1. Introduction
|
|
1.1 Background
|
|
|
Site Number: |
|
|
Contract Number: |
|
D.O. Number: |
|
|
Action Memo Date: |
|
Response Authority: |
OPA |
|
Response Type: |
Emergency |
Response Lead: |
EPA |
|
Incident Category: |
Removal Action |
NPL Status: |
|
|
Operable Unit: |
|
Mobilization Date: |
11/21/2011 |
|
Start Date: |
11/21/2011 |
Demob Date: |
11/22/2011 |
|
Completion Date: |
|
CERCLIS ID: |
|
|
RCRIS ID: |
|
ERNS No.: |
|
|
State Notification: |
11/12/2011 |
FPN#: |
E12002 |
|
Reimbursable Account #: |
|
1.1.1 Incident Category
Refer to Initial POLREP.
1.1.2 Site Description
Refer to Initial POLREP.
1.1.2.1 Location
Refer to Initial POLREP.
1.1.2.2 Description of Threat
Refer to POLREP No. 2.
1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
Refer to Initial POLREP.
|
2. Current Activities
|
|
2.1 Operations Section
|
|
|
2.1.1 Narrative
2.1.2 Response Actions to Date
A complete site history and further detailed information regarding this incident can be found in the Initial Cleanup Action & Investigation Work Plan (dated 11/17/11), Revised Initial Cleanup Action & Investigation Report (dated 02/29/12), and the Revised Technical Memorandum (dated 06/28/12).
The initial surface water sampling event occurred on 16 August 2012. The analytical results results and a discussion of the results are presented in the August 2012 Surface Water Monitoring Report dated 25 September 2012.
The second surface water sampling event occurred on 7 January 2013. The analytical results and a discussion of the results are presented in the January 2013 Surface Water Monitoring Report dated 22 February 2013.
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
Refer to Initial POLREP.
2.1.4 Progress Metrics
Waste Stream |
Medium |
Quantity |
Manifest # |
Treatment |
Disposal |
Gasoline |
Soil |
184 cubic yards |
|
Landfarm |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2.2 Planning Section
|
|
|
2.2.1 Anticipated Activities
Refer to the document titled Revised Technical Memorandum (dated 06/28/12) for a discussion of planned activities. The next surface water sampling event will be conducted during low flow conditions within six months, most likely late summer 2013.
2.2.1.1 Planned Response Activities
The need for additional cleanup actions will be based on the strategy presented in the Revised Technical Memorandum.
2.2.1.2 Next Steps
Refer to Sections 2.2.1 and 2.2.1.1.
2.2.2 Issues
The Nez Perce Tribe (NPT) expressed concern regarding the analytical surface water sampling results presented in the January 2013 Surface Water Monitoring Report (02/22/13). Refer to the exchange of emails between Earl Liverman (EPA) and Kevin Brackney (NPT).
|
|
2.3 Logistics Section
|
|
|
N/A
|
|
2.4 Finance Section
|
|
|
No information available at this time.
|
|
2.5 Other Command Staff
|
|
|
2.5.1 Safety Officer
N/A
2.5.2 Liaison Officer
N/A
2.5.3 Information Officer
N/A
|
3. Participating Entities
|
|
3.1 Unified Command
N/A
3.2 Cooperating Agencies
N/A
|
4. Personnel On Site
|
|
N/A
|
5. Definition of Terms
|
|
N/A
|
6. Additional sources of information
|
|
6.1 Internet location of additional information/report
N/A
6.2 Reporting Schedule
The next POLREP will be prepared following the late summer 2013 surface water sampling event.
|
7. Situational Reference Materials
|
|
N/A
|