Subject:
|
POLREP #34
R2 Hurricane Irene/TS Lee (NY) Response
Edison, NJ
Latitude: 40.5159553 Longitude: -74.3550459
|
To:
|
|
From:
|
Eric Mosher, Regional Incident Coordinator
|
Date:
|
11/23/2011
|
Reporting Period:
|
11/18/2011 to 11/23/2011
|
1. Introduction
|
|
1.1 Background
|
|
|
Site Number: |
|
|
Contract Number: |
|
D.O. Number: |
|
|
Action Memo Date: |
|
Response Authority: |
Stafford Act |
|
Response Type: |
Emergency |
Response Lead: |
EPA |
|
Incident Category: |
Removal Action |
NPL Status: |
Non NPL |
|
Operable Unit: |
|
Mobilization Date: |
|
|
Start Date: |
8/26/2011 |
Demob Date: |
|
|
Completion Date: |
|
CERCLIS ID: |
|
|
RCRIS ID: |
|
ERNS No.: |
|
|
State Notification: |
|
FPN#: |
|
|
Reimbursable Account #: |
|
EXECUTIVE SUMMARY
EPA response actions to Hurricane Irene and Tropical Storm Lee have been completed in 2 of the 3 previously remaining areas. Operations of been completed in both the DEC Region 4 and 7 areas. Limited work remains in the DEC Region 5 area that consists of consolidation of wastes along with the transportation and disposal of remaining wastes. All collection activities have concluded in the DEC Region 5 area. Field personnel were demobilized for the Thanksgiving holiday and will remobilize to complete operations after the holiday. At this point in time, EPA anticipates all field activities to be completed prior to 12/2/2011.
|
2. Current Activities
|
|
2.1 Operations Section
|
|
|
CURRENT ACTIVITIES
NEW YORK RESPONSE ACTIONS (Hurricane Irene)
NYSDEC Region 4 Area
All Actions in the NYSDEC Region 4 area have been completed. EPA worked with representatives for the town of Prattsville to resolve any outstanding issues as well as drafted and sent the final close-out letter for that site on 11/18/2011.
NYSDEC Region 5 Area
EPA has completed the orphan container collection effort in the NYSDEC R5 area on 11/18. Remaining work in this area includes consolidation, recycling, and disposal of any remaining containers collected by EPA. Completion of this work is anticipated to be prior to 12/2/2011.
NEW YORK RESPONSE ACTIONS (Tropical Storm Lee)
NYSDEC Region 7 Area
All EPA field operations related to TS Lee have been completed. EPA OSC conducted a walk-through of the Barlow Rd facility on 11/16/2011. As of 11/17/2011, the only remaining items included the removal of (1) Conex box and the delivery of site close-out letters. The Conex box was removed from the Barlow Rd facility on 11/21/2011. Close-out letters have been drafted for the Barlow Rd and Owego Sites and were mailed out by 11/23/2011. Close-out letters for the Scarborough Rd and Vestal Site were hand delivered on 11/3/2011.
Below are the Waste Disposition Tables for the NYSDEC Region 7 Areas; Barlow Rd, Scarborough Rd, and the Owego Collection Areas. The Scarborough Rd and Owego Site Tables are final and will be removed from the next Situation Report.
