Otsego Township Dam Area

All POL/SITREP's for this site Otsego Township Dam Area
Otsego Township, MI - EPA Region V
POLREP #9
Progress
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Otsego Township Dam Area - Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region V

Subject: POLREP #9
Progress
Otsego Township Dam Area
059B
Otsego Township, MI
Latitude: 42.4601694 Longitude: -85.7199333


To: Douglas Ballotti, EPA
Samuel Borries, EPA
Mike Ribordy, EPA
Jim Saric, EPA
Mark Mills, MDNR
Polly Synk, MDAG
Cyndi Trobeck, City of Otsego
Valincia Darby, U.S. DOI

From: Paul Ruesch, OSC
Date: 12/28/2016
Reporting Period: 11/24/2016 - 12/28/2016

1. Introduction
  1.1 Background
   
Site Number: 059B    Contract Number:  
D.O. Number:      Action Memo Date: 4/6/2016
Response Authority: CERCLA    Response Type: PRP Oversight
Response Lead: PRP    Incident Category: Removal Action
NPL Status: NPL    Operable Unit: 5
Mobilization Date: 8/1/2016    Start Date: 8/1/2016
Demob Date:      Completion Date:  
CERCLIS ID: MID006007306    RCRIS ID:
ERNS No.:    State Notification: DEQ
FPN#:    Reimbursable Account #: 059B

1.1.1 Incident Category     
Time Critical Removal Action - PRP Oversight

1.1.2 Site Description
See PolRep #1

1.1.2.1 Location
See PolRep #1

1.1.2.2 Description of Threat

See PolRep #1

1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results

See PolRep #1

2. Current Activities
  2.1 Operations Section
   

2.1.1 Narrative

The GC continued restoration activities in BRSA 1. All equipment was demobilized, and the area was opened for public use as parking on December 15. Though set up of the staging / support area in BRSA 3 is underway, fieldwork has been suspended until mid-January.

 2.1.2 Response Actions During Reporting Period

The following activities took place during the reporting period:

- Reconstruction & restoration in BRSA 1 in coordination with Michigan DNR;
- Initial construction activities for support / staging / crew parking area in BRSA 3;
- Investigation derived waste from pre-design sampling was removed for transport & disposal;
- Surveying & staking of potential support / staging areas for BRSAs 3-9; and
- Infrastructure was removed from the riverbank at a private residence in BRSA 4.

2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)

See PolRep #1

2.1.4 Progress Metrics

The following materials were managed during the reporting period. Totals to date are also included.

Waste Stream Medium Quantity Total               Manifest #  Treatment Disposal
 Cardboard solid 50 lbs 480 lbs NA recycling Otsego Recycling Center
 Plastic solid 20 lbs 150 lbs NA recycling Otsego Recycling Center
 Steel solid 810 lbs 5480 lbs various  recycling Broken Arrow Recycling
 Contaminated soil (< 50 ppm* PCBs) solid 2.32 tons 6973.91 tons** various disposal Republic Ottawa County Farms Landfill, Coopersville, MI
 Contaminated soil
(> 50 ppm* PCBs)
solid 0 tons 103.91 tons     various disposal US Ecology Michigan,
Belleville, MI
 Contact water liquid 0 gal           303,075 gal  NA on-site WWTP On-site reuse/discharge to Kalamazoo River
*Note: 1 ppm = 1 mg/kg
**Revised number reflects actual tonnage from final scale tickets at disposal facility

  2.2 Planning Section
   

2.2.1 Anticipated Activities
During the next reporting period, the following activities are expected to occur:

- Continued construction of staging and crew parking area in BRSA 3;
- Surveying and staking in remaining BRSAs;
- Land clearing in access / staging / support areas for BRSAs 3, 4, 6 & 9;
- Obtain access agreements from property owner(s) in BRSAs 8 & 9; and
- Maintenance / monitoring of the temporary WCS.

2.2.1.1 Planned Response Activities

See Sections 2.2.1 & 2.2.1.2

2.2.1.2 Next Steps
- Permits are being obtained from the Allegan County Road Commission and Michigan DOT for anticipated work in or along rights of way for remaining BRSAs;
- A second draft Technical Memorandum for BRSAs 2 & 3 (submitted by AMEC-FW on December 9), was approved by US EPA on December 14;
- AMEC-FW presented the general approach in remaining BRSAs at a planning meeting with stakeholders on December 16; and
- AMEC-FW will facilitate planning meetings for work in remaining BRSAs on January 25 and February 22.

2.2.2 Issues

None

  2.3 Logistics Section
    See PolRep #1

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    No information available at this time.

3. Participating Entities
 

3.1 Unified Command

3.2 Cooperating Agencies

See PolRep #1

4. Personnel On Site
 

On average, the following personnel were present on site during the reporting period: 

US EPA - 1
Michigan DEQ - 1
Michigan DNR - 1
START - 1
Envirocon: 6
AMEC-FW: 1
Spicer Group: 1

TOTAL: 12

5. Definition of Terms
 

AMEC-FW         AMEC Foster Wheeler

BRSA                Bank Removal and Stabilization Area

mg/kg                milligrams per kilogram

Michigan DEQ  Michigan Department of Environmental Quality

Michigan DNR  Michigan Department of Natural Resources     

Michigan DOT  Michigan Department of Transportation

OSC                  On Scene Coordinator

PCBs                Poly-chlorinated biphenyls     

PolRep              Pollution Report

ppm                   parts per million

PRP                  Potentially Responsible Party     

US EPA             United States Environmental Protection Agency

WCS                  Water Control Structure

6. Additional sources of information
 

6.1 Internet location of additional information/report

http://www.epaosc.org/otsegodam

www.epa.gov/superfund/allied-paper-kalamazoo

6.2 Reporting Schedule
The next PolRep will be generated at the end of February.

7. Situational Reference Materials
  No information available at this time.