U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Waunakee Alloy

All POL/SITREP's for this site Waunakee Alloy
Waunakee, WI - EPA Region V
POLREP #4
Progress
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Waunakee Alloy - Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region V

Subject: POLREP #4
Progress
Waunakee Alloy
C56H
Waunakee, WI
Latitude: 43.1941564 Longitude: -89.4503010


To:
From: Andrew Maguire, On-Scene Coordinator
Date: 8/24/2015
Reporting Period: 8/17/15 - 8/21/15

1. Introduction
  1.1 Background
   
Site Number: C56H    Contract Number: EP-S5-08-02
D.O. Number:      Action Memo Date:  
Response Authority: CERCLA    Response Type: Time-Critical
Response Lead: EPA    Incident Category: Removal Action
NPL Status: Non NPL    Operable Unit:
Mobilization Date: 7/27/2015    Start Date: 7/28/2015
Demob Date:      Completion Date:  
CERCLIS ID:    RCRIS ID:
ERNS No.:    State Notification:
FPN#:    Reimbursable Account #:

1.1.1 Incident Category

CERCLA incident category: Inactive production facility

1.1.2 Site Description

The Site is the former location of the Waunakee Alloy Castings Corporation which ceased operations in 2009. The Site contains one large main building where casting operations occurred and five smaller surrounding outbuildings that contain molds and other artifacts that were needed in the facility's processes when it was still in operation. A small office building is located hi the southwest corner of the Site. There are various hazardous material issues throughout the Site.

1.1.2.1 Location

The Waunakee Alloy Facility is located in Waunakee, Dane County, WI. The site is an abandoned metal castings facility.

The site borders a park and six mile creek to the south, Madison St to the west, and resident homes to the north and east. 

1.1.2.2 Description of Threat

The main contaminants are elemental mercury and PCB's (Aroclor-1248 and Aroclor-1254). The areas with the most significant contamination are the eastern end of the main building and the voltage room. Flammable and corrosive chemicals were also identified on the site.

2. Current Activities
  2.1 Operations Section
    2.1.1 Narrative

See previous POLREPs for weekly summaries of the activities completed.  

8/17/2015 - 8/21/2015
On 8/17 START, EPA, and ERRS arrived on site to begin work where it was left off the previous week. ERRS began the week by completing the pumping out of transformer oil from the nine transformers left on-site. The oil was segregated into different drums using analytical results for PCB concentrations as the basis. Of the nine transformers on-site there were five which had non-detectable levels of PCBs and there were four which had levels that ranged between 50 and 500 ppm PCBs. There were no transformers with PCB concentrations that exceeded 500 ppm. Once the transformers were emptied, they were cleaned, filled with Oil-Dri, and staged in the building until they are able to be disposed of properly. On 8/19, ERRS completed the HAZCATing of the containers currently standing in the staging area within the building. On 8/20 ERRS completed a test of the compatibility of different drums/containers within the staging area using the information gained from HAZCATing to group them into similar waste streams and then mottling small samples of each to check for a reaction. On 8/20, ERRS began efforts to clean the area in the "hot" room that is contaminated by both PCBs and Mercury. They first pealed back the poly sheeting covering the area and utilized their Mercury Vacuum to remove any free mercury beads present, the area was then treated with HgX to fixate remaining mercury that couldn't be removed. ERRS also continued vacuuming operations throughout the facility from 8/17-8/21.

On 8/19 a 30 cubic yard box of RCRA empty drums and debris was removed and shipped for disposal to Madison Prairie Landfill in Sun Prairie, Wi.  

START set up perimeter dust monitoring on the north, south, east, and west sides of the site on days when there were no weather concerns, there were no readings above background. START also continued mercury screenings of areas once they have been cleaned to confirm ERRS has completed their work. On 8/19 START assisted ERRS with his HAZCATing and sampling of drums and containers in the staging area. On 8/20 START and ERRS collected composite samples from the foundry sands that have been containerized in cubic yard boxes to have them analyzed for TCLP. START also documented ERRS actions on the site.


2.1.2 Response Actions to Date

See previous POLREPs for weekly summaries of the activities completed.

ERRS completed pumping and cleaning of transformers on-site. 

ERRS continued vacuuming and segregating foundry sands based on START mercury assessment findings.

START completed mercury screenings of areas which ERRS had finished cleaning, conducted perimeter dust monitoring, collected samples and sent them to the lab for analysis, and documented site activities.


2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)

2.1.4 Progress Metrics

Waste Stream Medium Quantity Manifest # Treatment Disposal
 RCRA empty drums/debris    30 cuyds  T 429609    landfill
           
           


  2.2 Planning Section
    2.2.1 Anticipated Activities

2.2.1.1 Planned Response Activities

ERRS will continue to consolidate waste in staging area and prepare it to be properly disposed of once waste characterization is confirmed. ERRS will also continue to remove foundry sand located throughout the building.

START will continue to perform daily perimeter dust monitoring and conduct mercury vapor screenings of rooms as ERRS completes their cleaning. START will also continue to document and monitor site activities.


2.2.1.2 Next Steps

Wastes on site will be sampled for waste characterization and then properly disposed of.  

2.2.2 Issues




  2.3 Logistics Section
    No information available at this time.

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    No information available at this time.

3. Participating Entities
  3.2 Cooperating Agencies

Wisconsin Department of Natural Resources
Village of Waunakee

4. Personnel On Site
  US EPA - 1 
START - 1 
ERRS - 6

5. Definition of Terms
  OSC: On-Scene Coordinator
ERRS: Emergency and Rapid Response Services
START: Superfund Technical Assessment and Response Team

6. Additional sources of information
  6.1 Internet location of additional information/report

www.epaosc.org/waunakeealloy

6.2 Reporting Schedule

POLREPs will be issued weekly during field activities and as necessary thereafter