U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Buffum MKE

All POL/SITREP's for this site Buffum MKE
Milwaukee, WI - EPA Region V
POLREP #4
Final
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Buffum MKE - Removal Polrep
Final Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region V

Subject: POLREP #4
Final
Buffum MKE
C5Y4
Milwaukee, WI
Latitude: 43.0813980 Longitude: -87.9059090


To: Karen Dettmer, RACM
Lindor Schmidt, MHD
Ryan Wozniak, WDHS
Mark Drews, WDNR

From: Kathy Halbur, OSC

Date: 5/18/2015
Reporting Period: 3/25/2015-5/15/2015

1. Introduction
  1.1 Background
   
Site Number: C5Y4    Contract Number: EP-S5-08-02
D.O. Number: 141    Action Memo Date: 5/14/2014
Response Authority: CERCLA    Response Type: Time-Critical
Response Lead: EPA    Incident Category: Removal Action
NPL Status: Non NPL    Operable Unit:
Mobilization Date: 6/10/2014    Start Date: 6/11/2014
Demob Date: 5/14/2015    Completion Date: 5/15/2015
CERCLIS ID: WIN000503606    RCRIS ID:
ERNS No.:    State Notification: WDNR
FPN#:    Reimbursable Account #:

1.1.1 Incident Category
Time Critical Removal Action

1.1.2 Site Description
The Buffum MKE Site is an abandoned industrial building on a small lot in a mixed residential, commercial, and industrial area. The 3-story portion of the building was constructed in the early 1900's; a 1-story addition was built in the 1950s.  Many different businesses operated at the Site over the past 100 years, including numerous scrapping, woodworking, fiberglass, and transmission operations. The last business to operate at the Site closed in 2008, and the property subsequently became tax delinquent and fell into disrepair.  The Site has a long history of spills and complaints from the neighbors.

1.1.2.1 Location
The Site is located at 3456 North Buffum Street, Milwaukee, Milwaukee County, Wisconsin. Residential properties are located to the north and east, the Beerline recreational trail is located to the south, and an operating business is located across the street to the west. Across the Beerline Trail are more residential properties.

1.1.2.2 Description of Threat
See Initial POLREP for threat description.

1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
See Initial POLREP for pre-removal assessment information.

2. Current Activities
  2.1 Operations Section
    2.1.1 Narrative
This time critical removal action included collection, removal, and disposal of all solid and liquid wastes abandoned in the Site building that could be safely accessed. In addition, surfaces containing hazardous ash and dust were cleaned. Building materials (i.e., peeling lead and PCB paint, friable asbestos, mercury switches) that posed a health and/or migration risk and could be safely accessed were removed and sent for proper disposal.  Unsafe building conditions prohibited the removal of all the hazardous waste during EPA's initial mobilization (6/10/14-8/15/14).  EPA remobilized to the Site (4/15/15-5/14/15) after the building was demolished to complete this removal action. 

2.1.2 Response Actions to Date
See previous POLREPS for activities that occurred during the first mobilization.

The property owner did not respond to or comply with the City's Raze Orders (dated August 6, 2014 and August 25, 2014).  The City of Milwaukee, with financial assistance from the Wisconsin Economic Development Corporation (WEDC), hired Veit to demolish the building. Demolition work began on March 25, 2015 and was completed on April 14, 2015. EPA coordinated with Veit on the containerization of hazardous ash from the remaining incinerator in the one story portion of the building on March 26, 2015. Veit left the floor drains, sumps, and slab in place in the areas where contamination was previously identified and/or suspected.  

EPA remobilized to the Site on April 15, 2015 to finish disconnecting the property from the sewers and remove the sludge and hazardous solids remaining in the sumps, floor drains, and trenches beneath the one story portion of the building.  Characterization sampling of this waste stream during the initial mobilization indicated TCLP lead concentrations greater than 50 ppm and PCB concentrations greater than 600 ppm.  The excavated soil was treated with a lead stabilizing agent, re-analyzed for compliance with the waste profile, then shipped to EQ for disposal.  

During excavation, a large buried underground storage tank was discovered.  The tank is believed to have been out of service since at least 1955.  Sludge in the tank had elevated lead levels, similar to the sludge in the trenches under the tank's piping system. EPA removed the tank to stop further releases. Due to the size of the tank, EPA could not excavate under the tank and was not able to collect samples from the area around the tank. 

EPA worked with the City of Milwaukee to backfill, restore, and secure the Site.  Backfill was brought to the Site from the Emerald Park Landfill and Marquette Interchange project (previously stockpiled at the Menomonee Valley Industrial Center). The perimeter fencing will remain in place until the grass is established.   

