POLLUTION/SITUATION REPORT
ESI-PRP Removal - Removal Polrep

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region V
|
|
Subject:
|
POLREP #54
Progress
ESI-PRP Removal
B5YS
Indianapolis, IN
Latitude: 39.9128600 Longitude: -86.2423680
|
|
To:
|
Sue Michael, City of Indianapolis
Tom White, Citizens Energy Group
Harry Atkinson, IDEM
Ryan Groves, IDEM
Megan Nagle, IDEM
George Ritchotte, IDEM
Jason Doerflein, Marion County Health Department
Sam Bruner, Pike Fire Department
John Maritote, U.S. EPA Region V
Janet Pope, U.S. EPA Region V
Kim Cussen, United Water
Stan Rigney, IDEM
Randy Braun, IDEM
Maupin Natalie, IDEM
Eric Kaufman, Marion County Health Department
Jason Ravenscroft, Marion County Health Department
Dan Sparks, USFWS
Ed Karecki, USFWS
Bob Masbaum, Citizens Energy Group
Kristen Heitman, Providence Wildlife
Michael Massonne, City of Indianapolis
Cheryl Carlson, Citizens Energy Group
Emily Mack, City of Indianapolis
Thomas Marks, U.S. EPA
Rex Osborn, IDEM
Gabriele Hauer, IDEM
Max Michael, IDEM
Deirdre Wyatt, IDEM
Jennifer Schick, City of Indianapolis
|
|
From:
|
Verrneta Simon, On-Scene Coordinator
|
|
Date:
|
5/4/2012
|
|
Reporting Period:
|
4/27/12 - 5/4/12
|
|
1. Introduction
|
|
|
1.1 Background
|
|
|
|
|
Site Number: |
B5YS |
|
Contract Number: |
|
|
D.O. Number: |
|
|
Action Memo Date: |
9/30/2010 |
|
Response Authority: |
CERCLA |
|
Response Type: |
PRP Oversight |
|
Response Lead: |
PRP |
|
Incident Category: |
Removal Action |
|
NPL Status: |
Non NPL |
|
Operable Unit: |
|
|
Mobilization Date: |
4/6/2011 |
|
Start Date: |
4/6/2011 |
|
Demob Date: |
|
|
Completion Date: |
|
|
CERCLIS ID: |
INN0051050501 |
|
RCRIS ID: |
|
|
ERNS No.: |
|
|
State Notification: |
|
|
FPN#: |
|
|
Reimbursable Account #: |
|
1.1.1 Incident Category
Bankrupt Commercial Used Oils Facility
1.1.2 Site Description
See POLREP 1
1.1.2.1 Location
4910 West 86th Street, Indianapolis, Indiana 46268
|
|
2. Current Activities
|
|
|
2.1 Operations Section
|
|
|
|
2.1.1 Narrative
See POLREP 1
2.1.2 Response Actions to Date
On April 27, 2012, no rain fell over night or during the day.
-
Trihydro requested visual inspection of the solidification pits. No product was visible on the floors or walls of the solidification pits, and the condition was documented with photos.
-
AVS completed deconning the solidification pits.
-
TM Salvage collected stockpiled scrap in the northeast area.
-
TM Salvage crews continued picking up insulation from Tank 51.
On May 2, 2012, 1.48” of rain fell over night and 0.06" during the day.
On May 3, 2012, no rain fell over night or during the day.
On May 4, 2012, no rain fell overnight.
- Approximately 500 tons of gravel and sand was delivered to the site
- HyGrade continues to add the clay back fill to both bunker tanks
- Trihydro discharged approximately 18,600 gallons of GAC system treated stormwater to Oil Creek
2.1.3 Enforcement Activities, Identity of Potentially
Responsible Parties (PRPs)
N/A
2.1.4 Progress Metrics
| Waste Stream |
Medium |
Quantity |
Discharge |
Treatment |
Disposal |
| Oily Water |
Liquid |
4,618,816 gallons |
|
X |
|
| Stormwater |
Liquid |
437,356 gallons |
|
X |
|
| Tank 51 Containment |
Liquid |
452,051 gallons |
|
X |
|
| Totes and Drums |
Liquid |
13,310 gallons |
|
X |
|
| Solidified Sludge |
Solid |
29,580 cyd |
|
|
X |
| Unsolidified Sludge |
Liquid |
265 cyd |
|
X |
|
| Treated Stormwater |
Liquid |
1,314,036 gallons |
X |
|
|
|
|
|
2.2 Planning Section
|
|
|
|
2.2.1 Anticipated Activities
- Final decontamination of the solidification pits.
- Scrap Tank 51.
- Backfill bunker tanks with a suitable fill material.
- Receive exit strategy plan from PRP Group.
2.2.1.1 Planned Response Activities
None
2.2.1.2 Next Steps
U.S. EPA will provide oversight of PRP Group removal activities.
2.2.2 Issues
None
|
|
|
2.3 Logistics Section
|
|
|
|
Not applicable.
|
|
|
2.4 Finance Section
|
|
|
|
No information available at this time.
|
|
|
2.5 Other Command Staff
|
|
|
|
2.5.1 Safety Officer
Not applicable.
2.6 Liaison Officer
Not applicable.
2.7 Information Officer
2.7.1 Public Information Officer
2.7.2 Community Involvement Coordinator
The next community meeting is not planned.
|
|
3. Participating Entities
|
|
|
3.1 Unified Command
Indiana Department of Environmental Management
Indianapolis Department of Public Works
Pike Township Fire Department
City of Indianapolis
3.2 Cooperating Agencies
Marion County Health Department
|
|
4. Personnel On Site
|
|
|
START Contractor
Trihydro
AVS (subcontractor to Trihydro)
TM Salvage (subcontractor to the PRP Group)
|
|
5. Definition of Terms
|
|
|
ASAOC – Administrative Settlement Agreement on Consent
ERRS – Emergency and Rapid Response Services
IDEM – Indiana Department of Environmental Management
OSC – On-Scene Coordinator
POLREP – Pollution Report
PRP - Potentially Responsible Party
QMP - Quality Management Plan
RCRA – Resource Conservation and Recovery Act
START – Superfund Technical Assessment and Response Team
U.S. EPA – United States Environmental Protection Agency
|
|
6. Additional sources of information
|
|
|
6.1 Internet location of additional information/report
For additional information, please refer to the US EPA lead removal action website at www.epaosc.org/esi
6.2 Reporting Schedule
The next POLREP will be submitted at a date to be determined.
|
|