U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Old Saratoga Hospital (RV2) - Polrep/Sitrep

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region II
|
|
Subject:
|
SITREP #5
Action Memo for Asbestos Removal Signed
Old Saratoga Hospital (RV2)
A25L
Providence Township, NY
Latitude: 43.1096093 Longitude: -74.0195896
|
|
To:
|
Dennis Farrar, NYSDEC
Bob Marino, NYSDEC
Eric Mosher, USEPA , Region 2, ERRD-RPB
Tim Grier, USEPA Headquarters 5202G
James Daloia, USEPA, Region 2, ERRD-RPB
Mary Mears, USEPA, Region 2, PAD
Gary Bowitch, Bowitch and Coffey
John Collyer, municipal government
Michael Dipietro, NYSDEC
George Zachos, USEPA Region 2 ERRD
Angela Carpenter, USEPA-ERRD
Walter Mugdan, USEPA
Frank Csulak, NOAA
Elias Rodriguez, USEPA
Chris Jimenez, EPA
Steve Touw, ERRD-RPB
|
|
Thru:
|
|
|
From:
|
Paul L. Kahn, OSC
|
|
Date:
|
1/13/2016
|
|
Reporting Period:
|
|
|
Executive Summary
|
|
|
The Site is the
former Saratoga County Homestead Hospital that opened in 1913 as a
tuberculosis sanitarium. It is located on approximately 25 acres about 10 miles west of Saratoga
Springs, NY. When a medical cure for TB was discovered the need for
sanitariums was eliminated and the hospital eventually closed in 1960.
It reopened a few years later as a County senior center but closed in 1979.
The property was sold in the 1980s to a developer, but plans fell
through and the building was abandoned and fell into total disrepair.
Over the intervening years it was a magnet tor the occult and thrill
seekers who considered the building haunted. Amateur horror
movies and You Tube videos were made inside the building. The ground
floor windows and doorways were open and the remaining interior walls are covered with graffiti. Inside are rooms with stained mattresses, food containers, beer bottles etc. In
2014 a fire occurred and the structure was partially damaged. Fire
department officials toured the building after the fire and discovered
friable asbestos pipe and duct insulation, drums and smaller containers
of paint and chemicals. To the rear of the main building is a mechanical graveyard with old
boilers and pipes with friable asbestos insulation hanging off. The site is
located in a State-designated wetlands and is near a creek within
the Great Sacandaga Lake Watershed. On May 20, 2015 the site was
referred to EPA from the NYSDEC for an assessment and possible Superfund
removal action.
In August 2015 an emergency removal action was initiated (RV1) for abandoned chemical containers found in a
waste water treatment plant on the Site and also inside the main hospital building. The Site was authorized on 12/31/15 for a CERCLA time-critical asbestos removal action RV2.
|
|
1. Introduction
|
|
|
1.1 Background
|
|
|
|
|
Site Number: |
A25L |
|
Contract Number: |
EP15-S2-02 |
|
D.O. Number: |
027 |
|
Action Memo Date: |
12/31/2015 |
|
Response Authority: |
CERCLA |
|
Response Type: |
Time-Critical |
|
Response Lead: |
EPA |
|
Incident Category: |
Removal Action |
|
NPL Status: |
Non NPL |
|
Operable Unit: |
|
|
Mobilization Date: |
1/25/2016 |
|
Start Date: |
1/25/2016 |
|
Demob Date: |
|
|
Completion Date: |
|
|
CERCLIS ID: |
NYN000201779 |
|
RCRIS ID: |
|
|
ERNS No.: |
|
|
State Notification: |
|
1.1.1 Incident Category
Abandoned former tuberculosis cure hospital with deteriorated friable asbestos insulation inside and outside of the main building.