2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
The owner of the building is tax delinquent, out-of-state, and unable to care for the building. A signed Consent for Access To Property and a declaration of inability to conduct the cleanup was submitted by the Site owner to EPA on February 26, 2014. There are no known viable previous operators.

2.1.4 Progress Metrics

Waste Stream Medium Quantity Manifest # Disposal
Non-Haz Debris & RCRA Empty Containers solid 350 tons NA Orchard Ridge Landfill, Menomonee Falls, WI 
Scrap metal solid 30 tons NA Auto & Scrap Recyclers, Milwaukee, WI
Oxygen cylinder  gas (2) 4' cylinders NA AirGas
Oxygen cylinder gas  2' cylinder NA Apria Health
Propane cylinder gas (3) 4' cylinders NA Auto & Scrap Recyclers,
Milwaukee, WI
Nitrogen cylinder gas (2) 3' cylinders NA Liquide Air
Mercury switches liquid/solid  0.50 pound NA WM Mercury Solutions,  Union Grove, WI
Refrigerators (Freon) solid 2 NA Refrigerant Recovery, Inc
Milwaukee, WI
Batteries solid 295 pounds NA Auto & Scrap Recyclers
Milwaukee, WI
Friable asbestos solid 16 cu yd BM002 Orchard Ridge Landfill
Menomonee Falls, WI
Hazardous Solids (PCBs) solid 560 tons
001813108 JJK
013402947 JJK
010283889 JJK
014483501 JJK
014483502 JJK
014483503 JJK
014483504 JJK
014483505 JJK
014483506 JJK
014483507 JJK
014483508 JJK
014483509 JJK
014483510 JJK
014491010 JJK
014491011 JJK
014491017 JJK
014491003 JJK
014491004 JJK
014491005 JJK
014491006 JJK
014491007 JJK
014491008 JJK
014491009 JJK
014491010 JJK
014491011 JJK
014491012 JJK
014491013 JJK
014491014 JJK
014491015 JJK
014491016 JJK
EQ/Wayne Disposal
Belleville, MI
Aerosols solid/gas 30 gallon overpack drum
00085009 VES
Veolia ES Technical Solutions
Menomonee Falls, WI 
Oil Based Paint
(Flammable Liquids)
liquid (2) 55 gallon drums  
00085009 VES
Veolia ES Technical Solutions
Menomonee Falls, WI
Acid Liquids liquid  5 gallons 
00085009 VES
Veolia ES Technical Solutions
Menomonee Falls, WI
PCB Ballasts solid/liquid  (2) 55 gallon overpack drums  000895389VES Veolia ES Technical Solutions
Phoenix, AZ
Non-PCB Transformers solid/liquid 43 transformers 180317 Veolia ES Technical Solutions
Port Washington, WI
Fluorescent bulbs solid 247 bulbs 180317  Veolia ES Technical Solutions
Port Washington, WI
Waste Oil (PCBs) liquid (9) 55 gallon drums
(1) 85 gallon overpack
ZZ 00429924
Veolia ES Technical Solutions
Menomonee Falls, WI
Waste Oil/Sludge (Lead) solid/liquid 1,400 gallons BSM001
BSM002
BSM003
Orchard Ridge Landfill, Menomonee Falls, WI



  2.2 Planning Section
    2.2.1 Anticipated Activities
The City of Milwaukee has assumed responsibility for Post Removal Site Controls. RACM is evaluating foreclosure.  Additional assessment of the Site will be needed prior to redevelopment.  Contamination that was beyond the scope of this removal action remains at the Site.  The community would like to utilize the Site as a support parcel to the neighboring Beerline Trail while additional assessment and redevelopment plans are being pursued.

2.2.1.1 Planned Response Activities
EPA's removal action is complete.

2.2.2 Issues
Significant rainfall throughout the second mobilization delayed work and created numerous issues (e.g., stormwater management, tracking onto roadways, etc). 

On May 2, 2015, the Site was broken into during the overnight hours.  EPA's contracted security guard reported the break-in to 911. Milwaukee Police apprehended a suspect.  Equipment was stolen from the ERRS equipment trailer and the driver's side window of the EPA Sprinter was broken during the incident.

  2.3 Logistics Section
    EPA and ERRS personnel and equipment have demobolized from the Site. 
The Site is secured with a locked perimeter fence. 

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    2.5.1 Safety Officer
There were no safety issues during this reporting period.

2.5.2 Liaison Officer
On April 29, 2015, representatives from the RACM, WDNR, and Riverworks met with EPA to discuss site restoration and post removal site controls. 

EPA coordinated closely with MDNS and RACM throughout the building demolition and second mobilization.  RACM also secured assistance from WEDC and MDPW.

