U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
North Plant MGP - Removal Polrep
Initial Removal Polrep

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region V
|
|
Subject:
|
POLREP #1
Initial
North Plant MGP
O5KT
Waukegan, IL
Latitude: 42.3737150 Longitude: -87.8243880
|
|
To:
|
Jaime Brown, EPA
Raghu Nagam, OTIE
Mark Johnson, ATSDR
Valencia Darby, Department of Interior
Bruce Everetts, Illinois EPA
Lindy Nelson, U.S. DOI
Sam Borries, U.S. EPA
Yolanda Bouchee-Cureton, U.S. EPA
Jason El-Zein, U.S. EPA
Sherry Fielding, U.S. EPA
John Maritote, U.S. EPA
Thomas Marks, U.S. EPA
Mike Ribordy, U.S. EPA
Carol Ropski, U.S. EPA
Andrew Plier, OTIE
Brad Benning, EPA
Fernando Monterey, OTIE
Mindy Clements, U.S. EPA
Mark Durno, U.S. EPA
HQ EOC, U.S. EPA
Charlie Gebien, U.S. EPA
John Glover, U.S. EPA
Shelly Lam, U.S. EPA
Matt Mankowski, U.S. EPA
Ann Whelan, U.S. EPA
Carolyn Bohlen, U.S. EPA
Cecilia Moore, U.S. EPA
Brian Schlieger, U.S. EPA
sharron Jaffess, EPA
Peter Felitti, ORC
|
|
From:
|
Jaime Brown, OSC
|
|
Date:
|
6/14/2013
|
|
Reporting Period:
|
May 6th through June 5th
|
|
1. Introduction
|
|
|
1.1 Background
|
|
|
|
|
Site Number: |
O5KT |
|
Contract Number: |
|
|
D.O. Number: |
|
|
Action Memo Date: |
|
|
Response Authority: |
CERCLA |
|
Response Type: |
PRP Oversight |
|
Response Lead: |
PRP |
|
Incident Category: |
Removal Action |
|
NPL Status: |
Non NPL |
|
Operable Unit: |
|
|
Mobilization Date: |
5/6/2013 |
|
Start Date: |
5/6/2013 |
|
Demob Date: |
|
|
Completion Date: |
|
|
CERCLIS ID: |
ILD984807990 |
|
RCRIS ID: |
|
|
ERNS No.: |
|
|
State Notification: |
|
|
FPN#: |
|
|
Reimbursable Account #: |
|
1.1.1 Incident Category
Manufacturing/processing/maintenance - oil and gas refining
1.1.2 Site Description
The North Plant site is composed of three parcels (parcels 1, 2, and 4). The former MGP was located on parcel 1.
1.1.2.1 Location
The
Site is located on vacant land at 849 Pershing Road, Waukegan, Lake County,
Illinois. The geographical coordinates
for the Site are Latitude 42.3737 north and Longitude -87.8246 west. The
Site is bounded to the north by Dahringer Road, on the west by Pershing Road,
on the east by the Elgin, Joliet & Eastern Railroad, and to the south by
property owned by A.L. Hansen Manufacturing Company. The
Site is located about one-half mile west of Lake Michigan.
1.1.2.2 Description of Threat
Past data indicates the presence of TCLP benzene
concentrations exceeding 0.5 mg/l in addition to concentrations exceeding the
540 mg/kg RML. Depth to groundwater in
the area varies from 2-5 feet below ground surface. Groundwater flows east towards Lake Michigan
and organics contained in the DNAPL may leach into the groundwater and migrate
to Lake Michigan.
1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
Several site investigations have occurred at the
Site since 1990. Analytical results from historical samples in
the proposed removal areas indicate the presence of elevated concentrations of polynuclear
aromatic hydrocarbons (PAH) and VOCs in the DNAPL present in both the surface
and subsurface.
|
|
2. Current Activities
|
|
|
2.1 Operations Section
|
|
|
|
2.1.1 Narrative
On April 8, 2013, EPA executed an Administrative Order by Consent (AOC) under Sections 104, 106(a), 107, and 122 of the Comprehensive Environmental Response, Compensation and Liability Act.
2.1.2 Response Actions to Date
To date, North Shore Gas has notified EPA of its designated contractor and project coordinator. Additionally, North Shore Gas mobilized to the Site and ;
- Implemented site security measures
- Constructed a tracking pad and temporary access roads
- Implemented the applicable portions of the air monitoring
- Initiated excavation and demolition of subsurface foundations/structures
- Disposed of 10,190 tons of soil and debris at Countryside Landfill
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
EPA executed Docket No. V-W-13 C-009, an AOC with North Shore Gas on April 8,2013.
2.1.4 Progress Metrics
|
Milestone
|
Date Due
|
Date Done
|
|
Effective Date (ED)
|
|
4/8/2013
|
|
Contractor Notification
|
4/22/2013
|
4/26/2013
|
|
Project Coordinator Notification
|
4/22/2013
|
4/26/2013
|
|
Site Preparation
|
7/24/2013
|
|
|
Remove subsurface structures
|
7/24/2013
|
|
|
Install erosion controls
|
7/01/2013
|
|
|
ISS work
|
7/24/2013
|
|
|
Site demobilization
|
|
|
|
|
|
2.2 Planning Section
|
|
|
|
2.2.1 Anticipated Activities
The following sections discuss planned response activities and next steps.
2.2.1.1 Planned Response Activities
During the next reporting period North Shore Gas will continue to follow the activities laid out in the Removal Action Work Plan.
2.2.1.2 Next Steps
North Shore Gas will continue excavation of subsurface structures in preparation of ISS activities.
2.2.2 Issues
None
|
|
|
2.3 Logistics Section
|
|
|
|
Not applicable (NA)
|
|
|
2.4 Finance Section
|
|
|
|
No information available at this time.
|
|
|
2.5 Other Command Staff
|
|
|
|
2.5.1 Safety Officer
EPA has approved the HASP approved by North Shore Gas.
2.5.2 Liaison Officer
NA
2.5.3 Information Officer
NA
|
|
3. Participating Entities
|
|
|
3.1 Unified Command
NA
3.2 Cooperating Agencies
IEPA
|
|
4. Personnel On Site
|
|
|
NA
|
|
5. Definition of Terms
|
|
|
No information available at this time.
|
|
6. Additional sources of information
|
|
|
6.1 Internet location of additional information/report
Additional information can be found at www.epaosc.org/northplant.
6.2 Reporting Schedule
The next PolRep will be issued in July 2013.
|
|
7. Situational Reference Materials
|
|
|
NA
|
|
POLREP #1 Last Updated 7/30/2013
|
|
|