2.1.1 Narrative
Contractors continued preparations for contaminated sediment and riverbank soil excavation activities, which are expected to start in mid-September. The contaminated sediment staging area was completed and the waste water treatment plant was constructed at the BRSA 1 forward staging area.
2.1.2 Response Actions to Date
The following activities took place during the reporting period:
- Construction of contaminated sediment staging pad in BRSA 1;
- Mobilization and construction of waste water treatment plant in BRSA 1;
- Mobilization and testing of particulate (dust) monitoring system for BRSA 1;
- Commencement of survey/re-location of state-listed endangered mussels in BRSA 1 - 3 target excavation areas to a relocation area
upstream of the M-89 Bridge & Otsego City Water Treatment Plant;
- Bathymetric/hydrographic/overbank surveying
activities;
- Invasive species control (spraying) in BRSA 1 & BRSA 3; and
- Closure of the Kalamazoo River channel from the M-89 bridge to the Otsego Township Dam using buoys and land-based signage.
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
See PolRep #1
2.1.4 Progress Metrics
Waste Stream |
Medium |
Quantity |
Manifest # |
Treatment |
Disposal |
Water bottles |
Plastic |
30 lbs |
NA |
recycling |
local drop-off |
OCC |
Cardboard |
100 lbs |
NA |
recycling |
local drop-off |
Steel |
Metal |
10 lbs |
NA |
recycling |
Shupan Recycling |
|