2.1.1 Narrative
2.1.2 Response Actions to Date
NEW INFORMATION IS IN BOLD LETTERS.
Since 2002 there has been one CERCLA PRP oversight removal action, 3 CERCLA Fund-lead removal actions and on OPA removal action performed at this site.
On 10/20/2015 the OSC inspected the #6 oil tank and determined that there is approx. 1,800 gallons of aged product in the tank. The OSC observed that two of the 4 sides of the containment wall have been demolished (collapsed?) and the tank is exposed to any encroaching flood water. As such, the OSC has determined that the contents of the tank pose a threat of release of petroleum products to a navigable waterway of the U.S.
On 10/26/2015 the Coast Guard's National Pollution Funds Center (NPFC) authorized the expenditure of $37,000 for remediating the #6 oil in this tank.
On 11/9/15 Task Order #0028 was issued to the ERRS contractor in the amount of $15,000, along with a Scope of Work to initiate removal activities at the Site.
On 11/10/15 the ERRS contractor visited the site and acquired a sample of #6 oil from the storage tank. The sample was hand-delivered to Safety Kleen, Cohoes NY, for analysis and acceptance.
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
There is one PRP, the son of the former owner, now deceased. He has previously demonstrated that he does not have the financial resources necessary to conduct a removal action.
2.1.4 Progress Metrics
Waste Stream |
Medium |
Quantity |
Manifest # |
Treatment |
Disposal |
#6 oil
|
liquid |
TBD |
n/a |
recycling |
n/a |
|
|
|
|
|
|
|
|
|
|
|
|
|