsylvania
110,000 gallons of contact storm water run-off has been treated for PCBs and heavy metals and discharged
39.43 tons of scrap/used tires recycled at Liberty Tire Recycling in Minerva, Ohio
40 cubic yards of scrap iron and metal recycled at Ashtabula Iron & Metal in Ashtabula, Ohio
|
|
|
2.2 Planning Section
|
|
|
|
2.2.1 Anticipated Activities
2.2.1.1 Planned Response Activities
Removal action will include the following:
- Removal of non-hazardous debris (recycled when possible) in order to access contaminated area
- Excavation of soils exhibiting concentrations of heavy metals, asbestos and PCBs above OEPA's residential direct contact criterion
- Backfilling, grading and restoration of excavated areas
2.2.1.2 Next Steps
-
Continue removal activities
-
Continue perimeter air sampling for asbestos
-
Review results of air samples
-
Conduct confirmation sampling
-
Install water filtration systems on private wells
-
Work with ATSDR to develop a site specific action level for PCBs
2.2.2 Issues
None at this time.
|
|
|
2.3 Logistics Section
|
|
|
|
Not applicable.
|
|
|
2.4 Finance Section
|
|
|
|
|
|
|
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
| ERRS - Cleanup Contractor |
$1,660,000.00 |
$1,178,000.00 |
$482,000.00 |
29.04% |
| TAT/START |
$190,000.00 |
$132,000.00 |
$58,000.00 |
30.53% |
|
Intramural Costs
|
| |
| Total Site Costs |
$1,850,000.00 |
$1,310,000.00 |
$540,000.00 |
29.19% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
|
|
|
2.5 Other Command Staff
|
|
|
|
2.5.1 Safety Officer The ERRS contractor prepared a health and safety plan (HASP) that was reviewed by Superfund Technical Assessment and Response Team (START) and for the Removal Action. Prior to conducting sampling activities, the HASP was reviewed and signed by on-site personnel.
Daily Health and Safety meetings are held prior to the start of each days activities. Primary topics include traffice safety, proper PPE, identification of work zones and biological hazards.
2.6 Liaison Officer Nothing to report.
2.7 Information Officer Nothing to report.
|
|
3. Participating Entities
|
|
|
3.1 Unified Command Not applicable.
3.2 Cooperating Agencies New Lyme Township
OEPA
ATSDR
|
|
4. Personnel On Site
|
|
|
During this time period the following personnel were on Site:
1 EPA OSC
1 START contractor
8 ERRS contractors
|
|
5. Definition of Terms
|
|
|
|
ATSDR
CERCLA
|
Agency for Toxic Substances and Disease Registry
Comprehensive Environmental Response, Compensation, and Liability Act
|
|
ERRS
|
Emergency and Rapid Response Services
|
|
HASP
mg/L
|
Health and Safety Plan
milligrams per liter
|
|
OEPA
|
Ohio Environmental Protection Agency
|
|
OSC
OSHA
PELs
POLREP
ppm
|
On-Scene Coordinator
Occupational Safety and Health Administration
Permissible Exposure Limits
Pollution Report
parts per million
|
|
PRP
PCB
RCRA
|
Potentially Responsible Party
Polychlorinated Biphenyls
Resource Conservation and Recovery Act
|
|
START
|
Superfund Technical Assessment and Response Team
|
|
TCLP
TSCA
ug/L
uR/hr
|
Toxicity Characteristic Leachate Procedures
Toxic Substances Control Act
micrograms per liter
microroentgens per hour
|
|
U.S. EPA
|
United States Environmental Protection Agency
|
|
|
6. Additional sources of information
|
|
|
6.1 Internet location of additional information/report Additional information can be found at www.epaosc.org/newlymemetals.
6.2 Reporting Schedule POLREPs will be issued weekly.
|
|
7. Situational Reference Materials
|
|
|
Not applicable.
|
|
POLREP #13 Last Updated 9/17/2011
|
|
|