OhioNationalAcme

All POL/SITREP's for this site OhioNationalAcme
Cleveland, OH - EPA Region V
POLREP #2
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
OhioNationalAcme - Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region V

Subject: POLREP #2
OhioNationalAcme
C5L4
Cleveland, OH
Latitude: 41.5523330 Longitude: -81.5941230


To: Shirley Tomasello, Cleveland Department of Law

From: James Augustyn, OSC
Date: 8/8/2013
Reporting Period: 7/26/13 - 8/8/13

1. Introduction
  1.1 Background
   
Site Number: C5L4    Contract Number:  
D.O. Number:      Action Memo Date: 7/8/2013
Response Authority: CERCLA    Response Type: Time-Critical
Response Lead: EPA    Incident Category: Removal Action
NPL Status: Non NPL    Operable Unit:
Mobilization Date: 8/31/2012    Start Date: 8/31/2012
Demob Date:      Completion Date:  
CERCLIS ID:    RCRIS ID:
ERNS No.:    State Notification:
FPN#:    Reimbursable Account #:

1.1.1 Incident Category

Time Critical Removal Action

1.1.2 Site Description


1.1.2.1 Location

The Site is located at 170 E 131st St, Cleveland, Cuyahoga County, OH.  The Site is located in an industrial/commercial/warehouse area in Cleveland, Cuyahoga County, Ohio.  The Site is bordered to the north by Kirby Avenue, Coit Road, and industrial properties; to the east by E 131st Street and industrial properties; to the south by Pull A Part, and to the west by Kirby Avenue and industrial properties.

1.1.2.2 Description of Threat

A tenant filled the Site building with municipal waste.  Upon notification that the municipal waste had to be removed from the building, the tenant and/or the tenant’s contractors began demolishing the building to access and remove the waste.  No demolition permit was granted prior to the start of demolition activities at the Site.  In addition, there is no evidence that asbestos abatement activities were conducted prior to the start of demolition activities at the Site.  On August 17, 2012, the Ohio EPA collected bulk material samples from the demolition debris piles, which indicated asbestos-containing materials (ACM) are present in the debris piles at concentrations up to 65% Chrysotile, 20% Amosite, and 10% Crocidolite.  The main concern is that the ACM is friable and asbestos fibers are being released into the air and possibly migrating off site.  Another concern is that trespassers onto the Site will come into contact with the ACM, disturb the materials, and cause further releases into the air.

1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results

See POLREP #1 for details.

2. Current Activities
  2.1 Operations Section
    2.1.1 Narrative

As a result of the potential for airborne asbestos fibers to migrate off site, the City of Cleveland referred the Site to the U.S. EPA.  The City of Cleveland Commissioner of Air Quality placed a Sealing Order on the Site prohibiting the entry onto the Site or occupancy of the Site by unauthorized persons.  On August 31, 2012, U.S. EPA mobilized its ERRS and START contractors to the Site to conduct emergency response activities, including perimeter air sampling for asbestos and securing the perimeter of the Site from unauthorized entry.

The Responsible Parties failed to comply with numerous Court Orders from the City of Cleveland to address contamination on the property.  EPA issued a Unilateral Order to the PRPs on June 28, 2013.  PRPs failed to respond to the UAO and have not complied with the Order.

2.1.2 Response Actions to Date

On Friday, July 26th, municipal waste was loaded for off site disposal at American Landfill, Waynesburg, OH.  Approximately 308 tons of municipal waste was transported off site.  ERRS crew continues cleaning asbestos TSI off floors within the building.  START identified labels on various containers and tubes of caulk within the building, will obtain MSDS sheets per OSC request.
 
On Monday, July 29th,  ERRS continued to load municipal waste to American Landfill.  Approximately 315 tons was transported off site. ERRS crew continues cleaning asbestos TSI off floors within the building.  Scissor lift arrives on-site.

On Tuesday, July 30th,  ERRS continued to load municipal waste to American Landfill. Approximately 378 tons was transported off site. ERRS crew continues cleaning asbestos TSI off floors within the building. ERRS crews begin removing deteriorated asbestos TSI from overhead piping using scissor lift. Mercury beads were discovered in a room expected to be associated with the facility boiler room.  Area was assessed with a Lumex.

