Progress
Intermet/Wagner Castings Site
C53X
Decatur, IL
Latitude: 39.8490856 Longitude: -88.9389853
|
To:
|
|
From:
|
Craig Thomas, OSC
|
Date:
|
9/30/2016
|
Reporting Period:
|
9/17/2016 - 9/30/2016
|
1. Introduction
|
|
1.1 Background
|
|
|
Site Number: |
C53X |
|
Contract Number: |
EP-S4-16-03 |
D.O. Number: |
0001 |
|
Action Memo Date: |
4/20/2016 |
Response Authority: |
CERCLA |
|
Response Type: |
Time-Critical |
Response Lead: |
EPA |
|
Incident Category: |
Removal Action |
NPL Status: |
Non NPL |
|
Operable Unit: |
|
Mobilization Date: |
9/6/2016 |
|
Start Date: |
9/6/2016 |
Demob Date: |
|
|
Completion Date: |
|
CERCLIS ID: |
ILN000505575 |
|
RCRIS ID: |
|
ERNS No.: |
|
|
State Notification: |
|
FPN#: |
|
|
Reimbursable Account #: |
|
1.1.1 Incident Category
Time Critical Removal Action
1.1.2 Site Description
The Site occupies nine adjacent parcels covering approximately 30 acres, bounded by East Marietta Street to the north, North Jasper Street to the west, and Norfolk Southern rail lines to the south and east. A residential neighborhood is located immediately north of the facility.
See PolRep 1 for additional Site Description information.
1.1.2.1 Location
The Site is located on 9 separate land parcels
in Decatur, Macon County, Illinois. The Site’s geographical
coordinates are 39° 50’ 56.7” north latitude and 88° 56’ 20.4” west longitude.
The Site occupies nine adjacent parcels
covering approximately 30 acres, bounded by East Marietta Street to the north,
North Jasper Street to the west, and Norfolk Southern rail lines to the south
and east. A residential neighborhood is
located immediately north of the Site, and some of the homes in that
neighborhood are within 100 feet of the Site.
1.1.2.2 Description of Threat
See PolRep 1.
1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
See PolRep 1.
|
2. Current Activities
|
|
2.1 Operations Section
|
|
|
|
2.1.1 Narrative
On September 6, 2016, U.S. EPA initiated a time-critical removal action at the Site. Currently, the removal action is anticipated to last 90 working days and include removal and off-site disposal of hazardous wastes and special wastes. Hazards include PCBs, ACM, mercury, chrome dioxide and other miscellaneous chemical containers spread throughout the site.
2.1.2 Response Actions to Date
Week of September 19, 2016 - ERRS continued consolidating orphan chemical containers and fire extinguishers. ERRS emptied fire extinguisher contents into 55-gallon drums. Piles of galbestos siding were consolidated with the asbestos debris piles. ERRS ensured that wastes stored in the Waste Storage Building were separated by compatibility groups.
START continued perimeter air monitoring.
U.S. EPA OSC Thomas oversaw all removal activities.
Week of September 23, 2016 - ERRS
ERRS prepared stations to line trucks and decontaminate trucks hauling wastes to the disposal area, wetted down debris piles, and moved them into rows to facilitate loading of trucks. While conducting this activity, an approximately 32' X 32' X 7' basement full of debris was discovered, resulting in approximately 265 cubic yards more of asbestos-contaminated debris. After completing these activities, ERRS loaded and shipped 28 trucks (approximately 560 cubic yards) of asbestos- containing construction debris.
START continued perimeter air monitoring and conducted perimeter air sampling; a total of 11 samples were collected and submitted to a laboratory for asbestos analyses. START also collected a composite bulk asbestos sample from 2 newly discovered floor pits containing what appears to be fire brick in one of the buildings.
U.S. EPA OSC Tricia Edwards oversaw all removal activities. U.S. EPA OSC Thomas conducted outreach with Macon County Environmental Management to make them aware of the time critical removal action.
|
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
2.1.4 Progress Metrics
Waste Stream |
Medium |
Quantity |
Manifest # |
Date |
Treatment |
Disposal |
Friable Asbestos |
solid (debris) |
20 cubic yards |
91346 |
9/28/16 |
|
Five Oaks RDF
Taylorville, IL
|
Friable Asbestos |
solid (debris) |
20 cubic yards |
91347 |
9/28/16 |
|
Five Oaks RDF, Taylorville, IL
|
Friable Asbestos |
solid (debris) |
20 cubic yards |
91348 |
9/28/16 |
|
Five Oaks RDF
Taylorville, IL
|
Friable Asbestos |
solid (debris) |
20 cubic yards |
91349 |
9/28/16 |
|
Five Oaks RDF
Taylorville, IL
|
Friable Asbestos |
solid (debris) |
20 cubic yards |
91350 |
9/28/16 |
|
Five Oaks RDF
Taylorville, IL
|
Friable Asbestos |
solid (debris) |
20 cubic yards |
91351 |
9/28/16 |
|
Five Oaks RDF
Taylorville, IL
|
Friable Asbestos |
solid (debris) |
20 cubic yards |
91352 |
9/29/16 |
|
Five Oaks RDF
Taylorville, IL
|
Friable Asbestos |
solid (debris) |
20 cubic yards |
91353 |
9/29/16 |
|
Five Oaks RDF
Taylorville, IL
|
Friable Asbestos |
