Two Rivers Manufactured Gas Plant (MGP) Site

All POL/SITREP's for this site Two Rivers Manufactured Gas Plant (MGP) Site
Two Rivers, WI - EPA Region V
POLREP #1
Initial
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Two Rivers Manufactured Gas Plant (MGP) Site - Removal Polrep
Initial Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region V

Subject: POLREP #1
Initial
Two Rivers Manufactured Gas Plant (MGP) Site
B5BU
Two Rivers, WI
Latitude: 44.1526653 Longitude: -87.5653165


To: Naren Prasad, Integrys Business Support
Thomas Wentland, WDNR

From: Bradley Benning, OSC
Date: 8/22/2014
Reporting Period: 8/18/2014 to 8/22/2014

1. Introduction
  1.1 Background
   
Site Number: B5BU    Contract Number:  
D.O. Number:      Action Memo Date: 7/28/2014
Response Authority: CERCLA    Response Type: PRP Oversight
Response Lead: PRP    Incident Category: Removal Action
NPL Status: Non NPL    Operable Unit:
Mobilization Date: 8/18/2014    Start Date: 8/18/2014
Demob Date:      Completion Date:  
CERCLIS ID: WIN000509953    RCRIS ID:
ERNS No.:    State Notification:
FPN#:    Reimbursable Account #:

1.1.1 Incident Category

The WPSC Two Rivers MGP Site is being addressed through potentially responsible party (PRP) actions under state and federal oversight.  This Time-critical Removal Action will assist in achieving long-term cleanup goals by mitigating MGP source materials on-site through excavation and off-site disposal and on-site stabilization.

1.1.2 Site Description

The WPSC Two Rivers MGP Site located at 200 21st Street, encompasses approximately 4-acres.  Features include historic concrete building foundations.  A chain link fence secures the Site perimeter.  A wetland exists in the center and western portion of the property (approximately 2 acres).  Large portions of the Site east of the wetland are covered in crushed stone and asphalt.  The vegetation in the wetland consists of a fringe scrub-shrub on the eastern edge of the wetland dominated by aspen and dogwood.  Emergent and wet meadow species such as green bulrush and horsetail are located closer to the bank of the West Twin River.

 The Site has elevations ranging from approximately 579 feet (MSL) to 584 feet MSL.  Surface water drainage flows overland to the West Twin River.  The majority of the Site is within the 100-year flood zone as mapped by Federal Emergency Management Agency (FEMA, 2011).



1.1.2.1 Location

The approximately 4-acre Site is located on vacant land between 22nd Street and School Street in Two Rivers, Manitowoc County, Wisconsin.  

 

·         2022 School Street to the south, owned by Manitowoc County

·         School Street right-of-way and the following private properties to the east:

o   2100 School Street

o   2104 School Street

o   2110 School Street

o   1913 22nd Street

·         1926 22nd Street to the north, owned by the US Oil Company, Inc.

The West Twin River to the west

1.1.2.2 Description of Threat

The high levels of hazardous substances in surface and sub-surface soil at concentrations that exceed U.S. Environmental Protection Agency Removal Management Levels (RMLs) and the Wisconsin Department of Natural Resources (WDNR) Removal Action Levels (RALs), the Site’s plans for future construction, the potential of exposure to children trespassers and the industrial/commercial use of nearby property requires that this action be classified as a time-critical removal.  Analytical results from historical samples in the proposed removal areas indicate the presence of elevated concentrations of polynuclear aromatic hydrocarbons (PAHs) and volatile organic compounds (VOCs) in the DNAPL present in both the surface and subsurface.  In particular, this past data indicates the presence of TCLP benzene concentrations exceeding 0.5 mg/l in addition to concentrations exceeding the 340 mg/kg RML.  Depth to groundwater in the area varies from 2-5 feet below ground surface.  Groundwater flows east toward Lake Michigan and organics contained in the DNAPL, may leach into the groundwater and migrate to Lake Michigan. 

1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results

Previous actions at the Site include a 1986 Phase 1 Investigation performed by EDI Engineering and Science, Inc. and the 1994 Phase II Investigation performed by NRT.  NRT performed the Phase II Addendum Investigation in 1996, a Pre-Remedial Design Site Investigation in 2003, and annual Groundwater Quality Data Transmittals from 2005 through 2013.

Contaminants such as VOCs, specifically benzene, toluene, ethylbenzene, and xylene ('BTEX"), PAHs, metals, and cyanide were detected in sediment, soil and groundwater samples collected in various locations at the WPSC Two Rivers MGP Site as summarized by Natural Resource Technology Inc. ('NRT"), on behalf of WPSC, in the 1994 Phase II Investigation and 1996 Phase II Addendum Investigation.  Concentrations ranges are as follows:  BETX detected above Wisconsin Action Concentrations ("WAC") NR 720 Residual Contaminant Levels values; total PAHs at surface and subsurface ranging from 0-616 ppm; groundwater samples with BETX, cyanide, cadmium, lead detected in some instances above WAC NR 140 Enforcement Standards.

NRT conducted a pre-remedial design investigation during development of a Remedial Action Options Report in 2003 (NRT, 2003), the RAOR is included as Appendix A. Soil samples collected in August 2003 from test pits in the vicinity of the former MGP structures were generally unsaturated to moist and contained large amounts of fill material (ash/cinders, wood, brick, etc.). Soil samples collected from test pits and soil borings west of the former MGP structures were generally saturated and represent the intervals exhibiting potential MGP impacts based on visual and/or olfactory observations or elevated PID measurements. Emulsified coal tar was observed in soil borings and test pits generally located within and to the west of the wetland area. Beneath a majority of the Site, a clay layer was present between 4 and 7 feet bgs and extends to the bottom of the piezometer borings (25 to 30 feet bgs).