On Wednesday, July 31st, results from bulk samples collected by START documented non-friable asbestos in C&D waste pile. Material will be shipped off-site as C&D with non-friable asbestos.  ERRS continued to load C&D with non-friable asbestos to American Landfill. Approximately 270 tons was transported off site. ERRS crew continues cleaning asbestos TSI off floors within the building.  ERRS crews continued removing detriorated asbestos TSI from overhead piping.

On Thursday, August 1st, ERRS continued to load C&D with non-friable asbestos to American Landfill. Approximately 200 tons was transported off site. ERRS crew continues cleaning asbestos TSI off floors within the building. ERRS crews continued removing asbestos TSI from overhead piping.

On Friday, August 2nd, ERRS continued to load C&D with non-friable asbestos to American Landfill. Approximately 137 tons was transported off site. ERRS crew continues cleaning asbestos TSI off floors within the building. ERRS crews continued removing asbestos TSI from overhead piping. START screened area with mercury beads with Lumex. 

On Monday, August 5th, ERRS crews continued cleaning asbestos TSI off floors within buildings and placing asbestos bags in roll off box for off-site disposal.  ERRS crews continued removing asbestos TSI from overhead piping. Asbestos consultants on site for asbestos survey of building.

On Tuesday, August 6th, ERRS began to demo a collapsed portion of the building along Kirby Rd.  ERRS crews continued cleaning asbestos TSI off floors within buildings and placing asbestos bags in roll off box for off-site disposal. ERRS crews continued removing asbestos TSI from overhead piping. Asbestos consultants on site for asbestos survey of building.  ERRS begins mercury clean up using a mercury vac in a room at south end of building where mercury was discovered.

On Wednesday, August 7th, ERRS demoed the collapsed saw tooth portion of the building sitting on top of municipal waste. ERRS crews continued cleaning asbestos TSI off floors within the building and removing asbestos TSI from overhead piping.  ERRS continued mercury clean up.  Asbestos consultants on site for asbestos survey of building. ERRS continues to consolidate C&D with non-friable asbestos and municipal solid waste with friable asbestos in separate piles.

On Thursday, August 8th, ERRS crews continued cleaning asbestos TSI off floors within the building and removing asbestos TSI from overhead piping. ERRS continued mercury clean up.  Asbestos consultants finished asbestos survey. ERRS loaded scrap metal boxes for off-site disposal.  ERRS continues to consolidate C&D with non-friable asbestos and municipal solid waste with friable asbestos in separate piles.   

START continues to conduct daily air sampling on site.

2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)

The property owner on record is Acme Reality, LLC.  EPA issued a UAO to PRPs on June 28, 2013.  No RP has responded to, or complied with, the UAO.
 
2.1.4 Progress Metrics

As of July 30, 2013, approximately 2,606 tons of municipal waste shipped off site

As of August 2, 2013, approximately 607 tons of C&D with non-friable asbestos shipped off site

As of August 8, 2013, 1, 20 cu. yd. roll-off dumpster with asbestos TSI bags shipped off site

As of August 8, 2013, 32.53 tons of scrap steel recycled.  Recycle value of $7,925.87 retuned to the Site removal account.
Load # Date  Waste Manifest # Trans Type Load Tons
63 7/25/13 Municipal 1947009 Trash hauler 21.54 
64 7/25/13  

