POLREP #11
Progress
Otsego Township Dam Area
059B
Otsego Township, MI
Latitude: 42.4601694 Longitude: -85.7199333
|
To:
|
Douglas Ballotti, EPA
Samuel Borries, EPA
Mike Ribordy, EPA
Jim Saric, EPA
Mark Mills, MDNR
Polly Synk, MDAG
Cyndi Trobeck, City of Otsego
Valincia Darby, U.S. DOI
|
From:
|
Paul Ruesch, OSC
|
Date:
|
2/24/2017
|
Reporting Period:
|
1/28/2017 - 2/24/2017
|
1. Introduction
|
|
1.1 Background
|
|
|
Site Number: |
059B |
|
Contract Number: |
|
D.O. Number: |
|
|
Action Memo Date: |
4/6/2016 |
Response Authority: |
CERCLA |
|
Response Type: |
PRP Oversight |
Response Lead: |
PRP |
|
Incident Category: |
Removal Action |
NPL Status: |
NPL |
|
Operable Unit: |
5 |
Mobilization Date: |
8/1/2016 |
|
Start Date: |
8/1/2016 |
Demob Date: |
|
|
Completion Date: |
|
CERCLIS ID: |
MID006007306 |
|
RCRIS ID: |
|
ERNS No.: |
|
|
State Notification: |
DEQ |
FPN#: |
|
|
Reimbursable Account #: |
059B |
1.1.1 Incident Category
Time Critical Removal Action - PRP Oversight
1.1.2 Site Description
See PolRep #1
1.1.2.1 Location
See PolRep #1
1.1.2.2 Description of Threat
See PolRep #1
1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
See PolRep #1
|
2. Current Activities
|
|
2.1 Operations Section
|
|
|
2.1.1 Narrative
Land clearing, grading and road building activities continue in BRSAs 3, 4, 6 & 9 in preparation for the anticipated start of dredging operations in late March. BRSAs 3 & 4 are located immediately downstream of the Lincoln Road (M-89) bridge. BRSAs 6 & 9 are located near the Pine Creek dam.
2.1.2 Response Actions During Reporting Period
The following activities took place during the reporting period:
- Land clearing, grading & access road construction in BRSAs 3 (complete), 4 (underway), 6 (complete) & 9 (underway);
- Placement of road safety signage along Lincoln Road (M-89) to alert drivers of trucks entering highway;
- Construction of staging area to support a staging / loadout pad & wastewater treatment operations in BRSA 3 (underway);
- Surveying and bathymetric surveys in BRSAs 7 & 8 and downstream of temporary WCS;
- Permits were obtained from Allegan County & Michigan DOT for work in or along rights-of-way for remaining BRSAs; and
- Monitoring & maintenance of temporary WCS and ice boom (ongoing).
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
See PolRep #1
2.1.4 Progress Metrics
No waste materials were managed during the reporting period. Totals to date are included in the table.
Waste Stream |
Medium |
Quantity |
Total |
Manifest # |
Treatment |
Disposal |
Cardboard |
solid |
0 lbs |
480 lbs |
NA |
recycling |
Otsego Recycling Center
|
Plastic |
solid |
0 lbs |
150 lbs |
NA |
recycling |
Otsego Recycling Center |
Steel |
solid |
0 lbs |
5480 lbs |
various |
recycling |
Broken Arrow Recycling |
Contaminated soil (< 50 ppm* PCBs) |
solid |
0 tons |
6973.91 tons |
various |
disposal |
Republic Ottawa County Farms Landfill, Coopersville, MI |
Contaminated soil
(> 50 ppm* PCBs) |
solid |
0 tons |
103.91 tons |
various |
disposal |
US Ecology Michigan,
Belleville, MI |
Contact water |
liquid |
0 gal |
303,075 gal |
NA |
on-site WWTP |
On-site reuse/discharge to Kalamazoo River |
*Note: 1 ppm = 1 mg/kg
|
|
2.2 Planning Section
|
|
|
2.2.1 Anticipated Activities
During the next reporting period, the following activities are expected to occur:
- Completion of staging area and crew parking area in BRSA 3;
- Mobilization and construction of staging pad and water treatment plant in BRSA 3;
- Continued construction of access & staging areas in BRSAs 4, 6 & 9; and
- Maintenance / monitoring of the temporary WCS.
2.2.1.1 Planned Response Activities
See Sections 2.2.1 & 2.2.1.2
2.2.1.2 Next Steps
- AMEC-FW will submit a draft Technical Memorandum for dredging operations in BRSAs 4, 6 & 9 to EPA on February 24 for review and comment.
2.2.2 Issues
N/A
|
|
2.3 Logistics Section
|
|
|
See PolRep #1
|
|
2.4 Finance Section
|
|
|
No information available at this time.
|
|
2.5 Other Command Staff
|
|
|
No information available at this time.
|
3. Participating Entities
|
|
3.1 Unified Command
3.2 Cooperating Agencies
See PolRep #1
|
4. Personnel On Site
|
|
On average, the following personnel were present on site during the reporting period:
US EPA - 1
Michigan DNR - 1
Envirocon: 15
Toad Tree Services: 3
AMEC-FW: 2
Spicer Group: 2
TOTAL: 24
|
5. Definition of Terms
|
|
AMEC-FW AMEC Foster Wheeler
BRSA Bank Removal and Stabilization Area
mg/kg milligrams per kilogram
Michigan DEQ Michigan Department of Environmental Quality
Michigan DNR Michigan Department of Natural Resources
Michigan DOT Michigan Department of Transportation
OSC On Scene Coordinator
PCBs Poly-chlorinated biphenyls
PolRep Pollution Report
ppm parts per million
PRP Potentially Responsible Party
US EPA United States Environmental Protection Agency
WCS Water Control Structure
|
6. Additional sources of information
|
|
6.1 Internet location of additional information/report
http://www.epaosc.org/otsegodam
www.epa.gov/superfund/allied-paper-kalamazoo
6.2 Reporting Schedule
The next PolRep will be generated on March 24.
|
7. Situational Reference Materials
|
|
No information available at this time.
|
|
|