2.5.3 Information Officer
The City of Milwaukee and the demolition contractor notified the neighborhood of the demolition activities via a mailing and door-to-door flyers.  A copy of the notice is available at www.epaosc.org/buffummke in the documents section.

Sue Pastor is the EPA CIC for this Site.

3. Participating Entities
  3.1 Unified Command
N/A

3.2 Cooperating Agencies
City of Milwaukee
    Redevelopment Authority
    Department of Health
    Fire Department
    Department of Neighborhood Services
    Office of Emergency Management and Homeland Security
    Department of Public Works
    Police Department
State of Wisconsin
    Department of Natural Resources
    Department of Health Services
    54th Civil Support Team
Riverworks Development Corporation
We Energies

4. Personnel On Site
  U.S. EPA - 2 (OSCs Halbur and Maguire coordinated oversight during this reporting period)
ERRS (EQM, Inc) - 4 (RM, EO & Laborer; FCA part-time)
START (TetraTech, Inc) - 1
Security Officer Services, Inc - 1


5. Definition of Terms
  CFR - Code of Federal Regulations
CIC - Community Involvement Coordinator
CST - Civil Support Team
EO - Equipment Operator
EPA - Environmental Protection Agency
ERRS - Emergency & Rapid Response Services
FCA - Field Cost Accountant
HASP - Health and Safety Plan
MDNS - Milwaukee Department of Neighborhood Services
MDPW - Milwaukee Department of Public Works
MFD - Milwaukee Fire Department
mg/kg - milligrams per kilogram
MHD - Milwaukee Health Department
MFD - Milwaukee Fire Department
MOEMHS - Milwaukee Office of Emergency Management and Homeland Security
MPD - Milwaukee Police Department
NR - Natural Resources
OSC - On scene coordinator
PCBs -Poly-Chlorinated Biphenyls
ppb - parts per billion
ppm - parts per million
RACM - Redevelopment Authority of the City of Milwaukee
RCL - Residual Contaminant Level
RML - Removal Management Level
RM - Response Manager
START - Superfund Technical Assessment & Response Team
SVOCs - Semi-Volatile Organic Compounds
TDD - Technical Direction Document
VOCs - Volatile Organic Compounds
WDHS - Wisconsin Department of Health Services
WDNR - Wisconsin Department of Natural Resources
WEDC - Wisconsin Economic Development Corporation

6. Additional sources of information
  6.1 Internet location of additional information/report

http://www.epa.gov/Region5/cleanup/buffum/index.html

http://www.epaosc.org/BuffumMKE

6.2 Reporting Schedule
This is the final POLREP.

7. Situational Reference Materials
 
Regional Metrics
This is an Integrated River Assessment. The numbers should overlap. Miles of river systems cleaned and/or restored 0
Cubic yards of contaminated sediments removed and/or capped 0
Gallons of oil/water recovered 14,500
Acres of soil/sediment cleaned up in floodplains and riverbanks 0
Stand Alone Assessment Number of contaminated residential yards cleaned up 0
Number of workers on site 6
Contaminant(s) of Concern waste oil (PCBs & lead)
Oil Response Tracking
Estimated volume Initial amount released NA
Final amount collected NA
CANAPS Info FPN Ceiling Amount NA 
FPN Number NA
Body of Water affected NA; stopped potential release to MKE sewer system
Administrative and Logistical Factors (Place X where applicable)
  Precedent-Setting HQ Consultations (e.g., fracking, asbestos)  X Community challenges or high involvement   Radiological
  More than one PRP   Endangered Species Act / Essential Fish Habitat issues   Explosives
  AOC  X Historic preservation issues   Residential impacts
  UAO   NPL site   Relocation
  DOJ involved   Remote location   Drinking water impacted
Criminal Investigation Division involved X Extreme weather or abnormal field season  X Environmental justice
  Tribal consultation or coordination or other issues   Congressional involvement   High media interest
  Statutory Exemption for $2 Million   Statutory Exemption for 1 Year   Active fire present
Hazmat Entry Conducted – Level A, B or C   Incident or Unified Command established   Actual air release (not threatened)
           
Green Metrics
  Metric   Amount   Units
  Diesel Fuel Used   630 gallons gallons
  Unleaded Fuel Used   290 gallons gallons
  Alternative/E-85 Fuel Used   100 gallons gallons
  Electricity from Coal   Power from grid mix kW
  Electricity from solar/wind   Power from grid mix kW
  Electricity from grid/mix   1200 kWh kW
  Solid waste disposed   350 Tons Tons
  Solid waste recycled   10 Tons Tons
   Water used   750 gallons Gallons