Holly Frontier Corp Fire

All POL/SITREP's for this site Holly Frontier Corp Fire
Tulsa, OK - EPA Region VI
POLREP #1
Initial
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Holly Frontier Corp Fire - Removal Polrep
Initial Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region VI

Subject: POLREP #1
Initial
Holly Frontier Corp Fire
FPN E12623
Tulsa, OK
Latitude: 36.1376812 Longitude: -96.0115090


To:
From: Nicolas Brescia, OSC
Date: 8/2/2012
Reporting Period: 08/02/2012

1. Introduction
  1.1 Background
   
Site Number: FPN E12623    Contract Number:  
D.O. Number:      Action Memo Date:  
Response Authority: OPA    Response Type: Emergency
Response Lead: EPA    Incident Category: Removal Assessment
NPL Status: Non NPL    Operable Unit:
Mobilization Date: 8/2/2012    Start Date: 8/2/2012
Demob Date: 8/2/2012    Completion Date:  
CERCLIS ID:    RCRIS ID:
ERNS No.:    State Notification:
FPN#: E12623    Reimbursable Account #:

1.1.1 Incident Category
OPA Emergency Response Assessment.
1.1.2 Site Description
Refinery
1.1.2.1 Location
1700 South Union Avenue, Tulsa, OK 74107.

1.1.2.2 Description of Threat
OSC Fife was informed of a refinery fire via the media. OSC Fife contacted the RP, but was given very little information on the situation and any impacts associated with the incident. The RP informed OSC Fife that a fire had occurred at their facility causing a release of diesel fuel, but the fire and firewater had been contained. Several residential areas, and the Arkansas River are located adjacent to the facility. OSC Fife dispatched OSC Brescia to the site to gather more information and to determine if any off-site impacts occurred.

1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
OSC Brescia and two EPA START personnel arrived on site at 1345 and met with the RP's environmental manager. The manager informed OSC Brescia that the fire had began at 0200, and was extinguished at 0415 by on-site fire personnel. The fire originated from the refineries distillate hydrotreater which had a faulty flange causing a pressurized release of diesel fuel. The diesel fuel ignited and burned, causing a fire and release of fuel/firewater onto the property. The RP manager informed OSC Brescia that a large quantity of diesel fuel burned during the incident and that approximately 200 barrels were released into their waste water treatment system on site and was contained on site. The RP manager informed OSC Brescia that the refineries safety team conducted air monitoring utilizing five gas meters around the perimeter of the fire during the incident. OSC Brescia requested a copy of the air monitoring data and the manager informed OSC Brescia that he would provide it on 08/03/2012. The RP manager informed OSC Brescia that no significant peaks occurred during their air monitoring activities which included monitoring for VOCs, H2S, and CO. OSC Brescia requested that the RP give them access to the waste water treatment ponds to view any collected firewater and to the incident location to view the damage. The RP provided a visit to the ponds and to the distillate hydrotreater. No offsite release of diesel fuel was observed by the OSC. OSC Brescia requested final calculations from the RP once they were known and for the air monitoring data for review.

OSC Brescia asked the RP manager why the facility did not report the incident to the NRC, and the RP Manager informed OSC Brescia that no diesel fuel migrated off-site or into any waterway, and that no known constituents exceeded any reportable quantities for an air release.

OSC Brescia and EPA START demobilized from the site.

2. Current Activities
  2.1 Operations Section
    No information available at this time.

  2.2 Planning Section
    2.2.1 Anticipated Activities
Review calculated release numbers and review air monitoring data from RP.

2.2.1.1 Planned Response Activities
No further actions.

2.2.1.2 Next Steps
No further actions.
2.2.2 Issues

  2.3 Logistics Section
    No information available at this time.

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    No information available at this time.

3. Participating Entities
  No information available at this time.

4. Personnel On Site
  ODEQ and OSHA were involved.

5. Definition of Terms
  No information available at this time.

6. Additional sources of information
  No information available at this time.

7. Situational Reference Materials
  No information available at this time.