Analytical results of soil sampling indicated the following contaminant distribution trends:

■        Off‑property soils to the north were not impacted by benzene and naphthalene.

■        Analytical results of off‑property soils to the south indicated benzene and naphthalene concentrations above the generic groundwater pathway NR720 RCLs, in effect at the time.

Site soils are generally above the NR720 standards for benzene and naphthalene at low levels across the Site. Concentrations are significantly higher at select locations where coal tar was observed to occur within the soil matrix. 
 

 

2. Current Activities
  2.1 Operations Section
    2.1.1 Narrative

The PRP shall implement the EPA approved Removal Action Work Plan for WPSC Site, dated February 24, 2014.  The main components of the work plan include the following provisions which require compliance:

 

a)  Preliminary activities such as site security and controls.

b)  Site preparation, including clearing and grubbing.

c)  Targeted excavation within defined removal areas A, B and C.

d)  Transportation and off-site disposal of excavated material from areas A, B and C.

e)  In-Situ Solidification/Stabilization construction and operations in area B and C.  ISS

      solidified material will remain on-site until future land use requires removal

       and disposal.

f)  Backfilling with excess swell material and/or clean fill.

g)  Compliance with State and Local requirements.

h)  Construction Quality Assurance Measures such as

            -  Air Monitoring

            -  Fugitive Emission Management Plan

            -  Health and Safety Plan

            -  Sampling and Analysis Plan

            -  ISS Construction Quality Assurance Plan

i)  Schedule for Completion.

j)  Submission of Weekly and Final Reports.

k)  Take any other response actions to address any release or threatened release of a

      hazardous substance, pollutant or contaminant that the EPA OSC determines

      may pose an imminent and substantial endangerment to public health or the

      environment.



2.1.2 Response Actions to Date

The following site preparation activites have been initiated this week.

-Geo Solutions Inc. (GSI), has given a Health and Safety overview to work crew.
-NRT began real-time air monitoring and 24-hour air sampling with Summa and Pufs.
-NRT collected pre-construction soil samples in the support areas.  These samples were sent to Pace Laboratory for a 14-day turnaround time.
-Stone for the trailers, batch plant pad, water treatment pad, and roads have been imported,placed, and compacted on site. GSI has installed orange safety fence around sensitive objects on the site (i.e. electrical transformers). A protective green fence has been installed from School Street along the driveway off of 21st Street to the site entrance gate. Trailers for GSI and NRT have arrived and are set up. Electrical work has been completed both for the trailers and the air monitoring stations.
-GSI has put together a three week schedule (attached) which plans for peat excavation beginning the first week of September (9/1) and then disposal likely to begin the second week of September (9/8).
-Erosion controls will be installed the week of August 18
-NRT began background air monitoring and sampling on Wednesday. This background sampling will be completed in time for the pilot test to begin in the first week of September.

2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)


An Administrative Settlement Agreement and Order on Consent ("Settlement Agreement") was entered into voluntarily by USEP and the Wisconsin Public Service Corporation ("WPSC") on July 28, 2014.

2.1.4 Progress Metrics


Waste Stream Medium Quantity Manifest # Treatment Disposal
           
           
           


  2.2 Planning Section
    2.2.1 Anticipated Activities

Continue Site preparation work and maintain air monitoring activities.

2.2.1.1 Planned Response Activities

-Delivery of ISS equipmet
-Begin batch plant assembly
-Place sandbag berm around perimeter of site and edge of river
-Complete installation of Silt curtain and Silt fence
-Build water treatment pad
-Finish mobing miscellaneous equipment to site

2.2.1.2 Next Steps

-Conduct ISS plant shakedown
-Conduct ISS pilot cores to determine best reagent blend
-Arrange disposal profiles
-Finalize HASP
-Begin excavation of peat for off-site disposal

2.2.2 Issues

None at this time

  2.3 Logistics Section
    WPSC as PRP is in charge of all logistics.

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    2.5.1 Safety Officer

Aaron Handle will be the GSI Safety Officer,  EPA will have overall Safety control.

2.5.2 Liaison Officer

Ken Mika (NRT) Project Manager

2.5.3 Information Officer

Dayna Watson (WPSC)

3. Participating Entities
  3.1 Unified Command

EPA
WDNR
WPSC


3.2 Cooperating Agencies

City of Two Rivers
Manitowac County
Wisconsin Department of Helath

4. Personnel On Site
  EPA - 0
WDNR - 0
OTIE - 0
GSI - 5
NRT - 3

5. Definition of Terms
  FOSC - Federal On Scene Coordinator
HASP - Health and Safety Plan
mg/kg - milligrams per kilogram
mg/m3 - milligrams per cubic meter
WDNR - Wisconsin Department of Natural Resources
NPL - National Priorities List
ppm - parts per million
START - Superfund Technical Assessment and Response Team
U.S. EPA - United States Environmental Protection Agency
WPSC - Wisconsin Public Service Corporation
NRT - Natural Resource Technology Inc.

6. Additional sources of information
  6.1 Internet location of additional information/report

www.epaosc.org/TwoRiversMGP


6.2 Reporting Schedule

Monthly Poleps anticipated

7. Situational Reference Materials
  No information available at this time.