Barlow HHW Pad (as of 11/16/2011) |
Date |
Waste Stream |
Quantity |
Disposal Method |
DisposalLocation |
10/13/2011 |
Propane cylinders |
120 20# cylinders |
Recycle through Broome county |
HHW pad at Broome County |
10/13/2011 |
Propane cylinders |
343 1# cylinders |
Recycle through Broome county |
HHW pad at Broome County |
10/14/2011 |
Propane cylinders |
135 20# cylinders |
Recycle through Broome county |
HHW pad at Broome County |
10/14/2011 |
Lead-acid batteries |
154 each |
Recycle through Broome county |
HHW pad at Broome County |
10/14/2011 |
Dry cell batteries |
2,934 each |
Recycle through Broome county |
HHW pad at Broome County |
10/17/2011 |
Propane cylinders |
200 20# cylinders |
Recycle through Broome county |
HHW pad at Broome County |
10/17/2011 |
Propane tanks |
1 100# tank |
Recycle through Broome county |
HHW pad at Broome County |
10/17/2011 |
Propane tanks |
3 200# tank |
Recycle through Broome county |
HHW pad at Broome County |
11/07/2011 |
Waste Bulk Oils |
84 55-gal drums |
pending |
Northland Environmental, LLC Providence RI |
11/07/2011 |
Waste Bulk OilsOily water (non-reg. liquids)Non-Regulated Liq (antifreeze)Latex paint |
28 55-gal drums9 55-gal drums16 55-gal drums3 cubic yards |
pending |
Northland Environmental, LLC Providence RI |
11/09/11 |
Waste Flammable Liquids |
81 drums |
pending |
Northland Environmental, LLC Providence RI |
11/09/11 |
Waste Mercury |
1 drum (5#) |
pending |
Northland Environmental, LLC Providence RI |
11/09/11 |
Waste Asbestos |
3 drums |
pending |
Northland Environmental, LLC Providence RI |
11/09/11 |
Waste Pesticides, Liquid |
6 drums |
pending |
Northland Environmental, LLC Providence RI |
11/09/11 |
Non-DOT, Non-RCRA Liquids |
3 drums |
pending |
Northland Environmental, LLC Providence RI |
11/09/11 |
NA 1325 Waste Fusee (fl solid) |
2 drums |
pending |
Northland Environmental, LLC Providence RI |
11/09/11 |
UN1950 Waste Aerosols |
4 drums |
pending |
Northland Environmental, LLC Providence RI |
11/09/11 |
UN1760 Waste Corrosive Liq |
8 drums |
pending |
Northland Environmental, LLC Providence RI |
11/09/11 |
UN1497 Waste Oxidizing Solid |
3 drums |
pending |
Northland Environmental, LLC Providence RI |
11/09/11 |
UN2673 Waste Ammonia Sol’n |
2 drums |
pending |
Northland Environmental, LLC Providence RI |
11/09/11 |
UN3267 Waste Corr. Solids |
1 drum |
pending |
Northland Environmental, LLC Providence RI |
11/09/11 |
Non-DOT, Non-RCRA solids |
1 drum |
pending |
Northland Environmental, LLC Providence RI |
11/09/11 |
NA3282 Haz Waste liq (lead) |
3 drums |
pending |
Northland Environmental, LLC Providence RI |
11/09/11 |
UN3099 Waste Oxiding liq. |
3 drums |
pending |
Northland Environmental, LLC Providence RI |
11/09/11 |
UN3080 Waste Isocyanite, Toxic |
1 drum |
pending |
Northland Environmental, LLC Providence RI |
11/09/11 |
UN3266 Waste Corrosive liq |
13 drums |
pending |
Northland Environmental, LLC Providence RI |
11/09/11 |
UN3538 Waste solid, flamm |
5 drums |
pending |
Northland Environmental, LLC Providence RI |
11/09/11 |
UN1263 Waste Paint |
3 cubic yards |
pending |
Northland Environmental, LLC Providence RI |
Scarborough HHW Pad (as of 11/23/2011) |
Date |
Waste Stream |
Quantity |
Disposal Method |
DisposalLocation |
10/17/2011 |
Latex Paint in Cans |
54 cubic yards(32,400 lb est.) |
Landfill |
PSCProvidence RI |
10/17/2011 |
Latex Paint in Cans |
48 cubic yards(28,800 lb est.) |
Landfill |
PSCProvidence RI |
10/18/2011 |
Latex Paint in Cans |
64 cubic yards(38,400 lb est.) |
Landfill |
PSCProvidence RI |
