U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Otsego Township Dam Area - Removal Polrep

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region V
|
Subject:
|
POLREP #16
Progress
Otsego Township Dam Area
059B
Otsego Township, MI
Latitude: 42.4601694 Longitude: -85.7199333
|
To:
|
Douglas Ballotti, EPA
Samuel Borries, EPA
Mike Ribordy, EPA
Jim Saric, EPA
Mark Mills, MDNR
Polly Synk, MDAG
Cyndi Trobeck, City of Otsego
Valincia Darby, U.S. DOI
|
From:
|
Paul Ruesch, OSC
|
Date:
|
5/26/2017
|
Reporting Period:
|
5/13/2017 - 5/26/2017
|
1. Introduction
|
|
1.1 Background
|
|
|
Site Number: |
059B |
|
Contract Number: |
|
D.O. Number: |
|
|
Action Memo Date: |
4/6/2016 |
Response Authority: |
CERCLA |
|
Response Type: |
PRP Oversight |
Response Lead: |
PRP |
|
Incident Category: |
Removal Action |
NPL Status: |
NPL |
|
Operable Unit: |
5 |
Mobilization Date: |
8/1/2016 |
|
Start Date: |
8/1/2016 |
Demob Date: |
|
|
Completion Date: |
|
CERCLIS ID: |
MID006007306 |
|
RCRIS ID: |
|
ERNS No.: |
|
|
State Notification: |
DEQ |
FPN#: |
|
|
Reimbursable Account #: |
059B |
1.1.1 Incident Category
Time Critical Removal Action - PRP Oversight
1.1.2 Site Description
See PolRep #1
1.1.2.1 Location
See PolRep #1
1.1.2.2 Description of Threat
See PolRep #1
1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
See PolRep #1
|
2. Current Activities
|
|
2.1 Operations Section
|
|
|
2.1.1 Narrative
Excavation of contaminated riverbank soils is complete in BRSA 3. Contaminated soils/sediments continue to be loaded out for transport & disposal. Preparation for excavation activities in BRSA 4 continues, with installation of coffer dams in the river to isolate in-stream sediments requiring removal.
2.1.2 Response Actions During Reporting Period
- Excavation of contaminated soils with confirmation sampling results received from remaining grids (10-18) in BRSA 3 (see table below for clearance sampling results). There were 18 total grids in BRSA 3, with each grid consisting of approximately 50 lineal feet of riverbank. The target clean-up goal in the riverbank soils is 5 mg/kg total PCBs;
BRSA 3
GRID
|
TOTAL ESTIMATED EXCAVATION DEPTH (in)
|
FINAL
CONFIRMATION TOTAL PCBs RESULT (mg/kg)
|
10
|
24
|
ND
|
11
|
24
|
ND
|
12
|
24
|
ND
|
13
|
24
|
ND
|
14
|
24
|
0.067
|
15
|
36
|
3.8
|
16
|
36
|
4.5
|
17
|
24
|
0.76
|
18
|
24
|
2.1
|
Note: Confirmatory sampling takes place immediately following excavation of contaminated soils in accordance with procedures outlined in the Field Sampling Plan and the Technical Memorandum for BRSA 3. Both documents can be found in the ‘Documents' Section of the project website.
- Transport/disposal of approximately 1847 tons of excavated soils to an EPA-approved landfill facility (see Section 2.1.4);
- Treatment of approximately 39,000 gallons of contact water from contaminated grids and contaminated soils staging pad in the on site WWTP (see Section 2.1.4). Sampling results continue to confirm non-detect levels for total PCBs in treated water;
- Construction of both sand bag and steel sheet pile coffer dams in BRSA 4 to prepare for contaminated riverbank soil & in-stream sediment removal (see photo);
- Daily particulate monitoring (PM10) around the site perimeter with no sustained exceedance off site of particulates above the action level of 1.5 mg/m3;
- Turbidity control measures and monitoring in Kalamazoo River around the BRSA 3 - 9 excavation area (1 upstream monitor and 2 downstream monitors), with no sustained exceedance of the action level of 50 NTUs above upstream levels;
and
- Monitoring & maintenance of the temporary WCS.
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
See PolRep #1
2.1.4 Progress Metrics
Both quantities during the reporting period ('Quantity' column) and totals to date ('Total' column) are included in the table.