solid (debris) |
20 cubic yards |
91354 |
9/29/16 |
|
Five Oaks RDF
Taylorville, IL
|
Friable Asbestos |
solid (debris) |
20 cubic yards |
91355 |
9/29/16 |
|
Five Oaks RDF
Taylorville, IL
|
Friable Asbestos |
solid (debris) |
20 cubic yards |
91356 |
9/29/16 |
|
Five Oaks RDF
Taylorville, IL
|
Friable Asbestos |
solid (debris) |
20 cubic yards |
91357 |
9/29/16 |
|
Five Oaks RDF
Taylorville, IL
|
Friable Asbestos |
solid (debris) |
20 cubic yards |
91358 |
9/29/16 |
|
Five Oaks RDF
Taylorville, IL
|
Friable Asbestos |
solid (debris) |
20 cubic yards |
91359 |
9/29/16 |
|
Five Oaks RDF
Taylorville, IL
|
Friable Asbestos |
solid (debris) |
20 cubic yards |
91361 |
9/29/16 |
|
Five Oaks RDF
Taylorville, IL
|
Friable Asbestos |
solid (debris) |
20 cubic yards |
99807 |
9/29/16 |
|
Five Oaks RDF
Taylorville, IL
|
Friable Asbestos |
solid (debris) |
20 cubic yards |
99808 |
9/29/16 |
|
Five Oaks RDF
Taylorville, IL
|
Friable Asbestos |
solid (debris) |
20 cubic yards |
99809 |
9/29/16 |
|
Five Oaks RDF
Taylorville, IL
|
Friable Asbestos |
solid (debris) |
20 cubic yards |
99810 |
9/29/16 |
|
Five Oaks RDF
Taylorville, IL
|
Friable Asbestos |
solid (debris) |
20 cubic yards |
99772 |
9/30/16 |
|
Five Oaks RDF
Taylorville, IL
|
Friable Asbestos |
solid (debris) |
20 cubic yards |
99773 |
9/30/16 |
|
Five Oaks RDF
Taylorville, IL
|
Friable Asbestos |
solid (debris) |
20 cubic yards |
99774 |
9/30/16 |
|
Five Oaks RDF
Taylorville, IL
|
Friable Asbestos |
solid (debris) |
20 cubic yards |
99775 |
9/30/16 |
|
Five Oaks RDF
Taylorville, IL
|
Friable Asbestos |
solid (debris) |
20 cubic yards |
99811 |
9/30/16 |
|
Five Oaks RDF
Taylorville, IL
|
Friable Asbestos |
solid (debris) |
20 cubic yards |
99812 |
9/30/16 |
|
Five Oaks RDF
Taylorville, IL
|
Friable Asbestos |
solid (debris) |
20 cubic yards |
99813 |
9/30/16 |
|
Five Oaks RDF
Taylorville, IL
|
Friable Asbestos |
solid (debris) |
20 cubic yards |
99814 |
9/30/16 |
|
Five Oaks RDF
Taylorville, IL
|
Friable Asbestos |
solid (debris) |
20 cubic yards |
99815 |
9/30/16 |
|
Five Oaks RDF
Taylorville, IL
|
|
|
|
|
|
|
|
|
|
2.2 Planning Section
|
|
|
2.2.1 Anticipated Activities
See Section 2.2.1.1, below.
2.2.1.1 Planned Response Activities
Develop and implement a Site-specific Health and Safety Plan, including an Air Monitoring Plan, and a Site Emergency Contingency Plan;
- Characterize, remove, transport and dispose of all characterized or identified hazardous waste, special wastes and associated debris located at the Site;
- A structural Engineer assessed the former office building on site and determine it did not need to be demolished to safely conduct asbestos abatement. A licensed abatement contractor will be retained to conduct this work.
- Dispose of or recycle non-hazardous waste, as appropriate;
- Decontaminate floors of Site buildings, as needed;
- Remove capacitors from current storage area.
2.2.1.2 Next Steps
- ERRS completed segregation of hazardous and non-hazardous waste streams, and staged hazardous materials
inside the waste storage building; Waste profiles will be developed, and disposal/recycling facilities will be identified.
- ERRS will continue disposal of asbestos-containing debris. PCB-containing capacitors will be sent for recycling.
- START will continue conducting perimeter air
monitoring, and conduct additional characterization and confirmation sampling as needed.
2.2.2 Issues
Lab data indicates that the green powder in the Waste Storage building does not contain chrome dioxide. Therefore it will not be mentioned in future PolReps, and will no longer be considered a contaminant of concern.
|
|
2.3 Logistics Section
|
|
|
No information available at this time.
|
|
2.4 Finance Section
|
|
|
No information available at this time.
|
|
2.5 Other Command Staff
|
|
|
2.5.1 Safety Officer
OSC Thomas/OSC Edwards
2.5.2 Liaison Officer
2.5.3 Information Officer
|
3. Participating Entities
|
|
3.1 Unified Command
3.2 Cooperating Agencies
Illinois EPA
Decatur Fire Department
City of Decatur
|
4. Personnel On Site
|
|
EPA = 1
ERRS = 8
START = 1
Total personnel on site during this reporting period = 10
|
5. Definition of Terms
|
|
ACM: Asbestos Containing Material
CERCLA: Comprehensive Environmental Response, Compensation, and Liability Act
CFR: Code of Federal Regulations
ERRS: Emergency and Rapid Response Services contractor
Illinois EPA: Illinois Environmental Protection Agency
NCP: National Contingency Plan
OSC: On-Scene Coordinator
PCB: Polychlorinated Biphenyl
POLREP: Pollution Report
START: Superfund Technical Assessment and Response Team contractor
US EPA: United States Environmental Protection Agency
|
6. Additional sources of information
|
|
No information available at this time.
|
7. Situational Reference Materials
|
|
No information available at this time.
|
|
|