North Plant MGP

All POL/SITREP's for this site North Plant MGP
Waukegan, IL - EPA Region V
POLREP #1
Initial
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
North Plant MGP - Removal Polrep
Initial Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region V

Subject: POLREP #1
Initial
North Plant MGP
O5KT
Waukegan, IL
Latitude: 42.3737150 Longitude: -87.8243880


To: Jaime Brown, EPA
Raghu Nagam, OTIE
Mark Johnson, ATSDR
Valencia Darby, Department of Interior
Bruce Everetts, Illinois EPA
Lindy Nelson, U.S. DOI
Sam Borries, U.S. EPA
Yolanda Bouchee-Cureton, U.S. EPA
Jason El-Zein, U.S. EPA
Sherry Fielding, U.S. EPA
John Maritote, U.S. EPA
Thomas Marks, U.S. EPA
Mike Ribordy, U.S. EPA
Carol Ropski, U.S. EPA
Andrew Plier, OTIE
Brad Benning, EPA
Fernando Monterey, OTIE
Mindy Clements, U.S. EPA
Mark Durno, U.S. EPA
HQ EOC, U.S. EPA
Charlie Gebien, U.S. EPA
John Glover, U.S. EPA
Shelly Lam, U.S. EPA
Matt Mankowski, U.S. EPA
Ann Whelan, U.S. EPA
Carolyn Bohlen, U.S. EPA
Cecilia Moore, U.S. EPA
Brian Schlieger, U.S. EPA
sharron Jaffess, EPA
Peter Felitti, ORC

From: Jaime Brown, OSC
Date: 6/14/2013
Reporting Period: May 6th through June 5th

1. Introduction
  1.1 Background
   
Site Number: O5KT    Contract Number:  
D.O. Number:      Action Memo Date:  
Response Authority: CERCLA    Response Type: PRP Oversight
Response Lead: PRP    Incident Category: Removal Action
NPL Status: Non NPL    Operable Unit:
Mobilization Date: 5/6/2013    Start Date: 5/6/2013
Demob Date:      Completion Date:  
CERCLIS ID: ILD984807990    RCRIS ID:
ERNS No.:    State Notification:
FPN#:    Reimbursable Account #:

1.1.1 Incident Category
Manufacturing/processing/maintenance - oil and gas refining

1.1.2 Site Description
The North Plant site is composed of three parcels (parcels 1, 2, and 4). The former MGP was located on parcel 1.

1.1.2.1 Location
The Site is located on vacant land at 849 Pershing Road, Waukegan, Lake County, Illinois.  The geographical coordinates for the Site are Latitude 42.3737 north and Longitude -87.8246 west. The Site is bounded to the north by Dahringer Road, on the west by Pershing Road, on the east by the Elgin, Joliet & Eastern Railroad, and to the south by property owned by A.L. Hansen Manufacturing Company.  The Site is located about one-half mile west of Lake Michigan.

1.1.2.2 Description of Threat
Past data indicates the presence of TCLP benzene concentrations exceeding 0.5 mg/l in addition to concentrations exceeding the 540 mg/kg RML.  Depth to groundwater in the area varies from 2-5 feet below ground surface.  Groundwater flows east towards Lake Michigan and organics contained in the DNAPL may leach into the groundwater and migrate to Lake Michigan.


1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
Several site investigations have occurred at the Site since 1990. Analytical results from historical samples in the proposed removal areas indicate the presence of elevated concentrations of polynuclear aromatic hydrocarbons (PAH) and VOCs in the DNAPL present in both the surface and subsurface.  

2. Current Activities
  2.1 Operations Section
    2.1.1 Narrative
On April 8, 2013, EPA executed an Administrative Order by Consent (AOC) under Sections 104, 106(a), 107, and 122 of the Comprehensive Environmental Response, Compensation and Liability Act. 

2.1.2 Response Actions to Date
To date, North Shore Gas has notified EPA of its designated contractor and project coordinator. Additionally, North Shore Gas mobilized to the Site and ;
  • Implemented site security measures
  • Constructed a tracking pad and temporary access roads
  • Implemented the applicable portions of the air monitoring
  • Initiated excavation and demolition of subsurface foundations/structures
  • Disposed of 10,190 tons of soil and debris at Countryside Landfill
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
EPA executed Docket No. V-W-13 C-009, an AOC with North Shore Gas on April 8,2013.

2.1.4 Progress Metrics

Milestone

Date Due

Date Done

Effective Date (ED)

 

4/8/2013

Contractor Notification

 4/22/2013

4/26/2013

Project Coordinator Notification

 4/22/2013

4/26/2013

Site Preparation

 7/24/2013

Remove subsurface structures

 7/24/2013

 

Install erosion controls 

 7/01/2013

 

ISS work 

 7/24/2013

 

Site demobilization 

 

 



  2.2 Planning Section
    2.2.1 Anticipated Activities
The following sections discuss planned response activities and next steps.

2.2.1.1 Planned Response Activities
During the next reporting period North Shore Gas will continue to follow the activities laid out in the Removal Action Work Plan.

2.2.1.2 Next Steps
North Shore Gas will continue excavation of subsurface structures in preparation of ISS activities.

2.2.2 Issues
None

  2.3 Logistics Section
    Not applicable (NA)

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    2.5.1 Safety Officer
EPA has approved the HASP approved by North Shore Gas.

2.5.2 Liaison Officer
NA

2.5.3 Information Officer
NA

3. Participating Entities
  3.1 Unified Command
NA

3.2 Cooperating Agencies
IEPA

4. Personnel On Site
  NA

5. Definition of Terms
  No information available at this time.

6. Additional sources of information
  6.1 Internet location of additional information/report
Additional information can be found at www.epaosc.org/northplant.

6.2 Reporting Schedule
The next PolRep will be issued in July 2013.

7. Situational Reference Materials
  NA

POLREP #1 Last Updated 7/30/2013