U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Flat Top Mine & Griffin Ashing Site (OU1) - Removal Polrep
Initial Removal Polrep

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region VIII
|
Subject:
|
POLREP #1
Progress
Flat Top Mine & Griffin Ashing Site (OU1)
08RW
Ludlow, SD
Latitude: 45.8456780 Longitude: -103.3678530
|
To:
|
|
From:
|
Shun-Ping Chau, OSC
|
Date:
|
11/21/2012
|
Reporting Period:
|
October 1, 2012 to Nov. 21, 2012
|
1. Introduction
|
|
1.1 Background
|
|
|
Site Number: |
SDN000802781 |
|
Contract Number: |
|
D.O. Number: |
|
|
Action Memo Date: |
|
Response Authority: |
CERCLA |
|
Response Type: |
Time-Critical |
Response Lead: |
EPA |
|
Incident Category: |
Removal Action |
NPL Status: |
Non NPL |
|
Operable Unit: |
|
Mobilization Date: |
10/1/2012 |
|
Start Date: |
10/2/2012 |
Demob Date: |
|
|
Completion Date: |
|
CERCLIS ID: |
|
|
RCRIS ID: |
|
ERNS No.: |
|
|
State Notification: |
|
FPN#: |
|
|
Reimbursable Account #: |
|
1.1.1 Incident Category
Time-critical removal.
1.1.2 Site Description
The Flat Top Mine Site is northeast of the town of Ludlow, Harding County, South Dakota. Uranium mining activities occurred around Ludlow in the North Cave Hills, South Cave Hills and Flint Buttes from the late 1950s to 1964 under the General Mining Laws and Public Law 357, which did not require any restoration. The North Cave Hills and South Cave Hills are part of the Custer National Forest and subsequently owned by the United States Forest Service (USFS).
The Flat Top Mine is located in the Flint Buttes and is currently on private ranch land. There have been two previous studies by the South Dakota School of Mines and Technology and the Oglala Lakota College around 2006 and 2007, but no clean-up activities have been done at the Flat Top Mine.
Uranium, arsenic, vanadium and molybdenum, defined by CERCLA Section 101(14) as hazardous substances, are naturally occurring in the Flint Buttes area. Previous mining activities removed the vegetation and top soil cover in certain areas and left large piles of waste materials and open pits that collect surface water. Many of the waste material piles have been covered with vegetation, but humans, livestock and wild animals are exposed to higher than background levels of these hazardous substances found in water which collects in open pits.
|
2. Current Activities
|
|
2.1 Operations Section
|
|
|
2.1.1 Narrative
Planned removal action includes treating water from the largest mine pit at the Site, returning the treated water to its original use as livestock drinking water and/or pasture irrigation, backfilling and re-vegetating the pit, and drilling wells to replace the livestock water supply.
2.1.2 Response Actions to Date
Water treatment has been posponed due to funding issues but expected to start in third quarter, FY2013.
Two water wells are being drilled to replace livestock water supply. The first well, at approximately 650 feet deep, has been completed It has clean water, with a flow rate of approximately 10 gallons per minute, and livestock tanks. Drilling for the second well is currently at about 460 ft and is expected to be complete before December 31, 2012.
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
2.1.4 Progress Metrics
Waste Stream |
Medium |
Quantity |
Manifest # |
Treatment |
Disposal |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2.2 Planning Section
|
|
|
No information available at this time.
|
|
2.3 Logistics Section
|
|
|
No information available at this time.
|
|
2.4 Finance Section
|
|
|
No information available at this time.
|
|
2.5 Other Command Staff
|
|
|
No information available at this time.
|
3. Participating Entities
|
|
No information available at this time.
|
4. Personnel On Site
|
|
No information available at this time.
|
5. Definition of Terms
|
|
No information available at this time.
|
6. Additional sources of information
|
|
No information available at this time.
|
7. Situational Reference Materials
|
|
No information available at this time.
|
|
|