U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Baycote Metal Finishing Site - Removal Polrep

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region V
|
|
Subject:
|
POLREP #12
Progress
Baycote Metal Finishing Site
C5B2
Mishawaka, IN
Latitude: 41.6497046 Longitude: -86.1648540
|
|
To:
|
Sam Borries, U.S. EPA
Jason El-Zein, U.S. EPA
Valencia Darby, Department of Interior
Lindy Nelson, Department of Interior
Mark Durno, U.S. EPA
Mark Johnson, ATSDR
Sherry Fielding, U.S. EPA
Charlie Gebien, U.S. EPA
John Glover, U.S. EPA
Beverly Kush, U.S. EPA
Mindy Clements, U.S. EPA
Thomas Marks, U.S. EPA
Mike Ribordy, U.S. EPA
Harry Atkinson, IDEM
Gabriele Hauer, IDEM
Max Michael, IDEM
Rex Osborn, IDEM
John Lankowicz, St. Joseph County Health Department
Dan Chesterson, IDEM
Dale Freeman, City of Mishawaka
Virginia Narsete, U.S. EPA
Thomas Turner, U.S. EPA
Carol Ropski, U.S. EPA
Rich Hackel, IDEM
|
|
From:
|
Paul Atkociunas, OSC
|
|
Date:
|
8/24/2012
|
|
Reporting Period:
|
August 20 - 24, 2012
|
|
1. Introduction
|
|
|
1.1 Background
|
|
|
|
|
Site Number: |
C5B2 |
|
Contract Number: |
EP-S5-09-05 |
|
D.O. Number: |
|
|
Action Memo Date: |
2/23/2012 |
|
Response Authority: |
CERCLA |
|
Response Type: |
Time-Critical |
|
Response Lead: |
EPA |
|
Incident Category: |
Removal Action |
|
NPL Status: |
Non NPL |
|
Operable Unit: |
|
|
Mobilization Date: |
5/29/2012 |
|
Start Date: |
5/29/2012 |
|
Demob Date: |
|
|
Completion Date: |
|
|
CERCLIS ID: |
|
|
RCRIS ID: |
|
|
ERNS No.: |
|
|
State Notification: |
|
|
FPN#: |
|
|
Reimbursable Account #: |
|
1.1.1 Incident Category
Time-Critical Removal Action: Manufacturing/Processing/Maintenance – Electroplating, Metal Finishing
1.1.2 Site Description
See Initial Polrep.
1.1.2.1 Location
The Baycote Metal Finishing Site is located at 1302 Industrial Drive in Mishawaka, St. Joseph County, Indiana 46544. The geographical coordinates for the Site are 41°39’0.03” North latitude and 86°09’57.11” West longitude. The Site is bordered by industrial properties to the north, east, and south and Industrial Drive and industrial properties to the west. Residential properties are located approximately 700 feet to the west. Seven churches and two schools are located within 1 mile of the Site. The St. Joseph River, a major surface water body that terminates in Lake Michigan, is located 0.85 mile northwest of the Site.
1.1.2.2 Description of Threat
See Initial Polrep.
1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
See Initial Polrep.
|
|
2. Current Activities
|
|
|
2.1 Operations Section
|
|
|
|
2.1.1 Narrative
In a letter dated November 11, 2011, the St. Joseph County Health Department (SJCHD) requested assistance from the U.S. EPA to secure hazardous wastes left on-site. SJCHD was concerned that the Site posed a significant threat to the health and safety of companies within the industrial park as well as the residential area located less than a 1,000 feet from the facility. On February 23, 2012, the Director of U.S. EPA's Superfund Division approved an Action Memorandum for a time-critical removal action at the Baycote Metal Finishing Site.
On April 6, 2012, U.S. EPA issued a Unilateral Administrative Order to the potentially responsible parties to conduct a removal action at the Site. The potentially responsible parties presented and inability to pay argument and indicated that they did not intend to conduct a removal action at the Site. EPA began time-critical removal actions at the Baycote Site on May 29, 2012.
This is a large Site, with 11 plating lines in 6 areas and an onsite waste water treatment plant with a collapsed roof. The OSC and its contractors have adopted a work plan to cleanup one area/plating line at a time, starting with the most contaminated while ensuring safety and efficiency.
2.1.2 Response Actions
Please refer to previous Polreps for response actions before August 20, 2012.