10/18/2011 |
UN1263 Waste Paint related material (oil based) |
52 cubic yards(40,000 lb est.) |
Fuels blending |
PSCProvidence RI |
10/19/2011 |
UN1263 Waste Paint related material (oil based) |
46 cubic yards (32,200 lb est) |
Fuels blending |
Petrochem ProcessingDetroit, MI |
10/19/2011 |
UN1263 Waste Paint related material (oil based) |
47 cubic yards (32,200 lb est) |
Fuels blending |
NorthlandEnvironmental, LLCProvidence RI |
10/19/2011 |
Latex Paint in Cans |
64 cubic yards 938,400 lb est) |
Landfill |
PSCProvidence RI |
10/19/2011 |
UN 3262 Waste Corrosive Solid |
20 cubic yards (12,500 lb est) |
Stabilization/ Landfill |
NorthlandEnvironmental, LLCProvidence RI |
10/19/2011 |
UN1791 Waste Hypochlorite Solutions |
2 cubic yards (1,200 lb est) |
Wastewater Treatment |
NorthlandEnvironmental, LLCProvidence RI |
10/19/2011 |
UN2902 Waste Pesticides, Liquid, Toxic |
22 cubic yards(13,200 est) |
Incineration |
NorthlandEnvironmental, LLCProvidence RI |
10/20/2011 |
Latex Paint in Cans |
41 cubic yards(25,500 lb est.) |
Landfill |
NorthlandEnvironmental, LLCProvidence RI |
10/21/2011 |
Latex Paint in Cans |
40 cubic yards(25,000 lb est.) |
Landfill |
NorthlandEnvironmental, LLCProvidence RI |
10/21/2011 |
UN1950 Waste Aerosols |
17 cubic feet(8,500 lb est.) |
Incineration |
NorthlandEnvironmental, LLCProvidence RI |
10/21/2011 |
UN1760 Waste Corrosive Liquid |
4 drums(2,000 lb est) |
Wastewater Treatment |
NorthlandEnvironmental, LLCProvidence RI |
10/21/2011 |
UN3077 Waste Environmentally Hazardous Substances |
4 boxes(1,800 lb est.) |
Recycle |
NorthlandEnvironmental, LLCProvidence RI |
10/21/2011 |
UN2009 Waste Mercury |
1 drum(20 lb est.) |
Retort |
NorthlandEnvironmental, LLCProvidence RI |
Owego - HHW Pad (as of 11/23/2011) |
Date |
Waste Stream |
Quantity |
Disposal Method |
DisposalLocation |
10/21/2011 |
Latex Paint in Cans |
49 cubic yards(35,000 lb est.) |
Landfill |
Petrochem ProcessingDetroit, MI |
10/21/2011 |
UN1760 Waste Corrosive Liquid |
4 drums(2,000 lb est) |
Wastewater Treatment |
NorthlandEnvironmental, LLCProvidence RI |
10/21/2011 |
UN1950 Waste Aerosols |
17 cubic feet(8,500 lb est.) |
Incineration |
Northland Environmental, LLC; Providence RI |
10/21/2011 |
Non DOT/Non RCRA Regulated Solids |
3 cartons(400 lb est.) |
Landfill |
NorthlandEnvironmental, LLCProvidence RI |
10/21/2011 |
UN1263 Waste Paint related material (oil based) |
11 cartons (7,700 lb est.) |
Fuels blending |
NorthlandEnvironmental, LLCProvidence RI |
10/25/2011 |
Latex Paints |
50 cu yd |
Landfill |
PSCProvidence, RI |
10/26/2011 |
Latex Paints |
49 cu yd |
Landfill |
PSCProvidence, RI |
10/28/2011 |
UN3262 Waste Corrosive Solid, Basic, Inorganic |
10,400 lb (est.) |
Stabilization/ Landfill |
NorthlandEnvironmental, LLCProvidence RI |
10/28/2011 |
UN1263 Waste Paint Material |
700 lb (est.) |
Fuels blending |
NorthlandEnvironmental, LLCProvidence RI |
10/28/2011 |
NA2122 Asbestos |
700 lb (est.) |
Landfill |
NorthlandEnvironmental, LLCProvidence RI |
10/28/2011 |
UN1701 Waste Hypochlorite Solutions |
1,600 lbs (est.) |
Wastewater Treatment |
NorthlandEnvironmental, LLCProvidence RI |
10/28/2011 |
UN2902 Waste Pesticides |
5,600 lbs (est.) |
Incineration |
NorthlandEnvironmental, LLCProvidence RI |
EPA REGION 2 COORDINATION ACTIVITIES
One primary EPA resource has been dedicated for situational updates and documentation. The liaison officer will remain integrated but on a part-time basis. Personnel working on approving cost accounting and monetary tracking will also maintain functions in the REOC.