1.1.2 Site Description
The site is a former Saratoga County hospital used to cure patients who
had contracted tuberculosis. It was built in 1912 and consists of a two
story steel frame brick main building with a full basement, a former
boiler plant, and a former waste water treatment plant (WWTP). The
facility was closed in 1962 and subsequently purchased in 1980 by
Conifer Construction co., a building company. An attempt was made to rehab
the building and put it back into use as a senior citizen residence.
Plans fell through and the facility was abandoned in 1982. See Old Saratoga Hospital Site (RV1) for additional information and photos.
1.1.2.1 Location
It is situated in a rural residential area approximately 10 miles west of Saratoga Springs, NY
1.1.2.2 Description of Threat
The building contains thousands of linear feet of asbestos pipe
insulation, much of which has fallen onto the floors.
In another room are approximately 50 yellow asbestos bags filled with
friable asbestos. There is some type of pressure vessel in the basement
that is partially covered with a 2 inch thick blanket of asbestos
insulation; much of the insulation had fallen onto the floor. Inside
the main building are mattresses, clothing and children's toys
indicating that trespassers have been accessing the building and areas
where there is asbestos insulation. Clumps of what appears to be asbestos insulation were seen on the ground outside the main building and asbestos insulation is visible on the remains of two large steam boilers in an outside area behind the main building.
The lure of an abandoned old hospital building has become a magnet for the occult and horror seekers. Trespassers have been entering the building for more than 10 years, and at least three narrated amateur 'home' movies have been filmed there and posted on the Internet.
1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
See above.
|
|
|
1.2 Incident Objectives
|
|
|
|
The objectives at this point will be to mobilize the ERRS contractor crew to the Site to set up the command post area, including staging office trailers, establishing communications, connecting electrical power, finalizing the H & S and Work plans, and staging supplies and mechanical equipment.
|
|
|
1.3 Critical Resource Needs
|
|
|
|
Currently,
there are no critical resource needs.
Command expects to have the personnel, equipment and financial resources
available to complete all activities planned in the next operational period.
|
|
|
1.4 Strategic Considerations
|
|
|
|
At this point in the response there are no significant strategic considerations beyond ordinary activities.
|
|
2. Current Activities
|
|
|
2.1 Operations Section
|
|
|
|
2.1.1 Narrative
2.1.2 Response Actions to Date
Current information is in bold font.
On August 3 - 5 2015 EPA and it's technical contractor, Weston Solutions, acquired 23 samples of suspected ACM from various locations inside the main building and from 2 locations outside the main building. The samples were send to a laboratory for analysis. In addition to the sampling the contractor measured the length and diameter of insulated pipes in the basement and first floor in the main building.
On 9/16 EPA and tacos with the EPA removal support contractor, Weston Solutions, flew a drone over the main building at the Site and recorded the physical condition of the roof. The overflight lasted for lasted for about 10 minutes and the drone recorded about 3 minutes of footage of the roof. The overflight confirmed that the roof has collapsed in three places and there are at least a dozen smaller holes in the roof. One section, approximately 10 feet X 20 feet is shown in a dotted outline in what appears to be the beginning of an imminent collapse. RST will overlay the location of the holes and collapsed areas on a scale drawing of the building so that the rooms underneath can be blocked off for H & S concerns.
On 9/17 the OSC met with attorneys for Saratoga County and the Providence Town Supervisor at the Site. The current situation with the site was discussed and the guests were given a brief demonstration of drone ops.
On 9/17 Weston Solutions techs acquired 10 additional samples of suspected ACM. Samples were processed and will be transported to the lab on 9/18 for analysis.
Results of the second 'round of ACM sampling that occurred on 9/16/2015 have been received. This 'round of sampling was done solely on the first floor of the main building. Sample results indicated the presence of Chrysotile asbestos in concentrations ranging from 5.4% to 66.8%.
On 10/6/2015 counsel for Saratoga County informed the OSC that youths were accessing the contaminated main building in increasing numbers. In response to this information the OSC activated the ERRS contractor to initiate site security as follows: subcontract for repairs and upgrade to existing damages perimeter fencing, install plywood panels over doorways and basement windows, and post asbestos warning signs on fence and main building. ERRS contractor expected to be on Site by 10/13/2015.