During the reporting period, EPA Conducted the following activities:
- EPA and START continued to conduct site perimeter and work area air monitoring to ensure worker and community protection.
- Cleanup in Area A continues. Cyanide sludge in Vat A15 was removed and containerized for off-site disposal. Vat A15 was removed from containment, scraped and powerwashed. The liner for the Vat was adhered to the wall of the vat. Contaminated sections of the liner were be removed and placed into the Haz Waste Debris roll-off. The vat will be rendered unusable and left onsite. Disposal options for the sludge in the secondary containment units for Area A are being considered.
- Cleanup in Area C continues. Light stands were staged; debris and containers were removed from the room. Waste liquids were pumped from Vat C7 to the 4,900 gallon poly tank.
- Cleanup in Areas H continued; Vat H22 was rendered unusable and will be left in place. Although residual debris remained in Area H, focus will be placed in other areas of the Site that contain bulk liquids and concentrated wastes.
- Cleanup in Area G continued; Area L was accessed through a framed wall shared with Area G (the doorway into Area L was inaccessible because it is located in the collapsed portion of Area W). Waste containers were removed from Areas G and L, HazCatted and prepared for off-site disposal.
- Base liquids were consolidated into the 4,900 gallon poly tank and shipped off-site for disposal; see Table below for details.
- Waste was removed from tanks associated with the wastewater treatment system located in Area E. Tanks were demolished, rinsed and placed into the appropriate roll-off for off-site disposal. Process piping associated with the wastewater treatment system was cut, rinsed and placed into the appropriate roll-off. The steel decking associated with the system was scraped and powerwashed. Rinse waters were collected for off-site disposal.
- One roll-off of Nonhazardous debris was removed from Site; see Table below for details.
- A supplier for the cylinders located at the Site was contacted.
- Cubic yard boxes of Hazardous waste solids were shipped for off-site disposal; see Table below for details.
- EPA, ERRS and START continued to assess options for accessing, removing wastes in Area W.
- EPA’s supplied air trailer is onsite to support Level B work.
- EPA and its contractors is implementing Green Practices onsite (double sided printing, dedicated water bottles, dedicated steel toed Chem boots, city electrical power, CFL bulbs, etc...)
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
Information on the PRP is in the Site file. Enforcement strategies are included in a confidential enforcement memorandum.
2.1.4 Progress Metrics
The following waste has been staged and ready for disposal as of August 24, 2012
21 55-gallon drums of Haz basic vat bottom sludge
1 55-gallon drums of Haz acid vat bottom sludge
10 330-gallon totes of Haz cyanide containing liquid
47 55-gallon drums of Haz cyanide containing vat bottom sludge
1 cubic-yard boxes of Haz cyanide solids
2 95-gallon overpacks of Haz cyanide solids
0 cubic-yard boxes of Haz solids
3 330-gallon totes of Haz acid liquid
19 55-gallon drums of Haz neutral liquid
15 RCRA-empty vats (various sizes)
69 330-gallon tote metal frames (poly portion has been cut apart and placed in roll-offs)
10 330 gallon tote haz base liquid
11 330 gallon tote haz neutral liquid
13 55-gallon drums of Haz neutral solids
3 55-gallon drums of Haz base liquid
41 55-gallon drums of non-Haz neutral solids
1 4,900 gallon poly tank (full of neutral liquid)
| Waste Stream |
Date |
Quantity |
Manifest # |
Treatment |
Disposal facility |
| Solid Waste Debris |
6/6/12 |
30 Cubic yards (CY) |
001 |
|
WM Landfill Wyatt IN |
| Solid Waste Debris |
6/8/12 |
30 CY |
002 |
|
WM Landfill Wyatt IN |