Municipal

1947010 Trash hauler 21.99 
65 7/25/13  

Municipal

1947011 Trash hauler 21.84 
66 7/25/13  

Municipal

1947012 Trash hauler 19.77 
67 7/25/13  

Municipal

1947013 Trash hauler 25.68 
68 7/25/13  

Municipal

1947014 Trash hauler 23.20 
69 7/25/13  

Municipal

1947015 Trash hauler 21.09 
70 7/25/13  

Municipal

1947016 Trash hauler 21.54 
71 7/25/13  

Municipal

1947017 Trash hauler 19.77 
72 7/25/13  

Municipal

1947018 Trash hauler 20.61 
73 7/25/13  

Municipal

1947019 Trash hauler 21.32 
74 7/25/13  

Municipal

1947020 Trash hauler 23.45 
75 7/25/13  

Municipal

1947021 Trash hauler 25.12 
76 7/25/13  

Municipal

1947022 Trash hauler 21.06 
77 7/25/13  

Municipal

1947023 Trash hauler 17.03 
78 7/25/13  

Municipal

1947024 Trash hauler 21.93 
79 7/25/13  

Municipal

1947025 Trash hauler 20.29
80 7/26/13  

Municipal

1947026 Trash hauler 22.50
81 7/26/13  

Municipal

1947027 Trash hauler 20.91
82 7/26/13  

Municipal

1947028 Trash hauler 22.25
83 7/26/13  

Municipal

1947029 Trash hauler VOID 
84 7/26/13  

Municipal

1947030 Trash hauler VOID 
85 7/26/13  

Municipal

1947031 Trash hauler VOID 
86 7/26/13  

Municipal

1947032 Trash hauler 22.36
87 7/26/13  

Municipal

1947033 Trash hauler 20.92
88 7/26/13  

Municipal

1947034 Trash hauler 22.85
89 7/26/13  

Municipal

1947035 Trash hauler 22.07
90 7/26/13  

Municipal

1947036 Trash hauler 21.85
91 7/26/13  

Municipal

1947037 Trash hauler 23.22
92 7/26/13  

Municipal

1947038 Trash hauler VOID 
93 7/26/13  

Municipal

1947039 Trash hauler 22.33
94 7/26/13  

Municipal

1947040 Trash hauler 22.77
95 7/26/13  

Municipal

1947041 Trash hauler 19.09 
96 7/26/13 Municipal 1947042 Trash
hauler
22.27
97 7/26/13 Municipal  1947043 Trash
hauler
22.03
98 7/29/13  

