Nexeo Solutions

All POL/SITREP's for this site Nexeo Solutions
Garland, TX - EPA Region VI
POLREP #1
Initial and Final
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Nexeo Solutions - Removal Polrep
Initial and Final Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region VI

Subject: POLREP #1
Initial and Final
Nexeo Solutions

Garland, TX
Latitude: 32.8871800 Longitude: -96.6757860


To:
From: Mike McAteer, OSC
Date: 11/18/2012
Reporting Period: 11/16/2012 through 11/18/2012

1. Introduction
  1.1 Background
   
Site Number:      Contract Number:  
D.O. Number:      Action Memo Date:  
Response Authority: CERCLA    Response Type: Emergency
Response Lead: PRP    Incident Category:
NPL Status: Non NPL    Operable Unit:
Mobilization Date: 11/16/2012    Start Date: 11/16/2012
Demob Date: 11/18/2012    Completion Date: 11/18/2012
CERCLIS ID:    RCRIS ID:
ERNS No.:    State Notification:
FPN#:    Reimbursable Account #:

1.1.1 Incident Category
Facility fire involving Methanol, Toluene, Lacolene, and several other unknown flammable hydrocarbons.

1.1.2 Site Description
Nexeo Solutions is located at 3101 Wood Drive, Garland, Dallas County, Texas. Nexeo Solutions is a chemical blending facility used for down-well oil and gas exploration, chemical distribution, and RCRA certified waste storage facility. Nexeo Solutions is located in a light industrial area of the City of Garland.

1.1.2.1 Location
3101 Wood Drive, Garland, Texas

32.887114W, -96.60261N

1.1.2.2 Description of Threat

At approximately 3:30 pm on November 16, 2012, a fire broke out at Nexeo Solutions' distribution/loading building creating a smoke plume that drifted off-site over residential neighborhoods primarily to the west of the facility. An evacuation order of 1/4 mile in all directions from the facility was issued by the Garland Fire Department. Fire suppressant water runoff moved north and eastward into an adjacent storm drain which flowed into an unnamed creek.

1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results


2. Current Activities
  2.1 Operations Section
    2.1.1 Narrative

2.1.2 Response Actions to Date
On 16 November 2012, EPA OSC Mike McAteer and START-3 mobilized to the site and began response activities. Upon arrival, EPA and START-3 collected facts regarding the incident, took photo documentation, and performed air monitoring in surrounding residential neighborhoods and at the incident location. Air monitoring included PH3, NO2, LEL, O2, Cl2, SO2, NH3, HCN, VOC, CO, and H2S; no detections were observed. Response activities by the City of Garland included creating an earthen dam down stream in the affected unnamed creek at Shiloh Road bridge. Response activities by RP contractors included placing soft boom and sorbent in an affected storm drain, removing water at the earthen dam created by the City of Garland, and storing water in frac tanks staged in the median of Shiloh Road. Samples were taken of the water and will be sent to a laboratory for waste characterization. TCEQ representatives were also on-site to document cleanup activities.

17 November 2012, EPA OSC Mike McAteer and START-3 continued to monitor and document cleanup activities. RP contractors continued to remove water from behind the earthen dam and store it in on-site frac tanks. Nexeo's environmental manager was on-site to expedite cleanup process.  Garland Fire Department crews remained at the location of the fire all day due to continued smoldering and periodic small flare ups.  EPA left the site at approximately 1600 hours and TCEQ took the lead on working with Nexeo to determine continued surface water sampling parameters and shut down protocol.

2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)

2.1.4 Progress Metrics

Waste Stream Medium Quantity Manifest # Treatment Disposal
           
           
           


  2.2 Planning Section
    2.2.1 Anticipated Activities
RP contractors will continue to remove water in the unnamed creek at the earthen dam created at the bridge at Shiloh Road, and store in frac tanks on-site until the waste is profiled for disposal.  TCEQ will work with Nexeo to determine water sampling analytical parameters and shutdown protocol.

2.2.1.1 Planned Response Activities

2.2.1.2 Next Steps

2.2.2 Issues

  2.3 Logistics Section
    No information available at this time.

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    No information available at this time.

3. Participating Entities
  3.1 Unified Command

3.2 Cooperating Agencies
USEPA
TCEQ
City of Garland
    Health Department
    Fire Department
    Police Department
    Public Works
Nexeo Solutions
    Protect Environmental
    Adler
    Agricultural Solutions, Inc. (ASI)

4. Personnel On Site
  No information available at this time.

5. Definition of Terms
  No information available at this time.

6. Additional sources of information
  No information available at this time.

7. Situational Reference Materials
  No information available at this time.