Hard Chrome Plating Site

All POL/SITREP's for this site Hard Chrome Plating Site
Grand Rapids, MI - EPA Region V
POLREP #8
Progress
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Hard Chrome Plating Site - Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region V

Subject: POLREP #8
Progress
Hard Chrome Plating Site

Grand Rapids, MI
Latitude: 42.9356380 Longitude: -85.6435440


To:
From: Elizabeth Nightingale, OSC
Date: 2/5/2016
Reporting Period: 2/1/16 - 2/5/16

1. Introduction
  1.1 Background
   
Site Number: C57Z    Contract Number:  
D.O. Number:      Action Memo Date: 10/5/2015
Response Authority: CERCLA    Response Type: Time-Critical
Response Lead: EPA    Incident Category: Removal Action
NPL Status: Non NPL    Operable Unit:
Mobilization Date: 11/30/2015    Start Date: 11/30/2015
Demob Date:      Completion Date:  
CERCLIS ID: MIN000505853    RCRIS ID:
ERNS No.:    State Notification:
FPN#:    Reimbursable Account #:

1.1.1 Incident Category

Time Critical Removal Action

1.1.2 Site Description
The site is a former chemical plating facility, currently owned by the Kent County Land Bank. When the property tax reverted, historically accumulated plating wastes were abandoned in the building, and discovered by the Land Bank. 

1.1.2.1 Location

The site is located at 1516 Blaine Avenue SE, Grand Rapids, Kent County, Michigan 49507. The site totals approximately 1/4 acre, and contains a one story industrial building and an open lot. The site was recently occupied by the Hard Chrome Plating and HCP Finishing LLC companies, and tax reverted to the Kent County Land Bank in 2014.

1.1.2.2 Description of Threat

See POLREP 1.

 

1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results

See POLREP 1.

2. Current Activities
  2.1 Operations Section
   

2.1.1 Narrative

2.1.2 Response Actions to Date

2.1.2.1 Actions During Reporting Period

Over the reporting period, work focused primarily on the following activities:

- Continuing to implement air monitoring program

- Continuing to clear debris from within the building and decontaminate building floors. Non-hazardous debris is being consolidated in rolloff boxes. Sweepings are consolidated in cubic yard boxes for disposal.

- Continuing to package, overpack when necessary and secure waste for disposal. All known containerized wastes have now been secured pending disposal. 

- All sumps have been evacuated. One sump is continuing to refill with rainwater. 

- Continuing to dismantle vats. All 14 vats have now been evacuated. The entire nickel plating line has been dismantled, and staged for disposal/recycling. We completed evacuating the contents from the vats from the chrome plating line in Storage Area 1 during this reporting period, and removed the final 3 large vats (vats 2, 4, and 6) from floor inset location in Storage Area 1 (see photos). After the vats were removed, we decontaminated the floors where the vats had been located, and removed unnecessary pipework and ductwork. 

- Continued removal of ventilation systems.

 

 

2.1.2.2 Air Monitoring
Every day that cleanup activity work will be ongoing, air monitoring will be conducted to ensure public and worker safety. Please see the air monitoring plan and POLREP 2 for details.

A website has been established to view the current and past air monitoring data for the site. To view the data go to the web address: viper.ert.org. You have to create a login on your first visit to the site. Once logged in, go to the R05 Hard Chrome Metals Deployment to view site data. 

Particulate Air Monitoring:

Over the reporting period, no exceedances of the perimeter or work zone action levels (calculated as work day averages) for particulates were detected. 


MultiGas Air Monitoring:

Over the reporting period, no exceedances of the perimeter or work zone action levels were verified.

 

Hydrochloric Acid Monitoring

Over the reporting period, no exceedances of the perimeter or work zone action levels were detected. 

2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
General notice letters were issued to former owners of the property. Investigation is ongoing.

2.1.4 Progress Metrics

Waste Stream Medium Quantity Manifest # Treatment Disposal
 Solid  Non-Hazardous Debris  8 Tons  n/a    x
 Solid  Mixed Recyclables  4 bags      x (recycling)
 Solid  Non-Hazardous Debris  60 cubic yards
 n/a    x
 Solid  Non-Hazardous Debris 8 Tons  n/a     x

 


  2.2 Planning Section
   

2.2.1 Anticipated Activities

2.2.1.1 Planned Response Activities

See POLREP 1.

2.2.1.2 Next Steps
Over the next week, we will complete work to dismantle remaining vats where necessary; continue to decontaminate the building and floors; and remove and stage air filtration infrastructure for disposal. We will insure that all waste is secure and properly staged pending disposal and prepare to demobilize pending arrangement of disposal.

-   Security will be on site during non working hours, and during the time we are off-site arranging disposal.

2.2.2 Issues

Overnight on February 2nd, the Grand Rapids area received over 1.5 inches of rain. On February 3rd, while removing the tarp that was covering the non-hazardous waste rolloff, we inadvertently tore/punctured the tarp. This resulted in rainwater that had pooled on the tarp entering the rolloff and flowing through a seam onto a portion of the site parking lot. We immediately covered the storm drain in the street downstream from the site, deployed absorbent and collected the runoff with a shop vac. The runoff was contained within the parking area. There were no air monitoring readings above background. 

  2.3 Logistics Section
    ERRS is managing site logistics.

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    2.5.1 Safety Officer
OSC is serving in this role.

2.5.2 Liaison Officer
OSC is serving in this role.

2.5.3 Information Officer
OSC is serving in this role.


3. Participating Entities
 

3.1 Unified Command

3.2 Cooperating Agencies

Kent County Land Bank
MDEQ

4. Personnel On Site
 

2/1/16
EPA: 1
START: 1
ERRS: 7
USCG AST: 2

2/2/16-2/5/16
EPA: 1
START: 1
ERRS: 6
USCG AST: 2

5. Definition of Terms
 
ATSDR   Agency for Toxic Substances and Disease Registry
 BZ  Breathing Zone
CERCLA Comprehensive Environmental Response, Compensation, and Liability Act
CERCLIS   Comprehensive Environmental Response, Compensation, and Liability Information System
DNR   Department of Natural Resources
EPA   Environmental Protection Agency
ERNS   Emergency Response Notification System
ERRS   Emergency and Rapid Response Service
MDEQ  Michigan Department of Environmental Quality
NCP   National Oil and Hazardous Substance Pollution Contingency Plan
mg/m3  miligrams per cublic meter
NOAA   National Oceanic and Atmospheric Administration 
NPL   National Priorities List
NRC   National Response Center
OSC   On Scene Coordinator
PPE  Personal Protective Equipment
PPM  Parts per million
RCRIS   Resource Conservation and Recovery Act Information System
RP   Responsible Party
RRT   Regional Response Team
START   Superfund Technical Assessment and Response Team
 ug/m3  micrograms per cubic meter
US FWS   United States Fish and Wildlife Service
USCG AST  United States Coast Guard Atlantic Strike Team
 VOC  Volatile Organic Compound


6. Additional sources of information
  6.1 Internet location of additional information/report
www.epaosc.net/hardchromeplating

and 

viper.ert.org. Once logged in, go to the R05 Hard Chrome deployment to view site data.

6.2 Reporting Schedule
POLREPs will typically be issued weekly over the course of the removal action.

7. Situational Reference Materials
  No information available at this time.

No information available at this time.
No information available at this time.
No information available at this time.
No information available at this time.



Click here to view Attached Images