U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Otsego Township Dam Area - Removal Polrep

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region V
|
|
Subject:
|
POLREP #3
Progress
Otsego Township Dam Area
059B
Otsego Township, MI
Latitude: 42.4601694 Longitude: -85.7199333
|
|
To:
|
Douglas Ballotti, EPA
Thomas Short, EPA
Samuel Borries, EPA
Mike Ribordy, EPA
Jim Saric, EPA
Mark Mills, MDNR
Dan Peabody, MDEGLE
Polly Synk, MDAG
Randy Rapp, Allegan County Health Dept
Dan Wedge, Allegan County
Cyndi Trobeck, City of Otsego
Bryan Winn, Otsego Township
Lisa Williams, U.S. FWS
Valincia Darby, U.S. DOI
Greg Baker, NOAA
|
|
From:
|
Paul Ruesch, OSC
|
|
Date:
|
9/14/2016
|
|
Reporting Period:
|
9/1/2016 - 9/14/2016
|
|
1. Introduction
|
|
|
1.1 Background
|
|
|
|
|
Site Number: |
059B |
|
Contract Number: |
|
|
D.O. Number: |
|
|
Action Memo Date: |
4/6/2016 |
|
Response Authority: |
CERCLA |
|
Response Type: |
PRP Oversight |
|
Response Lead: |
PRP |
|
Incident Category: |
Removal Action |
|
NPL Status: |
NPL |
|
Operable Unit: |
5 |
|
Mobilization Date: |
8/1/2016 |
|
Start Date: |
8/1/2016 |
|
Demob Date: |
|
|
Completion Date: |
|
|
CERCLIS ID: |
MID006007306 |
|
RCRIS ID: |
|
|
ERNS No.: |
|
|
State Notification: |
DEQ |
|
FPN#: |
|
|
Reimbursable Account #: |
059B |
1.1.1 Incident Category
Time Critical Removal Action - PRP Oversight
1.1.2 Site Description
See PolRep #1
1.1.2.1 Location
See PolRep #1
1.1.2.2 Description of Threat
See PolRep #1
1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
See PolRep #1
|
|
2. Current Activities
|
|
|
2.1 Operations Section
|
|
|
|
2.1.1 Narrative
Contractors finalized preparations for contaminated sediment and bank soil excavation in BRSA 1, which will begin this week. Excavation in Cell 1 of BRSA 1 will primarily involve bank soils.
2.1.2 Response Actions to Date
The following activities took place during the reporting period:
- Complete construction & testing of WWTP in the BRSA 1 forward staging area;
- Start-up of particulate (dust) monitoring system in BRSA 1;
- Installation and start-up of turbidity monitoring in Kalamazoo River around BRSA 1 excavation area (1 upstream monitor and 2 downstream monitors);
- Completion of the BRSA 1 staging area, including the contaminated sediments staging area, support areas, and riverbank access roads;
- Installation of water management infrastructure (sediment curtain, coffer dam, HDPE pipe) to support excavation activities in BRSA 1;
- Completion of mussel survey/relocation; and
- Continuation of bathymetric/hydrographic/overbank surveying activities.
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
See PolRep #1
2.1.4 Progress Metrics
| Waste Stream |
Medium |
Quantity |
Manifest # |
Treatment |
Disposal |
| |
|
|
|
|
|
| |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
2.2 Planning Section
|
|
|
|
2.2.1 Anticipated Activities
During the next reporting period, the following activities are expected to occur:
- Excavation of contaminated sediments and bank soils in BRSA 1;
- Solidification/staging/transport of contaminated sediments & bank soils for disposal at approved landfill facilities;
- Reconstruction/restoration of excavated areas in BRSA 1;
- Operation of dust & turbidity monitoring systems in BRSA 1; and
- Completion of bathymetric/hydrographic/overbank surveying activities.
2.2.1.1 Planned Response Activities
See Section 2.2.1
2.2.1.2 Next Steps
See Section 2.2.1
2.2.2 Issues
None
|
|
|
2.3 Logistics Section
|
|
|
|
See PolRep #1
|
|
|
2.4 Finance Section
|
|
|
|
2.4.1 Narrative
See PolRep #1
|
|
|
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
| START |
$265,000.00 |
$215,000.00 |
$50,000.00 |
18.87% |
|
Intramural Costs
|
| USEPA - Direct |
$50,000.00 |
$16,000.00 |
$34,000.00 |
68.00% |
| USEPA - InDirect |
$12,000.00 |
$5,500.00 |
$6,500.00 |
54.17% |
| |
| Total Site Costs |
$327,000.00 |
$236,500.00 |
$90,500.00 |
27.68% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
|
|
|
2.5 Other Command Staff
|
|
|
|
2.5.1 Safety Officer
See PolRep #1
2.5.2 Liaison Officer
Diane Russell (US EPA) continues in the role of CIC.
2.5.3 Information Officer
|
|
3. Participating Entities
|
|
|
3.1 Unified Command
3.2 Cooperating Agencies
See PolRep #1
|
|
4. Personnel On Site
|
|
|
On average, the following personnel were present on site during the reporting period:
US EPA - 1
Michigan DNR - 1
START (US EPA contractor) - 2
Envirocon (general contractor): 16
ProAct (WWTP contractor): 2
AMEC-FW (project consultant): 3
Spicer Group (surveyors): 3
Environmental Solutions & Innovations, Inc. (mussel survey/relocation sub-contractor): 2
TOTAL: 30
|
|
5. Definition of Terms
|
|
|
GC General Contractor
AMEC-FW AMEC Foster Wheeler
BRSA Bank Removal and Stabilization Area
CIC Community Involvement Coordinator
HDPE High Density Polyethylene
Michigan DNR Michigan Department of Natural Resources
OSC On Scene Coordinator
PolRep Pollution Report
PRP Potentially Responsible Party
US EPA United States Environmental Protection Agency
WWTP Waste Water Treatment Plant
|
|
6. Additional sources of information
|
|
|
6.1 Internet location of additional information/report
http://www.epaosc.org/otsegodam
www.epa.gov/superfund/allied-paper-kalamazoo
6.2 Reporting Schedule
PolReps are generated every two weeks during active field activities.
|
|
7. Situational Reference Materials
|
|
|