Municipal

1947044 Trash hauler 22.18
99 7/29/13  

Municipal

1947045 Trash hauler 24.03
100 7/29/13  

Municipal

1947046 Trash hauler 22.57
101 7/29/13  

Municipal

1947047 Trash hauler 22.10
102 7/29/13  

Municipal

1947048 Trash hauler 21.73
103 7/29/13  

Municipal

1947049 Trash hauler 21.47
104 7/29/13  

Municipal

1947050 Trash hauler 22.34
105 7/29/13  

Municipal

1947051 Trash hauler 23.09
106 7/29/13  

Municipal

1947052 Trash hauler 21.69 
107 7/29/13  

Municipal

1947053 Trash hauler 22.43
108 7/29/13  

Municipal

1947054 Trash hauler 21.15 
109 7/29/13  

Municipal

1947055 Trash hauler 22.42 
110 7/29/13  

Municipal

1947056 Trash hauler 25.56 
111 7/29/13  

Municipal

1947057 Trash hauler 21.63 
112 7/30/13  

Municipal

1947058 Trash hauler 29.64 
113 7/30/13  

Municipal

1947059 Trash hauler 21.53 
114 7/30/13  

Municipal

1947060 Trash hauler 23.52
115 7/30/13  

Municipal

1947061 Trash hauler 23.93 
116 7/30/13  

Municipal

1947062 Trash hauler 25.81
117 7/30/13  

Municipal

1947063 Trash hauler 22.72
118 7/30/13  

Municipal

1947064 Trash hauler 26.76
119 7/30/13  

Municipal

1947065 Trash hauler 20.75 
120 7/30/13  

Municipal

1947066 Trash hauler 21.97
121 7/30/13  

Municipal

1947067 Trash hauler 20.33
122 7/30/13  

Municipal

1947068 Trash hauler 17.11 
123 7/30/13  

Municipal

1947069 Trash hauler 19.50 
124 7/30/13  

Municipal

1947070 Trash hauler 14.90 

125
7/30/13 Municipal  1947071 Trash
hauler 
19.84

126
7/30/13 Municipal 1947072 Trash
hauler
17.91

127
7/30/13 Municipal 1947073 Trash
hauler
16.63

128
7/30/13 Municipal 1947074 Trash
hauler
18.87

129
7/30/13 Municipal 1947075 Trash
hauler
16.11

130
 
7/31/13 C&D with non-friable asbestos 208404  Trash
hauler
11.01

131
 
7/31/13  C&D with non-friable asbestos  208405 Trash
hauler
14.68 

132
 
7/31/13 C&D with non-friable asbestos 208406  Trash
hauler 
13.21

133
 
7/31/13 C&D with non-friable asbestos 208407  Trash
hauler 
13.29

134
 
7/31/13 C&D with non-friable asbestos 208408  Trash
hauler 
14.46 

135
 
7/31/13 C&D with non-friable asbestos 208409  Trash
hauler 
18.00 

136
 
7/31/13 C&D with non-friable asbestos 208410  Trash
hauler 
16.21

137
 
7/31/13 C&D with non-friable asbestos 208411  Trash
hauler 
14.08

138
 
7/31/13 C&D with non-friable asbestos 208412  Trash
hauler 
18.89

139
 
7/31/13 C&D with non-friable asbestos 208413  Trash
hauler 
20.48

140
 
7/31/13 C&D with non-friable asbestos 208414  Trash
hauler 
22.93 

141
 
7/31/13 C&D with non-friable asbestos 208415  Trash
hauler 
29.27

142
 
7/31/13 C&D with non-friable asbestos 208416  Trash
hauler 
29.45 

143
 
7/31/13 C&D with non-friable asbestos 208417  Trash
hauler 
14.29

144
 
7/31/13 C&D with non-friable asbestos 208418  Trash
hauler 
19.49
 
145
8/1/13  C&D with non-friable asbestos 208419   Trash
hauler 
13.96

146
 
8/1/13  C&D with non-friable asbestos  208420   Trash
hauler 
14.63

147
 
8/1/13  C&D with non-friable asbestos  208421   Trash
hauler 
15.41

148
 
8/1/13  C&D with non-friable asbestos 208422   Trash
hauler 
16.14

149
 
8/1/13  C&D with non-friable asbestos 208423   Trash
hauler 
15.83

150
 
8/1/13  C&D with non-friable asbestos 208424   Trash
hauler 
15.23

151
 
8/1/13  C&D with non-friable asbestos 208425   Trash
hauler 
13.13

152
 
8/1/13  C&D with non-friable asbestos  208426   Trash
hauler 
15.49

153
 
8/1/13  C&D with non-friable asbestos  208427   Trash
hauler 
15.03

154
 
8/1/13  C&D with non-friable asbestos  208428   Trash
hauler 
15.32

155
 
8/1/13  C&D with non-friable asbestos 208429   Trash
hauler 
16.18

156
 
8/1/13  C&D with non-friable asbestos 208430   Trash
hauler 
16.94

157
 
8/1/13  C&D with non-friable asbestos  208431   Trash
hauler 
16.13

158
 
8/2/13  C&D with non-friable asbestos 208432   Trash
hauler 
20.01

159
 
8/2/13  C&D with non-friable asbestos 208433   Trash
hauler 
16.77

160
 
8/2/13  C&D with non-friable asbestos  208434   Trash
hauler  
16.29

161
 
8/2/13  C&D with non-friable asbestos 208435   Trash
hauler  
15.56

162
 
8/2/13  C&D with non-friable asbestos 208436   Trash
hauler  
14.31 

163
 
8/2/13  C&D with non-friable asbestos 208437   Trash
hauler  
19.02

164
 
8/2/13  C&D with non-friable asbestos  208438   Trash
hauler  
15.53 

165
 
8/2/13  C&D with non-friable asbestos  208439   Trash
hauler  
19.95
 
166
8/6/13 Bagged friable asbestos TSI 1001 Roll off box 1 - 20 cubic yards



  2.2 Planning Section
    2.2.1 Anticipated Activities

Completed shipping C&D with non-friable asbestos off site to clear space to stage waste from inside the building.  Waste will need to be moved from inside the building and restaged outside in order to abate deteriorated TSI on pipes exposed to the elements.

2.2.1.1 Planned Response Activities

Begin shipping asbestos contaminated municipal waste from inside the building for off site disposal.

Demobe demo equipment from site.

2.2.1.2 Next Steps

Anticipate completing all site activities by August 30, 2013.

2.2.2 Issues

None. 

  2.3 Logistics Section
    No information available at this time.

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    No information available at this time.

3. Participating Entities
  3.1 Unified Command

3.2 Cooperating Agencies

City of Cleveland

4. Personnel On Site
 
1- U.S. EPA OSC

1- START

12- ERRS


5. Definition of Terms
  No information available at this time.

6. Additional sources of information
  6.1 Internet location of additional information/report

6.2 Reporting Schedule

TBD

7. Situational Reference Materials
  No information available at this time.


Click here to view Attached Images