Waste Stream |
Medium |
Quantity |
Total |
Manifest # |
Treatment |
Disposal |
Cardboard |
solid |
20 lbs |
640 lbs |
NA |
recycling |
Otsego Recycling Center
|
Plastic |
solid |
10 lbs |
210 lbs |
NA |
recycling |
Otsego Recycling Center |
Steel |
solid |
20 lbs |
9120 lbs |
various |
recycling |
Broken Arrow Recycling |
Contaminated soil (< 50 ppm* PCBs) |
solid |
1874 tons (est) |
9200 tons (est) |
various |
disposal |
Republic Ottawa County Farms Landfill, Coopersville, MI |
Contaminated soil
(> 50 ppm* PCBs) |
solid |
0 tons |
103.91 tons |
various |
disposal |
US Ecology Michigan,
Belleville, MI |
Contact water |
liquid |
39,000 gal |
351,475 gal |
NA |
on-site WWTP |
On-site reuse/discharge to Kalamazoo River |
*Note: 1 ppm = 1 mg/kg
|
|
2.2 Planning Section
|
|
|
2.2.1 Anticipated Activities
During the next reporting period, the following activities are expected to occur:
BRSA 3
- Reconstruct & restore riverbanks;
- Complete
transport of contaminated sediments & bank soils for disposal; and
- Decommission
and demobilize WWTP along with other equipment from staging area.
BRSA 4
- Complete construction of staging area, stabilization pad & on site WWTP; and
- Continue
installation of sand bag and steel sheet pile coffer dams to prepare for excavation of contaminated sediments.
SITEWIDE
- Operate
dust and turbidity control/monitoring systems; and
- Maintain/monitor temporary WCS.
2.2.1.1 Planned Response Activities
See Sections 2.2.1 & 2.2.1.2
2.2.1.2 Administrative Activities / Next Steps
- Planning discussions continue on a draft TM for BRSAs 7 & 8, which include plans for removal of the temporary WCS.
- On
May 19, US EPA responded to a May 12 letter from MDEQ concerning the proposed approach in BRSAs 7 & 8
(see 'documents' section).
- US EPA met with representatives of Michigan Gas Utilities on May 16 to discuss a proposed natural gas line installation that may impact the area in the vicinity of the project command center located at 2063 Covault Lane.
- AMEC-FW submitted a revised draft TM for BRSAs 4, 5, 6 & 9 for review and approval on May 24. The TM components
dealing with BRSA 4 were already conditionally approved on April 10, so review is only focused on the TM sections
relating to BRSAs 5, 6 & 9.
- Draft
restoration plan proposals for the spillway area adjacent to the temporary WCS (BRSA 8 entrance), and the end
of 19th Street (BRSA 6 entrance) were prepared by START in coordination with Michigan DNR and Allegan County Road Commission for incorporation into draft TM documents.
2.2.2 Issues
Four representatives
of a local labor union began sporadic demonstration activity at the entrances of BRSA 3 on May 16
and BRSA 4 on May 25. Though this activity has not impacted work progress, it has presented a safety
hazard with respect to traffic both passing by and entering/exiting the staging area(s).
|
|
2.3 Logistics Section
|
|
|
See PolRep #1
|
|
2.4 Finance Section
|
|
|
No information available at this time.
|
|
2.5 Other Command Staff
|
|
|
2.5.1 Safety Officer
A safety meeting is held prior to start of work each day. The meeting is led by on-site safety officer(s) representing both Envirocon and AMEC-FW.
2.5.2 Liaison Officer
OSC Ruesch met with union business representative Joseph Schippa on May 16 to inform him of current site activities and relay concerns about traffic safety in the vicinity of staging area entrances as well as for traffic along Lincoln Road (M-89). US EPA notified Michigan DNR, Michigan DEQ, Allegan County Sheriff, Otsego City Police, Michigan DOT, Allegan County Road Commission, property owners, and neighboring residents of the union activity on May 16-17.
2.5.3 Information Officer
A flyer was distributed door to door to neighbors in the vicinity of BRSA 4 notifying them of the possibility of increased noise from
steel sheet pile installation.
|
3. Participating Entities
|
|
3.1 Unified Command
3.2 Cooperating Agencies
See PolRep #1
|
4. Personnel On Site
|
|
On average, the following personnel were present on site during the reporting period:
US EPA - 1
START - 1
Michigan DNR - 1
Michigan DEQ - 1
Envirocon: 24
AMEC-FW: 2
Spicer Group: 1
TOTAL: 31
|
5. Definition of Terms
|
|
AMEC-FW AMEC Foster Wheeler
BRSA Bank Removal and Stabilization Area
GC General Contractor
mg/kg milligrams per kilogram
MDEQ Michigan Department of Environmental Quality
MDNR Michigan Department of Natural Resources
MDOT Michigan Department of Transportation
OSC On Scene Coordinator
PCBs Poly-chlorinated biphenyls
PolRep Pollution Report
ppm parts per million
PRP Potentially Responsible Party
START Superfund Technical Assessment & Response Team (US EPA contractor)
TM Technical Memorandum
US EPA United States Environmental Protection Agency
WCS Water Control Structure
WWTP Waste Water Treatment Plant
|
6. Additional sources of information
|
|
6.1 Internet location of additional information/report
http://www.epaosc.org/otsegodam
www.epa.gov/superfund/allied-paper-kalamazoo
6.2 Reporting Schedule
The next PolRep will be generated on June 9.
|
7. Situational Reference Materials
|
|