|
|
2.2 Planning Section
|
|
|
EPA has been working on plans for the closure of response activities related to Hurricane Irene and Tropical Storm Lee. Planning activities include final documentation and planning for future after-action sessions.
|
|
2.3 Logistics Section
|
|
|
No longer Applicable
|
|
2.4 Finance Section
|
|
|
No information available at this time.
|
|
2.5 Other Command Staff
|
|
|
SAFETY OFFICER
Due to the close out of field activities during this reporting period, the Safety Officer position has been demobilized. Any additional safety needs required by field personnel during the close out phase will be conducted by the operational OSC and support contractors.
LIAISON OFFICER
Steve Touw has been designated as the Liaison Officer (LNO) for Hurricane Irene and Tropical Storm Lee response efforts. During the previous Situation Report, it was reported that the LNO had contacted the FEMA Mission Assignment Coordinator and requested a final time extension for the Hurricane Irene field operations. EPA requested a time extension on one mission assignment for Irene operations in the DEC Region 5 areas of Essex and Clinton Counties in New York. The request was for an extension from 11/18/2011 to 12/02/2011. EPA remains in contact with FEMA who is currently working on this item.
INFORMATION OFFICER
Pat Seppi, 646-369-0068, has been the Public Information Officer (PIO) designated for the response. Due to the decrease in work activities and the closure of operational areas, the PIO had no activities to report during this period. The PIO remains available for support if or when needed.
|
3. Participating Entities
|
|
EPA continues coordinating with FEMA, NYS DEC, NYSEMO, as well as County officials, and local government agencies in its current operational areas.
|
4. Personnel On Site
|
|
The following table is a reflection of the most current available resources at the time and day of reporting. It reflects the amount of personnel solely on the day of reporting. Because the Situation Report details over several days, the following table may not be a representation of every work day.
During this operational period, some equipment and personnel were demobilized for lack of need while the remaining resources were demobilized due to the thanksgiving holiday. The anticipated active resources size for the next operational period is in the range of 5-10 personnel. These personnel will be assigned to the remaining tasks associated with operations in the NYSDEC Region 5 area, consolidation of wastes along with the transportation and disposal of remaining wastes.
Region/State |
Current EPA Personnel In Field
(All Venues other than EPA Offices) |
Current EPA Contractor Personnel In Field |
EPA Personnel in REOC |
Contractor Personnel in REOC |
Total |
Region 2 |
|
|
1 |
0 |
1 |
New York |
1 |
0 |
|
|
1 |
New Jersey |
0 |
0 |
|
|
0 |
Total |
1 |
0 |
1 |
0 |
2 |
|
5. Definition of Terms
|
|
NA
|
6. Additional sources of information
|
|
ADDITIONAL INFORMATION
WEBSITE: http://www.epaosc.org/R2HurricaneIreneResponse
If you find that you are having trouble viewing the website, please contact the EPA duty officer at (732) 906-6850
EPA Edison REOC 732-906-6850
Afterhours Notifications, National Response Center (NRC) 800-424-8802
Regional Incident Commander (RIC) for NY, James Daloia 908-420-4505
Liaison Officer, Steve Touw 908-420-4458
Information Officer, Pat Seppi 646-369-0068
REPORTING SCHEDULE
Situation Reports are generated once a week. The next Situation Report will be distributed on Thursday December 1, 2011.
|
7. Situational Reference Materials
|
|
No additional material at this time
|
|
|