ERRS contractor mobilized to the Site on 10/13/15 and purchased supplies needed to board up doors and ground floor windows. Work commenced on 10/14/2015 and continued until 10/21/2015. ERRS secured all openings to the main building, boarded up the abandoned caretakers house which had been vandalized, and also secured the WWTP which had previously contained 31 drums of hazardous substances. The WWTP contains 4 open top, water-filled process tanks which pose a drowning hazard to the public who may access this building. ERRS also cleared underbrush and small trees from around the main building, creating a swath of open space which will make trespassers more visible if they attempt to enter the building. ERRS posted asbestos warning signs at all entrances to the main building and on the perimeter fence.
ERRS is keeping one Tech at the site during daylight hours for security purposes from 10/23 to 10/26, and from 10/30 to 11/2, Halloween weekend. Tech was directed to call 911 if anyone attempts to force entry into the main building.
A trash roll-off will be ordered for the week of 10/26 and debris around the site and caretakers house will be collected for disposal.
Two full 150 pound LPG gas cylinders that were discovered in the weeds two weeks ago were picked up by a local gas supplier at no cost to the Government.
One fence contractor submitted a bid for $32,000 for fence repairs and upgrades. Bid response being reviewed by OSC. As a possible alternative to the fence contractor, ERRS is providing the OSC with a cost-estimate for in-house fence repairs and upgrades. If this is a more cost-effective way to address the needed fence repairs the ERRS contractor will proceed with its own resources to make the necessary repairs.
Site was secured and demobed at 1100 hours on 10/21/2015.
Action Memo was signed on 12/31/2015. Paperwork associated with putting funding into site account has been processed. Contractor will mobilize crew and equipment to the site on 1/25/2016.
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
There are a number of known PRPs, including the current owner and one of the former partners of
Conifer Construction. Co.and he has given EPA written
access to the entire site. Enforcement staff continue to identify additional PRPs.
2.1.4 Progress Metrics
| Waste Stream |
Medium |
Quantity |
Manifest # |
Treatment |
Disposal |
| propane |
gas |
300 lbs
|
|
recycled |
|
| asbestos |
solid |
|
|
|
|
| |
|
|
|
|
|
|
|
|
2.2 Planning Section
|
|
|
|
2.2.1 Anticipated Activities
See below.
2.2.1.1 Planned Response Activities
Mobe crew and office trailers to the Site.
Run electrical power from pole to office trailers.
Install temporary lighting in basement of main building.
Erect site sign and finish repairs to perimeter fence.
Complete Administrative Record, place in local repository, and advertise in local newspaper.
Complete draft Work Plan and Health & Safety Plan.
Mobilize portable generator and site supplies.
Establish internet and telephone comms from command post.
2.2.1.2 Next Steps
See above.
2.2.2 Issues
None presently.
|
|
|
2.3 Logistics Section
|
|
|
|
No information available at this time.
|
|
|
2.4 Finance Section
|
|
|
|
|
|
|
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
| ERRS - Cleanup Contractor |
$900,000.00 |
$0.00 |
$900,000.00 |
100.00% |
|
Intramural Costs
|
| |
| Total Site Costs |
$900,000.00 |
$0.00 |
$900,000.00 |
100.00% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
|
|
|
2.5 Other Command Staff
|
|
|
|
No information available at this time.
|
|
3. Participating Entities
|
|
|
3.1 Unified Command
3.2 Cooperating Agencies
County of Saratoga
NYSDEC
Providence Township
|
|
4. Personnel On Site
|
|
|
No information available at this time.
|
|
5. Definition of Terms
|
|
|
No information available at this time.
|
|
6. Additional sources of information
|
|
|
No information available at this time.
|
|
7. Situational Reference Materials
|
|
|
No information available at this time.
|
|
SITREP #5 Last Updated 1/14/2016
|
|
|