| Haz Waste Debris |
6/18/12 |
25 CY |
004354475FLE |
|
Envirosafe Services of Ohio, Oregon Ohio |
| Solid Waste Debris |
6/21/12 |
30 CY |
003 |
|
WM Landfill Wyatt IN |
| Haz Waste Debris |
6/26/12 |
30 CY |
004354473 FLE |
|
Envirosafe Services of Ohio, Oregon Ohio |
| Solid Waste Debris |
6/29/12 |
30 CY |
004 |
|
WM Landfill, Wyatt IN |
| Haz Waste Debris |
7/03/12 |
25 CY |
004354477FLE |
|
Envirosafe Services of Ohio, Oregon, Ohio |
| Solid Waste Debris |
7/12/12 |
30 CY |
005 |
|
WM landfill, Wyatt, IN |
| Solid Waste Debris |
7/18/12 |
30 CY |
006 |
|
WM landfill, Wyatt, IN |
| Cyanide Waste (UN 1935) |
7/31/12 |
3440 gallons |
010411950JJK |
|
Dynecol Inc., Detroit, MI |
Waste Toxic,
Inorganic (UN 3288) |
7/31/12 |
6400 pounds |
010411950JJK |
|
Dynecol Inc., Detroit, MI |
| Solid Waste Debris |
8/02/12 |
30 CY |
007 |
|
WM landfill, Wyatt, IN |
| Chromic Acid (UN 1755) |
8/02/12 |
2700 gallons |
010411037JJK |
|
Dynecol Inc., Detroit, MI |
| Acid Liquid (UN 3264) |
8/02/12 |
1475 gallons |
010411037JJK |
|
Dynecol Inc., Detroit, MI |
| Haz Waste Debris |
8/09/12 |
25 CY |
004354466FLE |
|
Envirosafe Services of Ohio, Oregon, Ohio
|
| Waste Corrosive Liquid, Basic (UN 3266) |
8/10/12 |
4638 gallons |
010411219 JJK |
|
Dynecol Inc., Detroit, MI
|
| Acid Liquid (Nitric, Chromium, Cadmium, UN 3264) |
8/10/12 |
1320 gallons |
010411079 JJK |
|
Dynecol Inc., Detroit, MI
|
| Waste Acid Liquid (Hydrochloric, Sulfuric, Chromium, UN 3264) |
8/10/12 |
1920 gallons |
010411079 JJK
|
|
Dynecol Inc., Detroit, MI
|
| Solid Waste Debris |
8/15/12 |
30 CY |
008 |
|
WM landfill, Wyatt, IN |
| Waste Chromic Acid (UN 1755) |
8/17/12 |
3420 gallons |
010411337 JJK |
|
Dynecol Inc., Detroit, MI |
| Waste Acid Liquid (Nitric, UN3264) |
8/17/12 |
790 gallons |
010411337 JJK |
|
Dynecol Inc., Detroit, MI |
| Hazardous Waste Solid (NA3077) |
8/20/12 |
22 CY |
005607311 FLE |
|
Michigan Disposal, Belleville, MI |
| Solid Waste Debris |
8/20/12 |
30 CY |
009 |
|
WM landfill, Wyatt, IN |
| Waste Corrosive Liquid, Basic (UN3266) |
8/21/12 |
3249 gallons |
010411359 JJK |
|
US Ecology, Detroit, MI (formerly Dynecol) |
| Solid Waste Debris |
8/24/12 |
30 CY |
010 |
|
WM landfill, Wyatt, IN |
|
|
|
2.2 Planning Section
|
|
|
|
2.2.1 Anticipated Activities
2.2.1.1 Planned Response Activities
Removal activities on Site will include:
- Continue cleanup in Areas C and E.
- Recycle RCRA empty containers.
- Continue to consolidate and package hazardous substances, pollutants, and contaminants for
transportation and off-site disposal;
- Evaluate bids to determine disposal options/facility.
- Dismantle and decontaminate process equipment and building components associated with
the plating areas, as necessary;
- Transport and dispose of all characterized or identified hazardous substances, pollutants, or
contaminants to a RCRA/CERCLA-approved disposal facility in accordance with U.S. EPA
Off-Site Rule (40 CFR § 300.440) .
- Site Work plan and schedule have been submitted and will continue to be adjusted as needed. Work is planned to continue the end of October 2012.
2.2.1.2 Next Steps
During the week of August 27, 2012, the following activities are anticipated:
- Transport the following waste for off-site disposal: 1) Cyanide waste; 2) Neutral liquids.
- Continue cleanup work in Area C, specifically pump the water accumulated on the floor of the room, and removal of the bulk of the waste in the Area.
- Determine management / disposal options for wastes accumulated in the secondary containment units in Area A.
- Continue to remove wastes, powerwash, and manage wastes from management of the wastewater treatment system located in Area E.
- Assess options to access / manage wastes located in Area W.
- Consolidate Neutral liquids into the 4,900 gallon poly tank in preparation for shipment.
- Consolidate / repackage waste into containers as needed into D.O.T. shippable containers.
- Demolish RCRA empty containers.
- Conduct hazcat testing to characterize additional waste samples for disposal.
- Continue air monitoring in the work zone and the perimeter of the Site to protect workers and residents.
- Continue Evaluate the bids for the disposal of hazardous waste and chose facility as needed.
- Continue to submit waste profiles to selected disposal facilities as needed.
- Recycle RCRA empty containers.
2.2.2 Issues
The main health and safety concerns during the period at the Site are potentially harmful emissions of hydrogen cyanide, acid vapor/spills, and particulates containing Cadmium and any other contaminants present. The issue is addressed through engineering controls, PPE, and good work practices. An ERRS Chemist is performing compatibility testing on all materials to ensure proper management.
On August 23, 2012, an AreaRAE unit was incidentally placed on container E50 (cubic yard box), which was located in Area E. The unit indicated elevated levels (6 parts per million) of Hydrogen Cyanide. START screened the container and confirmed elevated readings adjacent to the opening of the container. Readings away from the container remained non-detect. The container was re-located to a west dock door. ERRS and START conducted a level B entry to assess the contents and sample the waste. Bags labeled as sodium metabisulfite were observed. Two samples were collected for Hazard Categorization. Material Safety Data Sheets for sodium metabisulfite indicated that sulfur dioxide may be generated as a degradation product. The RAE Systems manual indicated that Hydrogen Cyanide sensors have a cross-sensitivity to sulfur dioxide. Hazard Categorization results of the sample material did not indicate the presence of cyanide. ERRS repackaged the contents of the cubic yard box into 55-gallon drums while in Level B PPE. No other concerns were noted.
|
|
|
2.3 Logistics Section
|
|
|
|
NA
|
|
|
2.4 Finance Section
|
|
|
|
|
|
|
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
| ERRS - Cleanup Contractor |
$1,000,000.00 |
$561,300.00 |
$438,700.00 |
43.87% |
| START |
$117,500.00 |
$80,100.00 |
$37,400.00 |
31.83% |
|
Intramural Costs
|
| |
| Total Site Costs |
$1,117,500.00 |
$641,400.00 |
$476,100.00 |
42.60% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
|
|
|
2.5 Other Command Staff
|
|
|
|
2.5.1 Safety Officer
The Health and Safety Plan and was approved and signed by all site personnel. Safety meetings are held daily.
2.5.2 Liaison Officer
NA
2.5.3 Information Officer:
Community Involvement Coordinator: Ginny Narsete
|
|
3. Participating Entities
|
|
|
3.1 Unified Command
NA
3.2 Cooperating Agencies
IDEM
City of Mishawaka
St. Joseph County Health Department
Mishawaka Fire Department
|
|
4. Personnel On Site
|
|
|
The following numbers of personnel were on-Site during the reporting period:
| Organization |
Position |
# Personnel |
| EPA |
OSC |
1 |
| ERRS |
Response Manager |
1 |
| |
Chemist |
1 |
| |
Foreman |
1 |
| |
Laborer |
5 |
| |
Field Cost Accountant |
1 |
| |
Equipment Operator |
1 |
| Weston |
START |
1 |
|
|
5. Definition of Terms
|
|
|
Baycote Baycote Metal Finishing Site
CERCLA Comprehensive Environmental Response, Compensation, and Liability Act
CRZ Contamination Reduction Zone
EPA Environmental Protection Agency
ERRS Emergency and Rapid Response Services
D.O.T. Department of Transportation
FCA Field Cost Accountant
HASP Health and Safety Plan
HAZCAT Hazardous Categorization
IDEM Indiana Department of Environmental Management
NA Not Applicable
OSC On-Scene Coordinator
PolRep Pollution Report
RCRA Resource Conservation and Recovery Act
PRP Potentially Responsible Party
RM Response Manager
START Superfund Technical Assessment and Response Team
|
|
6. Additional sources of information
|
|
|
6.1 Internet location of additional information/report
www.epaosc.org/BaycoteMetalFinishing
6.2 Reporting Schedule
PolReps will be submitted on a weekly or bi-weekly basis.
|
|
7. Situational Reference Materials
|
|
|
No information available at this time.
|
|
POLREP #12 Last Updated 8/24/2012
|
|
|